Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Leak Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Eighth Interim Status Report: Model 9975 PCV O-Ring Fixture Long-Term Leak Performance

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200 – 270 ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 ºF and higher temperatures, and in 8 fixtures aging at 300 ºF. The remaining GLT O-ring fixtures aging at 300 ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 ºF for 61 - 85 months, which is still bounding to O-ring temperatures during storage in KArea Complex (KAC). Based on expectations that the fixtures aging at 200 ºF will remain leaktight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270 ºF, with hopes that they may reach a failure condition before the 200 ºF fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 – 300 ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 ºF for 41 - 45 months. Aging and periodic leak testing will continue for the remaining PCV fixtures.

42 ENGINEERING↗

NINTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200 – 270 ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 ºF and higher temperatures, and in 8 fixtures aging at 300 ºF. The earliest 300 °F GLT O-ring fixture failure was observed at 34 months. The remaining GLT O-ring fixtures aging at 300 ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 ºF for 72 - 96 months, which bounds O-ring temperatures anticipated during storage in K-Area Complex (KAC). Based on expectations that the 200 ºF fixtures will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at 270 ºF, with hopes that they may reach a failure condition before the 200 ºF fixtures, thus providing additional time to failure data. High temperature aging continues for 6 GLT-S O-ring fixtures at 200 – 300 ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 300 ºF for 54 - 57 months. No additional O-ring failures have been observed since the last interim report was issued. Aging and periodic leak testing will continue for the remaining PCV fixtures. Additional irradiation of several fixtures is recommended to maintain a balance between thermal and radiation exposures similar to that experienced in storage, and to show the degree of consistency of radiation response between GLT and GLT-S O-rings.

42 ENGINEERING↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (Tenth Interim Status Report)

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperatures. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200 – 270 ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 ºF and higher temperatures, and in 8 fixtures aging at 300 ºF. The earliest 300 °F GLT Oring fixture failure was observed at 34 months. The remaining GLT O-ring fixtures aging at 300 ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 ºF for 84 - 108 months, which bounds O-ring temperatures anticipated during storage in K-Area Complex (KAC). Based on expectations that the 200 ºF fixtures will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at 270 ºF, with hopes that they may reach a failure condition before the 200 ºF fixtures, thus providing additional time to failure data. High temperature aging continues for 5 GLT-S O-ring fixtures at 200 – 300 ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 ºF, and in one GLT-S O-ring fixture aging at 300 ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 - 250 ºF for 66 months. One O-ring fixture has failed since the last interim report was issued. Both O-rings in one GLTS fixture aging at 300 ºF failed to remain leak-tight after 69 months at temperature. Aging and periodic leak testing will continue for the remaining PCV fixtures. Additional irradiation of several fixtures has been performed in the last year to maintain a balance between thermal and radiation exposures similar to that experienced in storage, and to show the degree of consistency of radiation response between GLT and GLT-S O-rings.

42 ENGINEERING↗

ENVIRONMENTAL MONITORING OF LEAKS USING TIME LAPSED LONG ELECTRODE ELECTRICAL RESISTIVITY

Highly industrialized areas pose challenges for surface electrical resistivity characterization due to metallic infrastructure. The infrastructure is typically more conductive than the desired targets and will mask the deeper subsurface information. These challenges may be minimized if steel-cased wells are used as long electrodes in the area near the target. We demonstrate a method of using long electrodes to electrically monitor a simulated leak from an underground storage tank with both synthetic examples and a field demonstration. The synthetic examples place a simple target of varying electrical properties beneath a very low resistivity layer. The layer is meant to replicate the effects of infrastructure. Both surface and long electrodes are tested on the synthetic domain. The leak demonstration for the field experiment is simulated by injecting a high conductivity fluid in a perforated well within the S tank farm at Hanford, and the resistivity measurements are made before and after the leak test. All data are processed in four dimensions, where a regularization procedure is applied in both the time and space domains. The synthetic test case shows that the long electrode ERM could detect relative changes in resistivity that are commensurate with the differing target properties. The surface electrodes, on the other hand, had a more difficult time matching the original target's footprint. The field results shows a lowered resistivity feature develop south of the injection site after cessation of the injections. The time lapsed regularization parameter has a strong influence on the differences in inverted resistivity between the pre and post injection datasets, but the interpretation of the target is consistent across all values of the parameter. The long electrode ERM method may provide a tool for near real-time monitoring of leaking underground storage tanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A small gas inlet system for orbital mass-spectrometer calibrations

A gas inlet system is described for generating precise gas pressures that are to be used as calibration references for the mass spectrometers aboard the dual air density Explorer satellites. This gas inlet system was developed as an inflight calibration technique in which a known amount of onboard gas is released in the satellite cavity and is detected by the mass spectrometer. Although several flight mass spectrometer experiments have been proposed, none make use of the inflight calibration technique described in this report. Laboratory measurements and calibration of the metering leak technique for the gas inlet systems are discussed. The systems tested have metering leak rates between 2 and 4 microliters/sec at 298 K for argon-40, and they produce molecular flow up to 100 torr, which is the highest test pressure in this experiment. Test data show that metering leak rates are reproducible within 1 percent of established means for helium-3, helium-4, and argon-40.

Smith, A.↗

Liquid oxygen (LO2) propellant conditioning concept testing

Testing of a simplified LO2 propellant conditioning concept for future expendable launch vehicles is discussed. Four different concepts are being investigated: no-bleed, low-bleed, use of a recirculation line, and He bubbling. A full-scale test article, which is a facsimile of a propellant feed duct with an attached section to simulate heat input from an LO2 turbopump, is to be tested at the Cold Flow Facility of the Marshall Space Flight Center West Test Area. Work to date includes: design and fabrication of the test article, design of the test facility and initial fabrication, development of a test matrix and test procedures, initial predictions of test output, and heat leak calibration and heat exchanger tests on the test articles.

Perry, Gretchen L. E.↗

Liquid Oxygen (LO2) propellant conditioning concept testing

Marshall Space Flight Center (MSFC) and industry contractors have undertaken activities to develop a simplified liquid oxygen (LO2) propellant conditioning concept for future expendable launch vehicles. The objective of these activities is to reduce operations costs and timelines and to improve safety of these vehicles. The approach followed has been to identify novel concepts through system level studies and demonstrate the feasibility of these concepts through small-scale and full-scale testing. Testing will also provide data for design guidelines and validation of analytical models. Four different concepts are being investigated: no-bleed, low-bleed, use of a recirculation line, and helium (He) bubbling. This investigation is being done under a Joint Institutional Research and Development (JIRAD) program currently in effect between MSFC and General Dynamics Space Systems (GDSS). A full-scale test article, which is a facsimile of a propellant feed duct with an attached section to simulate heat input from a LO2 turbopump, will be tested at the Cold Flow Facility at MSFC's West Test Area. Liquid nitrogen (LN2), which has similar properties to LO2, will be used in place of LO2 for safety and budget reasons. Work to date includes design and fabrication of the test article, design of the test facility and initial fabrication, development of a test matrix and test procedures, initial predictions of test output, and heat leak calibration and heat exchanger tests on the test article. The tests for all propellant conditioning concepts will be conducted in the summer of 1993, with the final report completed by October, 1993.

Perry, Gretchen L. E.↗

Pressure and heat-transfer distributions in a simulated wing-elevon cove with variable leakage at a free-stream Mach number of 6.9

A concern that ingestion of hot boundary-layer gas past a small, localized seal failure in the cove between the Space Shuttle wing and elevon might threaten unprotected elevon structures led to wind-tunnel tests to define cove environment as a function of leak area. The tests were conducted in the Langley 8-foot high-temperatures structures tunnel using a full-scale representation of the Space Shuttle wing-elevon juncture on the reentry surface. Pressure and heating rates were obtained for both attached and separated turbulent flows on the wing at the cove entrance. Results indicated that (1) for attached turbulent flow on the wing, cove heating progressively increased in severity independent of leak aspect ratio as leak area increased to 100 percent of cove entrance area and (2), for separated turbulent flow over the wing, cove environment was intolerably severe.

Deveikis, W. D.↗

Locating Small Leaks in Large Structures

Test tool for detecting minute leads in bimetal joints, welds, or other locations employs fine-control valve and hypodermic needle. Test item is connected in conventional manner to helium mass spectrometer tuned to read extremely small amounts of helium gas. Uniqueness of method is ability to detect tiny leaks, through surfaces, not discoverable by gross coverage of test structures by helium gas.

Lawler, W. F.↗

Hanford double-shell tank testing program - 15341

The corrosion testing program and Hanford regularly tests waste chemistries to analyze threats and develop new corrosion chemistry guidelines. Over the past few years, the focus of testing has been on the threat of leaked wastes in Tank 241-AY-102 (AY-102). From the tests conducted to date, it appears that the potential waste compositions in the annulus of tank AY-102 do not show a propensity for localized corrosion or stress corrosion cracking. The threat of exterior corrosion from the liquid and moisture in the leak detection pit (LDP) is a potential concern that will continue to be evaluated in the coming year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bootstrap inversion technique for atmospheric trace gas source detection and quantification using long open-path laser measurements

Advances in natural gas extraction technology have led to increased activity in the production and transport sectors in the United States and, as a consequence, an increased need for reliable monitoring of methane leaks to the atmosphere. We present a statistical methodology in combination with an observing system for the detection and attribution of fugitive emissions of methane from distributed potential source location landscapes such as natural gas production sites. We measure long (> 500 m), integrated open-path concentrations of atmospheric methane using a dual frequency comb spectrometer and combine measurements with an atmospheric transport model to infer leak locations and strengths using a novel statistical method, the non-zero minimum bootstrap (NZMB). The new statistical method allows us to determine whether the empirical distribution of possible source strengths for a given location excludes zero. Using this information, we identify leaking source locations (i.e., natural gas wells) through rejection of the null hypothesis that the source is not leaking. The method is tested with a series of synthetic data inversions with varying measurement density and varying levels of model–data mismatch. It is also tested with field observations of (1) a non-leaking source location and (2) a source location where a controlled emission of 3.1 × 10 -5 kg s -1 of methane gas is released over a period of several hours. This series of synthetic data tests and outdoor field observations using a controlled methane release demonstrates the viability of the approach for the detection and sizing of very small leaks of methane across large distances (4 + km 2 in synthetic tests). The field tests demonstrate the ability to attribute small atmospheric enhancements of 17 ppb to the emitting source location against a background of combined atmospheric (e.g., background methane variability) and measurement uncertainty of 5 ppb (1 σ ), when measurements are averaged over 2 min. The results of the synthetic and field data testing show that the new observing system and statistical approach greatly decreases the incidence of false alarms (that is, wrongly identifying a well site to be leaking) compared with the same tests that do not use the NZMB approach and therefore offers increased leak detection and sizing capabilities.

03 NATURAL GAS↗

Production Facility Prototype Blower 1000 Hour Test Results II

Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.

42 ENGINEERING↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗

Large Scale Testing of a Foam/Multilayer Insulation Thermal Control System (TCS) for Cryogenic Upper Stages

The development of high energy cryogenic upper stages is essential for the efficient delivery of large payloads to various destinations envisioned in future programs. A key element in such upper stages is cryogenic fluid management (CFM) advanced development/technology. Due to the cost of and limited opportunities for orbital experiments, ground testing must be employed to the fullest extent possible. Therefore, a system level test bed termed the Multipurpose Hydrogen Test Bed (MHTB), which is representative in size and shape (3 meter diameter by 3 meter long with a volume of 18 cubic meters) of a fully integrated space transportation vehicle liquid hydrogen propellant tank has been established. To date, upper stage studies have often baselined the foam/multilayer insulation (FMLI) combination concept; however, hardware experience with the concept is minimal and was therefore selected for the MHTB. The foam element (isofoam SS-1 171 with an average thickness of 3.5 centimeters) is designed to protect against ground hold/ascent flight environments, and allows for the use of a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required with MLI in cryogenic applications. The MLI (45 layers of Double Aluminized Mylar with Dacron spacers) provides protection in the vacuum environment of space and is designed for an on-orbit storage period of 45 days. Several unique features were incorporated in the MLI concept and included: variable density MLI (reduces weight and radiation losses by changing the layer density), larger but fewer DAM perforations for venting during ascent to orbit (reduces radiation losses), and roll wrap installation of the MLI with a commercially established process to lower assembly man-hours and reduce seam heat leak. Thermal performance testing of the MHTB TCS was conducted during three test series conducted between September 1995 and May 1996. Results for the ground hold portion of the tests were as expected producing an average heat leak of 63 WattS/M2 at an average foam surface temperature of 170 K. The results of the simulated orbit hold test interval produced heat leaks ranging from 0.085 to 0.22 Watts/squareM at warm boundary temperatures of 164K and 305K, respectively. When compared to the performance for a traditional MLI system, a 60% reduction in orbital heat leak or boiloff was measured. Overall, the MHTB TCS demonstrated satisfactory performance for all mission phases required of a cryogenic upper stage.

Hastings, Leon↗

Development of a 50 MW Multiple Beam Klystron

The goal of this program was to develop a 50 MW, multiple beam klystron at 11.424 GHz. The device uses eight electron guns and beam lines to achieve the required power level at a beam voltage of 190 kV, consistent with solid state power supplies. The electron gun operates with confined flow focusing, which is unique among current multiple beam sources, and allows operation at power levels consistent with producing 10s of MWs of pulsed RF power. The circuit consists of a ring resonator input cavity, eight sets of buncher cavities, and a ring resonator output cavity. The RF output power is coupled into four rectangular waveguides equally spaced around the klystron. Eight individual collectors absorb the spent beam power in each beam. The klystron operates in a solenoid. The principle challenges in the design included development of the beam optics using confined flow focusing, shaping of the magnetic field in the gun region to avoid beam spiraling, coupling input power equally to all eight beam lines from a single input, and obtaining the required frequency and Q in the output cavity. The mechanical design was particularly complex due to the large parts count, number of braze and weld joints, and close proximity of the beam lines that limited access. Addressing vacuum leaks and cold testing the complex structures was particularly troublesome. At the conclusion of the program, the klystron is experiencing several vacuum leaks that are under repair. Efforts will continue to seal and test the klystron.

43 PARTICLE ACCELERATORS↗