Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Heat integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Preliminary assessment of rover power systems for the Mars Rover Sample Return Mission

Four isotope power system concepts were presented and compared on a common basis for application to on-board electrical prime power for an autonomous planetary rover vehicle. A representative design point corresponding to the Mars Rover Sample Return (MRSR) preliminary mission requirements (500 W) was selected for comparison purposes. All systems concepts utilize the General Purpose Heat Source (GPHS) isotope heat source developed by DOE. Two of the concepts employ thermoelectric (TE) conversion: one using the GPHS Radioisotope Thermoelectric Generator (RTG) used as a reference case, the other using an advanced RTG with improved thermoelectric materials. The other two concepts employed are dynamic isotope power systems (DIPS): one using a closed Brayton cycle (CBC) turboalternator, and the other using a free piston Stirling cycle engine/linear alternator (FPSE) with integrated heat source/heater head. Near-term technology levels have been assumed for concept characterization using component technology figure-of-merit values taken from the published literature. For example, the CBC characterization draws from the historical test database accumulated from space Brayton cycle subsystems and components from the NASA B engine through the mini-Brayton rotating unit. TE system performance is estimated from Voyager/multihundred Watt (MHW)-RTG flight experience through Mod-RTG performance estimates considering recent advances in TE materials under the DOD/DOE/NASA SP-100 and NASA Committee on Scientific and Technological Information programs. The Stirling DIPS system is characterized from scaled-down Space Power Demonstrator Engine (SPDE) data using the GPHS directly incorporated into the heater head. The characterization/comparison results presented here differ from previous comparison of isotope power (made for LEO applications) because of the elevated background temperature on the Martian surface compared to LEO, and the higher sensitivity of dynamic systems to elevated s

Bents, D. J.↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Aerothermal loads analysis for high speed flow over a quilted surface configuration

Attention is given to hypersonic laminar flow over a quilted surface configuration that simulates an array of Space Shuttle Thermal Protection System panels bowed in a spherical shape as a result of thermal gradient through the panel thickness. Pressure and heating loads to the surface are determined. The flow field over the configuration was mathematically modeled by means of time-dependent, three-dimensional conservation of mass, momentum, and energy equations. A boundary mapping technique was then used to obtain a rectangular, parallel piped computational domain, and an explicit MacCormack (1972) explicit time-split predictor corrector finite difference algorithm was used to obtain steady state solutions. Total integrated heating loads vary linearly with bowed height when this value does not exceed the local boundary layer thickness.

Olsen, G. C.↗

Aerothermal loads analysis for high speed flow over a quilted surface configuration

Attention is given to hypersonic laminar flow over a quilted surface configuration that simulates an array of Space Shuttle Thermal Protection System panels bowed in a spherical shape as a result of thermal gradients through the panel thickness. Pressure and heating loads to the surface are determined. The flow field over the configuration was mathematically modeled by means of time-dependent, three-dimensional conservation of mass, momentum, and energy equations. A boundary mapping technique was then used to obtain a rectangular, parallelepiped computational domain, and an explicit MacCormack (1972) explicit time-split predictor-corrector finite difference algorithm was used to obtain steady state solutions. Total integrated heating loads vary linearly with bowed height when this value does not exceed the local boundary layer thickness.

Olsen, G. C.↗

Life cycle analysis of a hydrogen production system based on solid oxide electrolysis cells integrated with different energy and wastewater sources

Hydrogen production via water electrolysis is a promising and evolving technology. The solid oxide electrolysis cell (SOEC) is one of the several technologies for this purpose. They are alternatives to the traditional hydrogen production from fossil fuels to enhance global energy decarbonization. However, in the bid for sustainability and a green economy, these technologies are not free from causing some environmental burdens. Using life cycle assessment (LCA), the greenhouse gas emission and degree of environmental impacts by these technologies can be identified and measured throughout their lifespan. This study addresses how to quantify these CO 2 emission impacts for an electrolytic system with different energy sources. The LCA of a novel integrated hydrogen production SOEC system with energy from solar photovoltaic and bituminous powerplant is performed using simaPro, the leading global LCA solution software. Measuring the environmental impact of the electrolytic operation in terms of weight, the bituminous powerplant poses damage which is, on average 700% more than solar PV. The thermal-to-hydrogen efficiency of the SOEC system is 56%, and a probable 28% reduction in carbon footprint with heat integration. The steam generation and the manufacturing of the SOEC have a very high environmental impact potential on the system. Here, we recommend LCA and net energy analysis is carried out for every new hydrogen technology and adequate comparison to enhance sustainable and green economy.

08 HYDROGEN↗

Modeling of Radiative Heating in Base Region of Jovian Entry Probe

A theoretical model is derived to determine the average thermodynamic properties in the expanding region, recirculating region, recompression region, and neck region through application of one-dimensional conservation equations. Radiative transfer is calculated using spectrally detailed computer codes accounting for nonequilibrium. The results show that the most severe heating occurs immediately behind the frustum, and that the recompression and neck regions are the major sources of radiation that heats the base stagnation point, The radiation flux to the base point is slightly stronger with ablation than without. Its value is 0.11(43 P(sub b)/P(sub s))(sup 2) times that to the front stagnation point where the base pressure P(sub b) is defined as the average pressure in the recirculating region and P(sub s) is the front stagnation-point pressure. The time-integrated heat load to the base point is 18(43 P(sub b)/P(sub s))(sup 2) kJ/sq cm.

Park, Chul↗

Parametric Weight Comparison of Advanced Metallic, Ceramic Tile, and Ceramic Blanket Thermal Protection Systems

A parametric weight assessment of advanced metallic panel, ceramic blanket, and ceramic tile thermal protection systems (TPS) was conducted using an implicit, one-dimensional (I-D) finite element sizing code. This sizing code contained models to account for coatings fasteners, adhesives, and strain isolation pads. Atmospheric entry heating profiles for two vehicles, the Access to Space (ATS) vehicle and a proposed Reusable Launch Vehicle (RLV), were used to ensure that the trends were not unique to a certain trajectory. Ten TPS concepts were compared for a range of applied heat loads and substructural heat capacities to identify general trends. This study found the blanket TPS concepts have the lightest weights over the majority of their applicable ranges, and current technology ceramic tiles and metallic TPS concepts have similar weights. A proposed, state-of-the-art metallic system which uses a higher temperature alloy and efficient multilayer insulation was predicted to be significantly lighter than the ceramic tile stems and approaches blanket TPS weights for higher integrated heat loads.

Myers, David E.↗

Parametric Weight Comparison of Current and Proposed Thermal Protection System (TPS) Concepts

A parametric weight assessment of advanced metallic panel, ceramic blanket, and ceramic tile thermal protection systems (TPS) was conducted using an implicit, one-dimensional (1 -D) thermal finite element sizing code. This sizing code contained models to ac- count for coatings, fasteners, adhesives, and strain isolation pads. Atmospheric entry heating profiles for two vehicles, the Access to Space (ATS) rocket-powered single-stage-to-orbit (SSTO) vehicle and a proposed Reusable Launch Vehicle (RLV), were used to ensure that the trends were not unique to a particular trajectory. Eight TPS concepts were compared for a range of applied heat loads and substructural heat capacities to identify general trends. This study found the blanket TPS concepts have the lightest weights over the majority of their applicable ranges, and current technology ceramic tiles and metallic TPS concepts have similar weights. A proposed, state-of-the-art metallic system which uses a higher temperature alloy and efficient multilayer insulation was predicted to be significantly lighter than the ceramic tile systems and approaches blanket TPS weights for higher integrated heat loads.

Myers, David E.↗

AN MHD AVALANCHE IN A MULTI-THREADED CORONAL LOOP

For the first time, we demonstrate how an MHD avalanche might occur in a multithreaded coronal loop. Considering 23 non-potential magnetic threads within a loop, we use 3D MHD simulations to show that only one thread needs to be unstable in order to start an avalanche even when the others are below marginal stability. This has significant implications for coronal heating in that it provides for energy dissipation with a trigger mechanism. The instability of the unstable thread follows the evolution determined in many earlier investigations. However, once one stable thread is disrupted, it coalesces with a neighboring thread and this process disrupts other nearby threads. Coalescence with these disrupted threads then occurs leading to the disruption of yet more threads as the avalanche develops. Magnetic energy is released in discrete bursts as the surrounding stable threads are disrupted. The volume integrated heating, as a function of time, shows short spikes suggesting that the temporal form of the heating is more like that of nanoflares than of constant heating.

79 ASTRONOMY AND ASTROPHYSICS↗

In situ recovery of bio-based carboxylic acids

The economics of chemical and biological processes is often dominated by the expense of downstream product separations from dilute product streams. Continuous separation techniques, such as in situ product recovery (ISPR), are attractive in that they can concentrate products from a reactor and minimize solvent loss, thereby increasing purity and sustainability of the process. In bioprocesses, ISPR can have an additional advantage of increasing productivity by alleviating product inhibition on the microorganism. In this work, we developed a liquid–liquid extraction (LLE)-based ISPR system integrated with downstream distillation to selectively purify free carboxylic acids, which were selected as exemplary bioproducts due to their ability to be produced at industrially relevant titers and productivities. Equilibrium constants for the extraction of carboxylic acids into a phosphine-oxide based organic phase were experimentally determined. Complete recovery of acids from the extractant and recyclability of the organic phase were demonstrated through multiple extraction–distillation cycles. Using these data, an equilibrium model was developed to predict the acid loading in the organic phase as a function of the extraction equilibrium constant, initial aqueous acid concentration, pH, organic to aqueous volume ratio, and temperature. A distillation process model was then used to predict the energy input required to distill neat acid from an organic phase as a function of the acid loading in the organic phase feed. The heat integrated distillation train can achieve neat recovery of acetic acid with an energy input of 2.6 MJ kg -1 of acetic acid. This LLE-based ISPR system integrated with downstream distillation has an estimated carbon footprint of less than 0.36 kg CO 2 per kg of acetic acid, and provides a green approach to enable both new industrial bioprocesses, and process intensification of existing industrial operations by (1) increasing the productivity and titer of the bioprocess via decreasing end-product inhibition, (2) minimizing downstream separation energy input to less than 20% of the heating value of the product, and (3) generating no waste products.

09 BIOMASS FUELS↗

Demonstrating non-isothermal vacuum membrane air dehumidification for efficient next-generation air conditioning

Vacuum membrane air dehumidification has gained significant interest in recent years as a highly efficient means of air dehumidification. Prior theoretical modeling work by the authors introduced the Active Membrane Energy Exchanger (AMX) concept, which combines active heat exchange and vacuum membrane dehumidification into one non-isothermal system, and found that it could outperform other air conditioning technologies under many conditions. However, no experimental literature exists on combining active heat exchangers and vacuum membrane dehumidification. Here, the goal of the present study is to evaluate the dehumidification (mass transfer) performance of the AMX concept relative to isothermal membrane dehumidification through three main methodologies: (1) membrane material-level characterization, (2) experimental prototype development and testing, and (3) computational fluid dynamics (CFD) simulations. The dense membranes used in this work showed up to a 40% increase in water vapor permeance at cooler temperatures, and the prototype system showed up to a 6% increase in humidity removal when the air was simultaneously cooled. Furthermore, the membrane module-integrated heat exchange tubes provided additional mixing and turbulence, leading to a 4–8% increase in humidity removal. The upper limit coefficient of performance was equal to approximately 2.2, necessitating advanced system designs to improve efficiency. This study is the first to highlight that combining the cooling and vacuum dehumidification processes can improve dehumidification performance.

30 DIRECT ENERGY CONVERSION↗

Resolving ECRH deposition broadening due to edge turbulence in DIII-D

Microwave heat pulse propagation experiments have demonstrated a correlation between millimeter-scale turbulence and deposition profile broadening of electron cyclotron (EC) waves on the DIII-D tokamak. In a set of discharges in DIII-D, a variation in edge density fluctuations on the mm-scale is associated with 40%–150% broader deposition profiles, expressed in terms of normalized minor radius, as compared with equilibrium ray tracing. The 1D power profile is determined from transport analysis of the electron temperature response to EC power modulation using perturbative analysis with a square wave power modulation at 20–70 Hz, producing a series of Fourier harmonics that are fit collectively to resolve transport. Fitting an integrated heat flux expressed in the Fourier basis of the modulation to diffusive, convective, and coupled transport terms in a linear model can resolve the broadened EC deposition width from the power perturbation to resolve a broadening in each case. The best fit degree of beam broadening observed scales approximately linearly with the Doppler backscattering measured fluctuation level in the steep gradient region. Quantifying the effect of edge fluctuation broadening on EC current drive power needs of future devices will require 3D full-wave codes that can be validated on the current generation of machines. These DIII-D experiments provide a quantitative measure of fluctuation effects and a dataset to benchmark full-wave simulations that can model and eventually predict nonlinear effects neglected by 1D equilibrium beam and ray tracing.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lab-scale Development of a Hybrid Capture System with Advanced Membrane, Solvent system, and Process Integration

The objective of the project is to achieve lab-scale demonstration of a transformational hybrid membrane/solvent system for the capture of CO 2 from flue gas. A novel process integration scheme was proposed to overcome the low partial pressure of CO 2 present in flue gas. This scheme takes advantage of the potential synergies inherent in the membrane and solvent capture systems. The proposed hybrid technology replaces the second-stage membrane with a solvent capture process. The combustion air is used as a sweeping gas in the solvent stripper. This overall configuration has the major advantages of requiring much less air and eliminating the problems associated with oxygen slip in the membrane-based systems. Even more importantly, because of the presence of the air sweep in the stripper, much lower temperatures are required for solvent regeneration, which enables heat integration to the point that no process steam is required. This project was to perform lab-scale demonstration of Liquid Ion Solutions (LIS) transformational hybrid membrane/solvent system for post-combustion CO 2 capture while demonstrating significant progress toward achievement of the overall fossil energy performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. This report is written chronologically based on budget periods. Each budget period discusses the work performed and its results. At the end of each budget period the milestone charts are provided to show the progress. This project was not able to meet its stated goals. The performances of the power plant equipped with the hybrid process and Baseline Case B12B were compared. The simulation results showed that the power plant equipped with hybrid CO2 capture process has an improved thermal efficiency of 33.4% compared to the Baseline Case B12B, which is 32.5%. However, the COE for the hybrid process is $146.3/MWh which is higher than the $142.8/MWh for Case B12B. If this process were to be applied as a retrofit, it may make sense to use this configuration as it does not require any change in an existing plant configuration and steam cycle. However, for a new powerplant the capital cost is higher than the Case B12B. On the membrane development side, we successfully showed that interfacially-controlled envelope (ICE) membranes work. The inclusion of surface modified nano-particles results in much higher gas diffusivities. The Gen-1 ICE membrane developed under this project showed exceptional improved permeability for CO 2 . However, we ran into major problems which were associated with the scalability and reproducibility of the poly(phosphozene) polymers. The issues with scale-up are and batch to batch variability is also discussed. At the end of this report we have provided our recommendations on materials development for better membrane materials and alluded to the use of much simpler chemistry while keeping the concept of ICE membrane intact. It is also clear that vacuum and compression equipment is costly. If a process which can eliminate the use of vacuum and compression equipment would significantly decrease the overall cost of capture. Some thoughts regarding such system is also provided in the outlook portion of this report.

20 FOSSIL-FUELED POWER PLANTS↗

Performance of an Integrated Gasification Direct-Fired Supercritical CO2 Power Cycle

This presentation discusses development and performance results of a coal gasification system integrated with a direct-fired supercritical CO2 (sCO2) power cycle. In this plant, coal is first gasified and cleaned in order to avoid introducing sulfur and particulate matter into the sCO2 cycle, with the sCO2 cycle’s oxy-combustor burning the cleaned syngas with oxygen in a recycled sCO2 stream. The plant is inherently amenable to carbon capture and storage (CCS) processes, as it produces a high pressure exhaust stream that is largely comprised of CO2. The baseline direct sCO2 cycle performance is discussed and compared to IGCC and oxy-coal AUSC reference plants with CCS. The sensitivity of the sCO2 cycle’s performance to various operating parameters is also discussed, as well as the effect of various heat integration options on thermal efficiency, operability, and cost.

Shelton, Walter↗

Techno-Economic Analysis of an Intensified Integrated Gasification Combined Cycle (IGCC) Power Plant Featuring a Combined Membrane Reactor - Adsorptive Reactor (MR-AR) System

In this work, the novel concept of a combined membrane-adsorptive reactor sequence (MRAR) is developed and implemented in an Integrated Gasification Combined Cycle (IGCC) plant. This novel MR-AR IGCC plant is subsequently analyzed from an economic viewpoint through a techno-economic analysis (TEA) of the proposed plant. This novel design can achieve over 90% carbon capture without the use of a Dual-Stage Selexol unit. The resultant intensified design is more efficient from both an economic and power production perspective than the traditional IGCC plants with pre-combustion Carbon-Capture Storage (CCS) technology. The COMSOL software package is utilized to simulate the MR-AR sequence proposed in this work, and the UNISIM software (HoneywellTM) is used to create an intensified process flowsheet of the proposed MR-AR IGCC plant, which is subsequently heat-integrated. The TEA developed for the MR-AR IGCC power plant will be used to identify the extent of process intensification the proposed design has over the traditional IGCC plants with pre-combustion CCS. Furthermore, the results demonstrate a reduction in both the cost-of-electricity (COE) and in the capital cost of the proposed design over the baseline case.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

FEED Study of Carbon Capture Inc. DAC and CarbonCure Utilization Using United States Steel's Gary Works Waste Plant

Direct Air Capture (DAC) has been proposed as a means of reducing atmospheric concentrations of CO2. While DAC has been evaluated through lab-scale, bench-scale, and small-scale pilot units, large-scale deployment has not been achieved. Feasibility studies are one tool to understand the potential design, operation, performance, and impact of commercial-scale DAC. This paper presents the results of a feasibility study for a passive DAC system deployed at >100,000 tpy scale in three different regions across the U.S. and awarded to Carbon Collect by the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). The MechanicalTree™technology has been designed and engineered by Carbon Collect based on the concept initially developed at Arizona State University Center for Negative Carbon Emissions. It uses a tower of stacked, sorbentcontaining disks supported by a lifting mechanism, exposed to the air to capture CO2 during the adsorption phase. The disks are then lowered into a regeneration chamber for vacuum and steam regeneration to produce CO2 product during the desorption step. The modular tree design allows large installations with repeatable, mass-manufactured units connected to common utilities such as steam supply, vacuum, and CO2 processing for compression and geologic storage. The passive DAC system eliminates the equipment and energy of forced air fans by using natural air circulation to contact the sorbent with the CO2 in the air. Because of this, the performance is dependent on the wind speed in addition to the temperature and relative humidity. Performance and flow rate fluctuations were incorporated into equipment and facility design with considerations for turndown to 10% of maximum rated flow to allow operation in all seasons. The feasibility study was undertaken to evaluate the technology in different regions and climates. Three locations were selected for this study representing different climates: Alabama (hot and humid), California (hot and arid), and Wyoming (continental). For each region, the adsorption/desorption cycle was optimized including tuning the heat integration and cycle timings. The performance of individual trees was then scaled to the full facility with the same design of more than 20,000 trees common between all regions. The installations had expected average CO2 capture rates of between 330,000 and 485,000 tonnes of CO2 per year depending on the climate. The initial engineering design for the facility at each location was performed with cost and performance estimates for the trees, carbon purification and compression, and the balance of plant. To supply thermal and electrical energy for the facility, carbon-free or low-carbon power must be considered. Options for low-carbon, continuous thermal and electrical energy were considered. The best-performing option from those considered was identified to be an electrically-heated molten salt energy storage system, powered by an on-site photovoltaic field. During molten salt thermal discharge, steam is produced from heat exchange with the molten salt and used to generate power in a steam turbine as well as steam for regenerating the DAC carbon trees. The thermal and electrical supply and analysis is presented in the context of low-carbon power for carbon removal. Modelling and economics of transportation and geologic storage of the CO2 is considered and presented for each location. The results of the feasibility study are incorporated into the presented techno-economic and life-cycle assessments. This work is intended to provide an understanding of the performance, cost, and impact of capturing CO2 at the commercial scale and the impact of climate and regional siting on the considered passive DAC system.

42 ENGINEERING↗

A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In-Column Heat Transfer (Final Report)

This report summarizes the work conducted on project DE-FE0031604 where University of Kentucky Center for Applied Energy (UK CAER) has validated its intensified CO 2 capture process through substantial enhancements to the kinetics of the absorption process and energy reductions by absorber temperature profile modification, dewatering and heat integration technologies for achieving significant capital and operating cost reductions. To address DOE’s objective of improving post-combustion CO 2 capture technology and reducing associated cost, UK CAER employed an intensified process which combined three key aspects targeted at overcoming inherent limitations or barriers in the conventional CO 2 capture and desorption process. The process designed to be independent of the type of solvent used, included (1) the use of 3-D printed two-channel structured packing material to control the temperature profile and increase the CO 2 absorption rate in the absorber, (2) a zeolite membrane dewatering unit for dewatering of the carbon-rich solvent to decouple solvent concentration needs for CO 2 absorption and desorption, and (3) a rich-split feed with two-phase flow heat transfer prior to the stripper that provided a secondary point of vapor generation to provide energy savings in steam extraction and solvent regeneration. The project was executed over two budget periods. This involved testing of individual process components which included the advanced heat transfer packing and the dewatering membrane on UK CAER’s 30 liter per minute (L/min) CO 2 (3” Column) capture bench unit with simulated flue gas in the first budget period. Subsequent scaled-up testing of these components together with the split-feed configuration were also tested in UK CAER’s 0.1 MWth CO 2 capture unit with coal-derived flue gas in the second-budget period. Long term studies were done during this period to assess process and solvent performance over extended duration. Project partners Lawrence Livermore National Laboratory (LLNL) and Media & Process Technology (MPT) led the development efforts for the advanced packing material and dewatering membrane respectively. Data from the long term testing was used as input for an environmental, health and safety (EH&S) assessment for the process and scaled technology performed by ALL4 LLC. Trimeric Corporation also completed a techno-economic analysis (TEA) for the UK CAER technology which was compared to the DOE reference Case B12B. Tests on the 3” column capture unit showed that the advanced heat transfer packing could be used to lower the bulge temperature in the absorber, and this was also proven in the scaled testing in the 0.1 MWth CO 2 capture unit. The bulge temperature could be lowered by >10 °C, changing the temperature profile in the absorber, and showed potential to enhance absorption with the ability to tailor the profile to provide conditions suitable for a solvent’s properties and kinetics. Conditions for short term evaluation of a 19” zeolite dewatering membrane on the 3” column capture unit yielded desirable fluxes and sustained rejection rates of >80%. However, for the scaled testing of six membrane modules consisting of 21 parts of 31-inch-long membrane tubes in each bundle (surface area 0.3 m 2 ), over a more extended duration, similar rejection rates could not be achieved. With the split-feed of the rich stream to the stripper, improved heat recovery minimized waste heat exiting the top of the stripper. The stripper exhaust temperatures could be reduced by >10 °C; reducing the amount of water vaporization contributed to lowering the regeneration energy by ~ 15%. The energy benefit could be sustained from the long term monitoring of the solvent performance. The solvent properties were not significantly impacted over the long-term operations. The benefits of the UK CAER process demonstrated experimentally were mostly validated from the TEA comparing a commercial scale application of the technology to DOE reference Case B12B. The cost of CO 2 capture for the UK CAER technology was estimated to be ~$34.97/tonne of CO 2 captured; a reduction of 23% compared to Case B12B. The increase in cost of electricity was also shown to be 16% lower than that of Case B12B. The total parasitic demand was also shown to be 11% lower. The key drivers for the benefits are a result of the process intensification approaches employed in the UK CAER technology for enhanced solvent performance, effective heat recovery and improved energy performance. The EH&S assessment did not find any major environmental concerns or barriers to the full scale implementation of the technology.

20 FOSSIL-FUELED POWER PLANTS↗