Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration Sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Integration of Environmental Compliance at the Savannah River Site - 13024

The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an interagency 'SRS Regulatory Integration Team (SRIT)'. The SRIT is a partnership comprised of representatives from DOE-SR (with contractor support), EPA Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC) and is chartered to develop a consensus understanding of SRS regulatory issues and activities. These forums and a formal environmental compliance integration process improve timely cross-functional decision making, problem solving, information sharing, and issue resolution. The SRS internal process has been formally documented in an Environmental Regulatory Integration Program Description, which is linked to the SRS Environmental Policy and agreed upon by all major contractors, subcontractors and tenants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Safety Analysis of the Gorleben Site: Thermo-mechanical Analysis of the Integrity of the Geological Barrier in the Gorleben Salt Formation - 13307

Exploration work at the Gorleben salt dome has been carried out since 1977 to investigate the site regarding its suitability as a final repository for high-level radioactive wastes. In the framework of the 'Preliminary Safety Analysis of the Gorleben Site' a comprehensive assessment is being performed with focus on long-term safety. Because the integrity of the geological barrier is crucial for protection from damage caused by ionising radiation during the post-operational phase, 2D and 3D thermo-mechanical calculations for a reference section through the salt dome were carried out, all looking at two different waste emplacement concepts: emplacement in drifts and in boreholes. The calculated stresses are the basis for evaluating the barrier integrity on the basis of the dilatancy criterion and the fluid pressure criterion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approaching a universal scaling relationship between fracture stiffness and fluid flow

A goal of subsurface geophysical monitoring is the detection and characterization of fracture alterations that affect the hydraulic integrity of a site. Achievement of this goal requires a link between the mechanical and hydraulic properties of a fracture. Here we present a scaling relationship between fluid flow and fracture-specific stiffness that approaches universality. Fracture-specific stiffness is a mechanical property dependent on fracture geometry that can be monitored remotely using seismic techniques. A Monte Carlo numerical approach demonstrates that a scaling relationship exists between flow and stiffness for fractures with strongly correlated aperture distributions, and continues to hold for fractures deformed by applied stress and by chemical erosion as well. This new scaling relationship provides a foundation for simulating changes in fracture behaviour as a function of stress or depth in the Earth and will aid risk assessment of the hydraulic integrity of subsurface sites.

42 ENGINEERING↗

On-Site Inspection RadioIsotopic Spectroscopy (Osiris) System-Integration and Field-Testing Report

We have designed a system for the acquisition and analysis of high-resolution gamma-ray spectra during on-site inspections under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The On-Site Inspection RadioIsotopic Spectroscopy—OSIRIS —gamma-ray spectrometer is a mechanically-cooled, battery-powered ORTEC IDM-200V, chosen to avoid the need for liquid nitrogen during on-site inspections. The spectrometer is controlled and the spectral data analyzed by a Panasonic Toughbook notebook computer. Spectral data analysis is similar to that performed by traditional gamma-ray spectrometers, except the OSIRIS gamma-ray spectral data are filtered to display only radioisotopic information relevant to CTBT on-site inspections, for example, the fission-product isotope Zr-95 and its daughter isotope Nb-95. The OSIRIS software assists the user during operation with software checklists for startup and shutdown, and menu-selected display windows during energy calibration and data acquisition. OSIRIS can be operated in either sample-counting mode or the in-situ mode. In this report, the extensive system-integration tests of the OSIRIS system carried out in 2015-2017 are described, including tests at Idaho National Laboratory, at the Nevada National Security Site (formerly, the Nevada Test Site), and at Pacific Northwest National Laboratory in Richland, Washington. We also note recent software enhancements and the steps to our successful commercialization of OSIRIS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Informing Geologic CO 2 Storage Site Management Decisions under Uncertainty: Demonstration of NRAP's Integrated Assessment Model (NRAP-IAM-CS) Application

Managing risks at geologic CO 2 storage sites requires making decisions based on the quantitative predictions of long-term performance that not only take into account various subsurface hydrologic, geochemical processes and interactions but also the related uncertainties. The US DOE (United States Department of Energy) funded National Risk Assessment Partnership (NRAP) has developed a quantitative approach and a model to predict the long-term behavior of GCS sites. The approach uses an integrated assessment model (NRAP-IAM-CS) that couples reduced order models (ROMs) for various GCS components (such as storage reservoir, wells, seals, and groundwater aquifer) in a stochastic modeling framework that allows for rapid simulations of entire system behavior over thousands of years while probing uncertainties. We demonstrate application of NRAP-IAM-CS using two examples that focus on CO 2 leakage and resulting impacts. The examples are used to demonstrate how different uncertain parameters affect overall performance objectives.

03 NATURAL GAS↗

Heuristic algorithms for design of integrated monitoring of geologic carbon storage sites

Designs for Risk Evaluation and Management (DREAM) is a tool developed under the National Risk Assessment Partnership (NRAP) to enhance geologic carbon storage safety and efficiency. Using potential leakage scenarios generated externally by the users preferred history-matching approach, DREAM constructs ideal combinations of sensor locations in the right place at the right time to detect as many leaks as possible, detect them as early as possible, and minimize cost. This user-friendly tool, developed in Java, features a window-based GUI for input and a 3D visualization tool for viewing the domain space and optimized monitoring plans. DREAM's latest version accommodates real-world usage by allowing for joint optimization of wellbore point sensor placements and surface geophysics survey geometries, and by using more efficient multi-objective optimization algorithms. We show an example where, these two improvements combined allow us to support containment assurance and go from detecting 80–90 % of the potential CO 2 leakage to +99.7 %, a step-change improvement that can make the deciding difference in whether a site is suitable for geologic carbon storage. Though developed for geologic carbon storage, this tool would be equally applicable in many surface or offshore environmental monitoring projects.

58 GEOSCIENCES↗

Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field Scale Subsurface Research Challenge Site at Rifle, Colorado, February 2011 to January 2012

The Rifle IFRC continued to make excellent progress during the last 12 months. As noted above, a key field experiment (Best Western) was performed during 2011 as a logical follow-on to the Super 8 field experiment preformed in 2010. In the Super 8 experiment, we successfully combined desorption and bioreduction and deployed a number of novel tracer techniques to enhance our ability to interpret the biogeochemistry of the experiment. In the Best Western experiment, we used the same experimental plot (Plot C) as was used for Super 8. The overarching objective of the Best Western field experiment was to compared the impacts of abiotic vs. biotic increases in alkalinity and to assess the mass of the sorbed pool of U(VI) at Rifle at the field scale. Both of these objectives were met. Preliminary analysis of the data indicate that the underlying biogeochemical data sets were obtained that will support a mechanistic understanding of the underlying processes, including remarkable insight into previously unrecognized microbial processes taking place during acetate amendment of the subsurface for a second time.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Composite Analysis Technical Approach Description: Integrated Computational Framework.

The U.S. Department of Energy (DOE) in DOE O 435.1 Chg. 1, Radioactive Waste Management, requires the preparation and maintenance of a composite analysis (CA). The primary purpose of the CA is to provide a reasonable expectation that the primary public dose limit is not likely to be exceeded by multiple source terms that may significantly interact with plumes originating at a low-level waste disposal facility. The CA is used to facilitate planning and land use decisions that help assure disposal facility authorization will not result in long-term compliance problems; or, to determine management alternatives, corrective actions, or assessment needs if potential problems are identified.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UAS Integration in the NAS Project Test Site Kick-off Meeting

This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

Unmanned↗

Meeting Hanford's Infrastructure Requirements - 12505

Hanford, by all accounts, is an enormous and complex project, with thousands of disparate, but co-mingled activities in motion on any given day. The primary target of the mission at Hanford is cleanup of the 586 square-mile site, but there is the equally vital mission of site services and infrastructure. Without functions like the well-maintained site roads, electricity, water, and emergency management services, not a single cleanup project could be undertaken. As the cleanup projects evolve - with new work-scope emerging, while existing projects are completed - there becomes a very real need to keep projects integrated and working to the same 'blueprint'. And the Hanford blueprint extends for years and includes myriad variables that come with meeting the challenges and complexities associated with Hanford cleanup. Because of an innovative and unique contracting strategy, the Department of Energy (DOE) found a way to keep the cleanup projects un-encumbered from the side task of having to self-provide their individual essential site services, thus allowing the cleanup contractors to concentrate their efforts on their primary mission of cleaning up the site. These infrastructure and support services also need to be provided efficiently and cost effectively - done primarily through 'right-sizing' efforts. The real innovation came when DOE had the foresight to include a second provision in this contract which specifically asked for a specialized role of site integrator and innovator, with a special emphasis placed on providing substantial cost savings for the government. The need for a true site integrator function was necessitated by the ever-increasing complexity of projects at Hanford and the progression of cleanup at others. At present, there are two main DOE offices overseeing the cleanup work and six primary contractors performing that work. Each of these contractors works to separate schedules and cleanup milestones, and the nature of the cleanup differs, but all are intertwined in their need for essential site services. One of the key tasks spelled out in the Mission Support Contract (MSC) is to take the volumes of cost, schedule and budget forecasting data each contractor is responsible for and consolidate that data into a 'one Hanford' perspective, with a clear and well-defined 'map' of the future, taking into account the many cross-cutting priorities at the site. This function is termed 'portfolio management' in the MSC. In 2009, the DOE awarded the MSC to Mission Support Alliance, LLC. (MSA), a team made up of industry leaders with key government services credentials, Lockheed Martin, Jacobs Engineering and WSI. Now into its third year managing the contract, MSA has continually shown tangible results in its oversight of the MSC. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

Hybrid Transportation System Integrated Trajectory Design and Optimization for Mars Landing Site Accessibility

NASA’s Mars Study Capability Team continues the agency’s efforts to study and refine the nation’s plan to field a sustainable human Mars campaign. One of the primary open issues left unanswered during previous analysis cycles was the uncertainty of the impact to the vehicle performance requirement to deliver crew and cargo to the same landing site across multiple mission opportunities. The Mars Study Capability Team has recently developed an integrated trajectory optimization and system closure model to solve the complex interplanetary trajectory optimization using both low-thrust and high-thrust maneuvers. This paper demonstrates the capability of this new integrated trajectory design and optimization method as it applies to the landing site accessibility problem for the Hybrid transportation architecture. The results showed that the current vehicle is capable of reaching up to +20 degree latitude and down to -20 degree latitude in every mission opportunity from 2033 to 2052. However, reaching latitudes beyond +/- 20 required more propellant than the spacecraft is currently designed to carry for many of the mission opportunities.

Chai, Patrick R.↗

Building Toward a Small Wind Turbine Site Assessor Credential (Presentation)

Proper site assessment is integral to the development of a successful small wind project. Without a small wind site assessor certification program, consumers, including state incentive program managers, lack a benchmark for differentiating between qualified and nonqualified site assessors. A small wind site assessor best practice manual is being developed as a resource for consumers until a credential program becomes available. This presentation describes the purpose, proposed content, and the National Renewable Energy Laboratory's approach to the development of such a manual.

17 WIND ENERGY↗

Text Mining Improves Prediction of Protein Functional Sites

We present an approach that integrates protein structure analysis and text mining for protein functional site prediction, called LEAP-FS (Literature Enhanced Automated Prediction of Functional Sites). The structure analysis was carried out using Dynamics Perturbation Analysis (DPA), which predicts functional sites at control points where interactions greatly perturb protein vibrations. The text mining extracts mentions of residues in the literature, and predicts that residues mentioned are functionally important. We assessed the significance of each of these methods by analyzing their performance in finding known functional sites (specifically, small-molecule binding sites and catalytic sites) in about 100,000 publicly available protein structures. The DPA predictions recapitulated many of the functional site annotations and preferentially recovered binding sites annotated as biologically relevant vs. those annotated as potentially spurious. The text-based predictions were also substantially supported by the functional site annotations: compared to other residues, residues mentioned in text were roughly six times more likely to be found in a functional site. The overlap of predictions with annotations improved when the text-based and structure-based methods agreed. Our analysis also yielded new high-quality predictions of many functional site residues that were not catalogued in the curated data sources we inspected. We conclude that both DPA and text mining independently provide valuable high-throughput protein functional site predictions, and that integrating the two methods using LEAP-FS further improves the quality of these predictions.

59 BASIC BIOLOGICAL SCIENCES↗

Site and endmember spectra of terrestrial vegetation and soils for the Colorado Headwaters Ecological Spectroscopy Study, June-July 2025

This dataset provides site and endmember spectra collected during the 2025 Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign. The site spectra were collected to help validate airborne hyperspectral data acquired by the National Ecological Observatory Network's aerial observation platform (NEON AOP). Endmember spectra were collected to augment existing spectral libraries with additional samples of bare surfaces and non-photosynthetic vegetation. All measurements were acquired with an Analytical Spectral Devices (ASD) FieldSpec4 Hi-Res NG (Next Generation) spectroradiometer, which records radiance at 1nm (nanometer) intervals from the ultraviolet to the short-wave infrared (350-2500 nm). The dataset includes spectra measured at meadow sites where the CHESS team also collected vegetation samples for trait analyses. The site spectra were collected with the ASD FieldSpec4 palm grip attachment using an 8° field-of-view foreoptic. Site spectra are integrated measurements of the entire surface within the foreoptic’s field of view. For site-level spectra, the sun is the illumination source. A Spectralon panel mounted on a tripod was used for instrument optimization and white reference measurements for all site spectra. Site spectra were acquired within two hours of solar noon and within 48 hours of a NEON AOP overflight. Site spectra are labeled by date, sampling area, and site number according to the naming conventions of the CHESS campaign’s data management plan. The dataset also contains endmember spectra in the following categories: photosynthetic vegetation (PV), non-photosynthetic vegetation (NPV), bare (soil/rock), and flowers. Endmember measurements were acquired using either the contact probe or the leaf clip attachments of the ASD FieldSpec4. In these configurations, the bulb inside the spectrometer provides the light source for the measurements. The spectrometer was optimized and white reference measurements were recorded using the circular white pucks attached to the contact probe and leaf clip. Because they do not rely on solar illumination, contact probe and leaf clip measurements were collected during a broader time frame than the palm grip site spectra. Some endmembers were measured at CHESS meadow sites, while others were collected within the larger sampling area or in nearby locations (e.g. Gothic Townsite) with similar characteristics. Radiance, reflectance, and metadata files are split into three subfolders according to measurement type: proximal/palm grip (prx), contact probe (cp), and leaf clip (lc). Radiance spectra are provided in ASD file format (.asd file extension). All ASD files can be opened using the provided scripts. Metadata is provided in two formats: CSV file format (no geolocation) and GEOJSON file format (includes geolocation for each spectra). The dataset includes a set of pre-processed reflectance spectra as CSV files (yyyymmdd_rfl.csv). The python scripts and jupyter notebook used to calculate reflectance spectra from the ASD radiance data is included here and was previously published at: https://doi.org/10.3334/ORNLDAAC/2446. There is also a folder of JPEG photographs corresponding to selected spectra. We include a protocol document with detailed steps for ASD FieldSpec4 assembly and operations. This data additionally contains a file level metadata (flmd.csv) and data dictionary (dd.csv) file. Geospatial information: Geospatial data for mapping measurement site locations are in the files CHESS_polygons_lai_UTM.geojson, CHESS_polygons_shrub_UTM.geojson, and CHESS_polygons_meadow_UTM.geojson in the companion geospatial package for the 2025 CHESS campaign, ‘CHESS 2025: Location data for field observations and sampling’ (Henderson et al., 2026). CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. Funding Acknowledgment: This research was carried out at the Jet Propulsion Laboratory, California Institute of Technology, under a contract with the National Aeronautics and Space Administration (80NM0018D0004) and was funded by EMIT Extended Mission Phase E Science.

2018 NEON and 2025 CHESS Campaigns↗