Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “POWER PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Trace Element Mass Flow Rates from U.S. Coal Fired Power Plants

Trace elements (TEs) exit coal-fired power plants (CFPPs) via solid, liquid, and gaseous waste streams. Estimating the TE concentrations of these waste streams is essential to selecting pollution controls and estimating emission reduction benefits. Our report presents a generalizable mass balance model for estimating TE mass flow rates in CFPP waste streams and evaluates model accuracy for the U.S. coal fleet given current data constraints. We stochastically estimate, using a bootstrapping approach, the 2015 plant-level mass flow rates of Hg, Se, As, and Cl to solid, liquid, and gas phase waste streams by combining publicly available data for combusted coal TE concentrations with estimates of TE partitioning within installed air pollution control processes. When compared with measured and reported data on TE mass flow rates, this model generally overestimates masses by 30–50%, with larger errors for Hg. The partitioning estimates are consistent for Se, As, and Cl removal from flue gas, but tend to underestimate Hg removal. While our model is suitable for first-order estimates of TE mass flows, future work to enhance model performance should focus on collecting and using new data on TE concentrations in the coal blend, where data quality is the weakest.

01 COAL, LIGNITE, AND PEAT↗

Transmission Data-Driven User-Defined Model for Inverter-based and Conventional Power Plants

Recent events in Odessa [1], [2] have shed light on the complexities of integrating large Inverter-Based Resource (IBR) plants with the transmission system, prompting NERC to stress continuous performance monitoring by transmission operators. Challenges such as plant control updates, IBR model revisions, Phase-locked loop loss of synchronism, and protection events have been identified, underscoring the need for enhanced monitoring protocols by regulatory bodies. The recent FERC 901 order underscores the importance of accurate data exchange regarding IBRs for reliability studies. However, limited access to IBR plant-related data hampers effective decision-making for transmission operators (TOP). This paper proposes a method for constructing data-driven User-Defined dynamic Models (UDM) for power plants for validating multiple-event data using field measurements from interconnection bus locations. The problem is formulated as a power plant model identification problem and a multi-task learning approach under partial input observability assumptions is proposed in this work. This approach aims to predict aggregated responses of conventional and IBR power plants during various dynamic physical events which is useful for planning studies under diverse disturbance conditions. Ultimately, this methodology emphasizes the importance of plant visibility to operators in addressing power system challenges, facilitating improved planning and operational studies.

Mahapatra, Kaveri [BATTELLE (PACIFIC NW LAB)]↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Scalable Technologies Achieving Risk-Informed Condition-Based Predictive Maintenance Enhancing the Economic Performance of Operating Nuclear Power Plants

The primary objective of the research presented in this report is to develop scalable technologies that are deployable across plant assets and across the nuclear fleet to achieve risk-informed predictive maintenance (PdM) strategies at commercial nuclear power plants (NPPs). Over the years, the nuclear fleet has relied on labor-intensive and time-consuming preventive maintenance (PM) programs, driving up operation and maintenance (O&M) costs to achieve high capacity factors. A well-constructed risk-informed PdM approach for an identified plant asset has been developed in this research, taking advantage of advancements in data analytics, machine learning (ML), artificial intelligence (AI), physics-informed modeling, and visualization. These technologies would allow commercial NPPs to reliably transition from current labor-intensive PM programs to a technology driven PdM program, eliminating unnecessary O&M costs. The work presented in the report is being developed as part of a collaborative research effort between Idaho National Laboratory and Public Service Enterprise Group Nuclear, LLC. This report (1) reflects the results of work by LWRS Program researchers with PSEG, Nuclear LLC-owned Salem and Hope Creek Nuclear Power Plants; (2) presents utilization of circulating water system (CWS) heterogeneous data and fault modes from both the Salem and Hope Creek nuclear power plant sites to develop salient fault signatures associated with each fault mode; (3) describes the integration of component-level predictive models into a robust system-level model enabled by the federated-transfer learning; (4) describes the development of physics-informed model of circulating water pump and motor; (5) develops a scalable risk and economic model; and (6) outlines the development of a user-centric visualization application. The outcomes presented in this report lays the foundation and provides a much-needed technical basis to focus on explainability and trustworthiness of ML and AI-based technologies, as part of future research.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Economic Analysis of Condition-Monitoring-Based Predictive Maintenance in Power Plants under Market Elasticity

Condition-monitoring-based predictive maintenance can increase the power plant availability by preventing forced outages. However, the actual on-stream time depends on market elasticity and dynamics, which are affected by cost and penetration of other power generation technologies. This paper develops a systematic approach for the economic analysis of investment in condition monitoring technologies with due consideration of market elasticity. Focus is on corrosion monitoring in coal-fired power plants (CFFPs) since corrosion in high-temperature coal-fired boilers is a leading cause of equipment failure. Investment in sensor networks for measuring corrosion and operating conditions like metal temperature and concentrations of O 2 and SO 2 is investigated. The unscented Kalman filter is used to estimate corrosion in the waterwall section of the boiler under multiple sensor networks. Electricity produced by CFPPs in the future in the U.S. due to changes in availability under market elasticity is studied. Sensitivity of the incremental net present value to factors like the number, type, and cost of sensors is analyzed.

Electrochemistry↗

Second law analysis of a conventional steam power plant

A numerical investigation of exergy destroyed by operation of a conventional steam power plant is computed via an exergy cascade. An order of magnitude analysis shows that exergy destruction is dominated by combustion and heat transfer across temperature differences inside the boiler, and conversion of energy entering the turbine/generator sets from thermal to electrical. Combustion and heat transfer inside the boiler accounts for 53.83 percent of the total exergy destruction. Converting thermal energy into electrical energy is responsible for 41.34 percent of the total exergy destruction. Heat transfer across the condenser accounts for 2.89 percent of the total exergy destruction. Fluid flow with friction is responsible for 0.50 percent of the total exergy destruction. The boiler feed pump turbine accounts for 0.25 percent of the total exergy destruction. Fluid flow mixing is responsible for 0.23 percent of the total exergy destruction. Other equipment including gland steam condenser, drain cooler, deaerator and heat exchangers are, in the aggregate, responsible for less than one percent of the total exergy destruction. An energy analysis is also given for comparison of exergy cascade to energy cascade. Efficiencies based on both the first law and second law of thermodynamics are calculated for a number of components and for the plant. The results show that high first law efficiency does not mean high second law efficiency. Therefore, the second law analysis has been proven to be a more powerful tool in pinpointing real losses. The procedure used to determine total exergy destruction and second law efficiency can be used in a conceptual design and parametric study to evaluate the performance of other steam power plants and other thermal systems.

Liu, Geng↗

Project Title: Development of a Pipe Crawler Inspection Tool for Fossil Energy Power Plants (Final Report)

This research effort focuses on the development of a pipe crawler inspection tool for fossil energy power plants. The pipe crawler is tethered and can navigate through 2 inch pipes that are often found in various systems within a power plant. The crawler can navigate through straight pipes and 180 degree elbows and includes instrumentation that can assess the integrity of the pipes. The sensors include a UT sensor for measuring the thickness of the pipe, a range finder and a camera. An additional module is used to prep the surface of the pipe prior to taking thickness measurements. Both bench scale and engineering scale testing was conducted to demonstrate the concept. Multiple crawlers were created and tethered together to distribute the load of the tether so that the crawler can navigate longer pipe distances.

01 COAL, LIGNITE, AND PEAT↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Evalulation of the Specification for Safety-Related Steel Structures for Nuclear Facilities, ANSI/AISC N690-18, for Application to Nuclear Power Plants

This report describes the assessment of the recently published ANSI/AISC N690-18, Specification for Safety-Related Steel Structures for Nuclear Facilities. This work was performed for the U.S. Nuclear Regulatory Commission for potential endorsement of N690-18 for use in the design of nuclear power plants. Currently the NRC endorses the use of an earlier version: N690-1994 (R2004), and thus, a technical review of the updated N690 Specification, which contains significant changes, is warranted. The N690-18 Specification reflects advances and improvements in steel design gained from experience, analytical studies, and experimental data over the years. The N690-18 specification also contains a new Appendix N9 that addresses the design of safety-related steel-plate composite (SC) walls which are a relatively new type of structural member for which previously there has not been any U.S. code or standard that governs its design. The technical review of N690-18 was performed in order to assess the adequacy of the provisions for use by the NRC in updating its regulatory guidance for nuclear power plants. The research developed the technical basis for acceptance of the new specification and also identified areas where additional staff guidance is needed for the design of safety-related steel structures at nuclear power plants. The results of the research have determined that the N690-18 specification is a significant enhancement from the N690-1994 (R2004) edition. The new specification contains substantial upgrades in the design of structural steel and includes new provisions for design of SC wall sections, which can benefit the nuclear power industry as well as the NRC review process. All of the improvements, if endorsed by the NRC with certain regulatory positions, will allow clearer and more consistent regulatory guidance, and will avoid the need for justification by licensees and related reviews each time certain methods or approaches are used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solar pond power plant feasibility study for Davis, California

The feasibility of constructing a solar pond power plant at Davis, California was studied. Site visits, weather data compilation, soil and water analyses, conceptual system design and analyses, a material and equipment market survey, conceptual site layout, and a preliminary cost estimate were studied. It was concluded that a solar pond power plant is technically feasible, but economically unattractive. The relatively small scale of the proposed plant and the high cost of importing salt resulted in a disproportionately high capital investment with respect to the annual energy production capacity of the plant. Cycle optimization and increased plant size would increase the economical attractiveness of the proposed concept.

Wu, Y. C.↗

External Engagement During Evaluations of Shutdown Nuclear Power Plant Sites - 19221

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. A key part of the shutdown site evaluations are visits to the sites. These site visits typically take place over 3 days. The first day is spent at the nuclear power plant site. The second day is spent evaluating the near-site transportation infrastructure, including rail infrastructure, potential heavy-haul routes, and potential rail and barge transload locations. The third day is often spent meeting with community engagement or advisory panels. External engagement activities during site visits are conducted in two areas. The first area involves inviting tribal and state representatives, State Regional Group (SRG) representatives, and Federal Railroad Administration (FRA) representatives to participate in the entire site visit. The SRG representatives are from the Southern States Energy Board, the Western Interstate Energy Board, the Council of State Governments - Midwest, or the Council of State Governments - Eastern Regional Conference, according to the location of the nuclear power plant. State representatives typically represent their state department of energy, state department of environmental or natural resources, State Rail Safety Participation Program, state police, state department of transportation, radiation protection organization, or emergency management organization. Tribal representatives explore issues associated with cultural affiliation and tribal involvement with past and present site activities. As the regulator of the U.S. railroads, the FRA representatives bring unique experience to the site visits. They also coordinate meetings with the railroads that serve the shutdown sites. The second area of external engagement activities during site visits involves meeting with local community engagement or advisory panels. Meeting with local community engagement or advisory panels provides an opportunity to inform these panels on DOE activities and the roles and responsibilities of federal agencies during site decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA's PEM Fuel Cell Power Plant Development Program for Space Applications

NASA embarked on a PEM fuel cell power plant development program beginning in 2001. This five-year program was conducted by a three-center NASA team of Glenn Research Center (lead), Johnson Space Center, and Kennedy Space Center. The program initially was aimed at developing hardware for a Reusable Launch Vehicle (RLV) application, but more recently had shifted to applications supporting the NASA Exploration Program. The first phase of the development effort, to develop breadboard hardware in the 1-5 kW power range, was conducted by two competing vendors. The second phase of the effort, to develop Engineering Model hardware at the 10 kW power level, was conducted by the winning vendor from the first phase of the effort. Both breadboard units and the single engineering model power plant were delivered to NASA for independent testing. This poster presentation will present a summary of both phases of the development effort, along with a discussion of test results of the PEM fuel cell engineering model under simulated mission conditions.

Hoberecht, Mark↗

Dynamic Simulation of a Sub-Critical Coal Fired Power Plant

In order to address the demanding operating conditions for remaining coal-fired power plants, a dynamic model and a suite of tools have been developed for studying load cycling and to find optimization opportunities. A sub-critical steam cycle power plant was modeled in a flow-sheet modeling tool, APROS™. The model represented the firing system, economizer, evaporator, superheat, and reheat systems. Four loads from 100% TMCR to 25% TMCR were calibrated and tested such that low-to-high cycling could be studied. The model was run through various load cycles; one of which is presented here. This modeling is a prototype for general use in developing cutting edge controls products and for maximizing economic, low-emissions, and efficient operation of the existing coal power fleet.

Braun, Timothy↗

Probing-Based Inertia Estimation Method Using Hybrid Power Plants

With the displacement of synchronous generation by inverter-based resources (IBRs), power systems could face the challenge of reduced inertia since IBRs do not inherently contribute to system inertia. Therefore, there is rising interest in monitoring system inertia in real-time applications for situational awareness. In addition, there is a growing number of IBRs that provide fast frequency responses (FFR) in the form of synthetic inertia and P-f droop. It is desirable to quantify the contribution of these FFR controls as equivalent inertia. This paper proposes a probing-based inertia estimation method using a PV-battery hybrid power plant in the Kauai island power system. The method is validated under different operating conditions.

hybrid power plant↗

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up↗