Voyager capsule, preliminary design, phase B. Volume IV - Entry science package. Section II - Preliminary design for OSE FINAL report
Operational support equipment preliminary design for entry science package portion of Voyager flight capsule system
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Operational support equipment preliminary design for entry science package portion of Voyager flight capsule system
The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility
The future of Space Exploration includes missions to the moon, asteroids, Mars, and beyond. To get there, the mission concept is to launch multiple launch vehicles months, even years apart. In order to achieve this, launch vehicles, payloads (satellites and crew capsules), and ground systems must be highly reliable and/or available, to include maintenance concepts and procedures in the event of a launch scrub. In order to achieve this high probability of mission success, Ground Systems Development and Operations (GSDO) has allocated Reliability, Maintainability, and Availability (RMA) requirements to all hardware and software required for both launch operations and, in the event of a launch scrub, required to support a repair of the ground systems, launch vehicle, or payload. This is done concurrently with the design process (30/60/90 reviews).
NASA has frequency and timing systems at many facilities and centers. Timing systems with specifications tighter than several microseconds are covered. These ground based systems support scientific experiments and spacecraft tracking for the following programs; NASA Satellite Laser Ranging (NSLR); Network Mission Operations Support (NMOS); Kennedy Space Center (KSC); Very Long Baseline Interferometry (VLBI); Tracking Data Relay Satellite System (TDRSS) Ground Terminal Network; and the Deep Space Network (DSN). Major equipment assemblies, specifications, performance, and requirements, both present and future, are presented.
Data link equipment for Saturn ground computer systems
A significant element of the Kennedy Space Center's ground support equipment for the Space Shuttle is the Launch Processing System, which provides a high level of automation for all operations, including the checkout of the Orbiter, Solid Rocket Boosters, and External Tank. Other direct support elements of the Ground Support Equipment accomplish environmental conditioning, provide and control power, gases, and fluids, and supply vehicle facility and personnel fire protection. Attention is given to the prelaunch functions of the Launch Control Center's Firing Rooms, which contain minicomputers, a data recording area, the Hardware Interface Modules, a Common Data Buffer, and Front End Processors.
Systems analysis applied to identification of Saturn V launch vehicle support system requirements and establishment of baseline logic for vehicle prelaunch processing simulation and systems optimization
Houston Manned Spacecraft Center display and control system for near-real-time assessment of Project Gemini data
This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.
Factors that influence the human nutritional requirements envisioned in a controlled ecological life support system ground-based demonstrator and on bioavailability experiments of Ca, Fe and Zn are discussed. The interrelationhip of protein and magnesium on Ca retention is also described.
Description of flight monitoring and ground control systems for project mercury
Electromagnetic compatibility of ACE-S/C, ACCEPTANCE Checkout Equipment-Spacecraft, checkout and display system for Apollo spacecraft
Computer controlled checkout equipment and data handling system for AOSO
Surveyor D spacecraft, Atlas Centaur launch vehicle, tracking and communication system, trajectory, and flight plan
Safety management areas of concern include the space shuttle main engine, shuttle avionics, orbiter thermal protection system, the external tank program, and the solid rocket booster program. The ground test program and ground support equipment system were reviewed. Systems integration and technical 'conscience' were of major priorities for the investigating teams.
Ground support real time operating system 360 for manned spaceflight, discussing system features and performance
Manned spacecraft design concepts covering elements in space vehicle system, interrelation of systems and design management