Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “JPL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Report on the loss of the Mars Climate Orbiter Mission : JPL special review board

The Mars Climate Orbiter (MCO) was launched on December 11, 1998. The MCO was to arrive at Mars and begin orbit insertion on September 23, 1999. The Mars Orbit Insertion (MOI) burn, a 16-minute maneuver to slow the spacecraft and enable capture into an orbit around Mars, began on schedule. Five minutes into the maneuver, and approximately 49 seconds before the anticipated time for loss of communication, the MCO was occulted by Mars. Thereafter, no contact with the spacecraft could be established. On September 24, 1999, an internal JPL team (the MCO Peer Review Team) was appointed to help investigate the reason for the loss of spacecraft signal. The Peer Review Team's findings are presented in this report.

Mars Climate Orbiter↗

Recent radiation test results at JPL

This paper documents recent TID (including ELDRS) and proton damage test results obtained by JPL. Unusual test results, such as abnormally low or high failure levels or unusual failure or response mechanisms, are emphasized.

total ionizing dose↗

Optical space communications at JPL

Subsytem and system level technology development at JPL for free-space laser communications from both deep space and near Earth is described. These include acquisition, tracking, and pointing, laser transmitters, photon-counting receivers, coding, modulation, and communication systems.

laser transmitter↗

Validation of Lithium-ion cell technology for JPL's 2003 Mars Exploration Rover Mission

n early 2004 JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling >300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +40 C), withstanding long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of Lithium-ion technology to meet these stringent requirements, a comprehensive test program was implemented aimed at demonstrating the performance capability of prototype cells fabricated by Lithion, Inc. (Yardney Technical Products, Inc.). The testing performed includes, determining the (a) room temperature cycle life, (b) pulse capability as a function of temperature, (e) self-discharge and storage characteristics mission profile capability, (f) cycle life under mission simulation conditions, (g) impedance characteristics, (h) impact of cell orientation, and (i) performance in 8-cell engineering batteries. As will be discussed, the Lithium-ion prototype cells and batteries were demonstrated to meet, as well as, exceed the requirements defined by the mission.

2003 Mars Exploration Rover (MER)↗

Advancing the practice of systems engineering at JPL

This paper describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the people, process and technology aspects of the SEA Project, discusses the various products, services and training that were developed, describes the development approach used, and concludes with several observations or 'lessons learned'.

process improvement↗

Ground testing of the Li-ion batteries in support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(deg)C to +4O(deg)C), withstand long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing performed includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory corrections), (d) simulating the entry, decent, and landing pulse load profile (if required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by LithiodYardney, Inc.) were demonstrated to far exceed the requirements defined by the mission, and are projected to support an extended mission (> 2 years) with margin to spare.

Li-ion batteries↗

The Mars Express/NASA Project at JPL

An overview of the Mars Express/NASA Project at JPL is presented. The topics include: 1) Mars Express Mission Experiments and Investigators; 2) Mars Advanced Radar for Subsurface and Ionospheric Soundig (MARSIS) Overview; 3) MARSIS Experiment Overview; 4) Interoperability Concept; 5) Mars Express Science Operations; 6) Mars Express Schedule (2003-2007);

radar↗

JPL's End Item Data Packages (EIDPs)

A viewgraph presentation on JPL's End Item Data Packages (EIDPs) is shown. The topics include: 1) Background and past efforts; 2) Current effort; and 3) First look; 4) Final look; and 5) Next steps.

End Item Data Package (EIDP)↗

JPL Author Database

A viewgraph presentation describing the background, goals, implementation, uses and future development of JPL's author database is shown.

preprint servers↗

Expanding the Capabilities of the JPL Electronic Nose for an International Space Station Technology Demonstration

An array-based sensing system based on polymer/carbon composite conductometric sensors is under development at JPL for use as an environmental monitor in the International Space Station. Sulfur dioxide has been added to the analyte set for this phase of development. Using molecular modeling techniques, the interaction energy between SO2 and polymer functional groups has been calculated, and polymers selected as potential SO2 sensors. Experiment has validated the model and two selected polymers have been shown to be promising materials for SO2 detection.

electronic noses↗

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission↗

The Mars Express - NASA Project at JPL

This viewgraph presentation gives a general overview of the Mars Express NASA Project at JPL. The contents include: 1) Mars Express/NASA Project Overview; 2) Experiment-Investigator Matrix; 3) Mars Express Support of NASA's Mars Exploration Objectives; 4) U.S./NASA Support of Mars Express; 5) Mars Express Schedule (2003-2007); 6) Mars Express Data Rates; 7) MARSIS Overview Results; 8) MARSIS with Antennas Deployed; 9) MARSIS Science Objectives; 10) Mars Advanced Radar for Subsurface and Ionospheric Sounding (MARSIS) Experiment Overview; 11) Mars Express Orbit Evolution; 12) MARSIS Science - Subsurface Sounding; 13) MARSIS-North Polar Ice Cap; 14) MARSIS Data-Buried Basin; 15) MARSIS over a Crater Basin; 16) MARSIS-Buried Basin; 17) Ionogram - Orbit 2032 (example from Science paper); 18) Ionogram-Orbit 2018 (example from Science paper); and 19) Recent MARSIS Results ESA Press Releases.

Mars Express Mission↗

JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

oversights↗

JPL Facilities and Software for Collaborative Design: 1994 - Present

The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

project design center↗

The JPL Cost Risk Analysis Approach that Incorporates Engineering Realism

This paper discusses the JPL Cost Engineering Group (CEG) cost risk analysis approach that accounts for all three types of cost risk. It will also describe the evaluation of historical cost data upon which this method is based. This investigation is essential in developing a method that is rooted in engineering realism and produces credible, dependable results to aid decision makers.

cost risk↗