Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Sustainable hydrogen manufacturing via renewable-integrated intensified process for refueling stations

The widescale consumer adoption of hydrogen fuel cell electric vehicles (HFCEVs) is currently hindered by the high cost of small-scale hydrogen generation and the lack of extensive hydrogen refueling infrastructure. Natural gas-based hydrogen is cheaper when produced in large volumes but is also associated with high CO 2 emissions. To counter these challenges, we propose a hybrid approach where both natural gas and renewables are integrated in a synergistic manner using a dynamic process intensification technology that can be deployed on-site for meeting local demands of refueling stations. The technology is based on sorption enhanced steam methane reforming (SE-SMR) that utilizes a combination of reaction with in-situ CO 2 adsorption for enhancing process modularity, productivity and efficiency thereby outperforming conventional SMR at small scale. We develop a mixed integer linear programming (MILP)-based optimization framework for simultaneous design and scheduling of the SE-SMR process. The simultaneous optimization provides a synergistic combination whereby the renewables allow sustainable hydrogen manufacturing and the dynamic SE-SMR allows optimal use of the intermittency of the renewables. The U.S. nationwide analysis indicates that for futuristic renewable prices and a hydrogen production capacity of 2 ton/day, hydrogen can be produced at 50% less cost compared to the current cost of small-scale hydrogen generation. Finally, the city-wise analysis with varying hydrogen demand shows that even with just 5% HFCEV market penetration level, hydrogen production cost less than $3/kg can be obtained at small scales across the United States with even cheaper hydrogen for large cities.

08 HYDROGEN↗

Valuation and cost reduction of behind-the-meter hydrogen production in Hawaii

A 250kW hydrogen electrolysis facility was recently installed at the Natural Energy Laboratory of Hawaii Authority's (NELHA's) campus. This facility that will begin operation in 2020 to produce hydrogen for fuel cell buses on the island to demonstrate of the application of hydrogen to decarbonize transportation. Given the size of the electrolysis station, it has the potential to significantly increase electricity costs for the campus, which is subject to energy and peak demand charges from the local utility. In this paper, we analyze the cost of hydrogen production at NELHA given the rate structure options available from the utility. Production costs are estimated using optimal versus constant scheduling of the facility to meet the buses’ demand. A model of the electrolysis station is used to capture changes in production efficiency over the power range in the optimization routine. The effects of combining the station and campus load versus standalone operation and increasing solar generation are also explored. The analyses surrounding this scenario show the importance of multiple factors on the potential profitability of hydrogen production in behind-the-meter applications and show trends that could have implications for other similar installations.

08 HYDROGEN↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Tri-Level Scheduling Model Considering Residential Demand Flexibility of Aggregated HVACs and EVs Under Distribution LMP

Residential loads, especially heating, ventilation and air conditioners (HVACs) and electric vehicles (EVs), have great potentials to provide demand flexibility which is an attribute of grid-interactive efficient buildings (GEB). Under this new paradigm, first, EV and HVAC aggregator models are developed in this paper to represent the fleet of GEBs, in which the aggregated parameters are obtained based on a new approach of data generation and least squares parameter estimation (DG-LSPE), which can deal with heterogeneous HVACs. Then, a tri-level bidding and dispatching framework is established based on competitive distribution operation with distribution locational marginal price (DLMP). Furthermore, the first two levels form a bilevel model to optimize the aggregators’ payment and to represent the interdependency between load aggregators and the distribution system operator (DSO) using DLMP, and the third level is to dispatch the optimal load aggregation to all residents by the proposed priority list-based demand dispatching algorithm. Finally, case studies on a modified IEEE 33-Bus system illustrate three main technical reasons of payment reduction due to demand flexibility: load shift, DLMP step changes, and power losses. They can be used as general guidelines for better decision-making for future planning and operation of demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced deep neural networks with transfer learning for distribution LMP considering load and PV uncertainties

As the flexibility of generation and demand increases in distribution systems, the residential loads are emerging as a promising means to participate in demand response and the transactive energy market. Market pricing is an instrumental mechanism for the distribution system operator to exploit the full potential of the flexible resources. The distribution locational marginal price (DLMP) can be used to guide the residential load consumption. This type of market signal helps the distribution system operator to optimize the scheduling of all resources while satisfying related network constraints through a day-ahead market. However, solving the optimization problem for large-scale systems can be computationally expensive. To address the scalability and practicability limitations of the DLMP framework, a learning-based approach is proposed in this paper to complement the day-ahead distribution market framework. Here, the proposed approach combines long short-term memory and transfer learning to develop deep neural network that can capture the spatial–temporal correlation of the input data. The model can determine the optimal DLMP for each node in a distribution system without the system parameters required to formulate the optimization problem. Testing results on IEEE 33-bus and 123-bus systems show that the proposed approach can generate a comparable DLMP against the optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Perspectives on Potential Advanced Construction Technologies for Nuclear Energy

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, the National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pricing Strategy of Electric Vehicle Aggregators Based on Locational Marginal Price to Minimize Photovoltaic (PV) Curtailment

The global climate crisis demands urgent action to mitigate global warming. Using renewable energy sources, such as solar and wind power, for electricity generation is crucial. This shift from centralized to distributed power systems, however, brings challenges, including voltage fluctuations and renewable energy curtailment. The rapid growth of the electric vehicle (EV) industry adds complexity, increasing overall electricity demand and straining the power supply during peak charging times. This paper proposes a scheduling strategy for EV aggregators to reduce renewable energy curtailment and stabilize grid operation by strategically scheduling EV charging. Using Multi -Agent Transport Simulation (MATSim), a traffic simulation tool, EV driving data in Denver, Colorado, USA, were modeled. The EV aggregator adjusts charging fees based on locational marginal prices, encouraging EVs to charge at different stations according to pricing. Simulations on an IEEE 33-bus system with distributed energy resources and EV charging stations validate the proposed algorithm, demonstrating its effectiveness in reducing curtailment by 12.55% and stabilizing grid operation.

33 ADVANCED PROPULSION SYSTEMS↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Unlocking Autonomous Telescopes through Reinforcement Learning: An Offline Framework and Insights from a Case Study

Optimizing observational astronomy campaigns is becoming a complex and expensive task for next-generation telescopes, where manual planning of observations may tend to reach suboptimal results in terms of optimization.Reinforcement Learning (RL) has been well-demonstrated as a valuable approach for training autonomous systems, and it may provide the basis for self-driving telescopes capable of scanning the sky and optimizing the scheduling for astronomy campaigns.We have developed a framework for the optimization of telescope scheduling using RL techniques, based on a dataset containing data on a discrete set of sky locations that the telescope should visit, and a reward metric. We compared several RL algorithms applied to an offline simulation dataset based at the Stone Edge Observatory, considering a discrete set of sky locations to visit and using “t-effective” as a reward metric, a measure of the quality of the data.Deep Q-Networks (DQNs), belonging to the class of value-based methods, have shown remarkable success in the optimization of astronomical observations in our dataset. In the full environment, the average reward value in each state was found to be 92%±5% of the maximum possible reward, while on the test set it resulted in 87%±9% of the maximum possible reward.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Technical Language Processing of Nuclear Power Plants Equipment Reliability Data

Operating nuclear power plants (NPPs) generate and collect large amounts of equipment reliability (ER) element data that contain information about the status of components, assets, and systems. Some of this information is in textual form where the occurrence of abnormal events or maintenance activities are described. Analyses of NPP textual data via natural language processing (NLP) methods have expanded in the last decade, and only recently the true potential of such analyses has emerged. So far, applications of NLP methods have been mostly limited to classification and prediction in order to identify the nature of the given textual element (e.g., safety or non-safety relevant). In this paper, we target a more complex problem: the automatic generation of knowledge based on a textual element in order to assist system engineers in assessing an asset’s historical health performance. The goal is to assist system engineers in the identification of anomalous behaviors, cause–effect relations between events, and their potential consequences, and to support decision-making such as the planning and scheduling of maintenance activities. “Knowledge extraction” is a very broad concept whose definition may vary depending on the application context. In our particular context, it refers to the process of examining an ER textual element to identify the systems or assets it mentions and the type of event it describes (e.g., component failure or maintenance activity). In addition, we wish to identify details such as measured quantities and temporal or cause–effect relations between events. This paper describes how ER textual data elements are first preprocessed to handle typos, acronyms, and abbreviations, then machine learning (ML) and rule-based algorithms are employed to identify physical entities (e.g., systems, assets, and components) and specific phenomena (e.g., failure or degradation). A few applications relevant from an NPP ER point of view are presented as well.

97 MATHEMATICS AND COMPUTING↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

Advanced Anti-Fouling Coatings to Improve the Efficiency of Coal Power Plants

As the total cost of carbon to generate energy has become a global concern, operators are increasingly looking at all parts of the generation cycle to find areas where efficiency gains may be found. It has been long identified that fouling of heat exchangers is a persistent cause of up to 2.5% of global CO 2 emissions. Unfortunately, practice has also demonstrated that unless a powerful economic driver exists to encourage preemptive mitigation of fouling, there will always be a strong tendency for operators to minimize any form of intervention due to high costs and challenges in scheduling downtime. The objective of this proposed research effort was to demonstrate how existing power plants could lower their carbon emissions and significantly improve heat transfer efficiency using new surface treatment materials to control fouling in a variety of heat exchange equipment. The surface treatment material which was optimized and deployed in this effort is now known commercially as HeatX. It is a low-surface energy, water- and oil-repellent, abrasion resistant material which can be applied in-situ to a wide variety of previously worn/used/in-service substrates. Once applied, it provides a barrier against corrosion, scale deposit formation, and biofilm adhesion on the circulating water-containing tube-side. Alternatively, if applied to the tube exterior, the non-wetting nature of the surface was demonstrated to promote dropwise condensation, subsequently lowering condenser backpressure and increasing overall plant efficiency. As part of this cooperative effort, the Department of Energy’s support was crucial to de-risk and demonstrate the concept of HeatX, while validating both the performance and economic benefit in multiple pilot field studies. The HeatX material properties were optimized in this effort for full field applicability to heat exchangers and condensers, and Oceanit developed the necessary procedures and protocols to provide enough material to support extended length, multi-year demonstrations in the power generation, desalination, and refining industries, making this technology broadly applicable and ready for commercial transition. Field deployment case studies at thermal power plants have shown that the HeatX treatment can provide economic savings of up to $15,000 per day for an operator based on avoiding maintenance costs and lowering fuel usage. The complete mitigation of fouling effects can increase the efficiency of equipment by up to 7%, in a field where gains of 0.5% are generally seen as operationally significant. The HeatX treatment has also demonstrated exceptional lifetime and compatibility with a wide variety of seawater and hydrocarbon environments, further increasing both the return on investment and the effective emission reduction. Such efficiency improvements correlate to massive carbon savings. For every 1 GW of capacity, operators can see carbon emissions reductions of 300,000 tons of CO 2 per year. When looking at the bigger picture, improved condenser function across the U.S. has the potential to prevent 221.3 million tons of CO 2 emissions, equivalent to the sequestration capacity of 129 million acres of forest. If applied on a global scale, 1.26 billion metric tons of CO 2 could be averted from the atmosphere, the same amount of carbon sequestrated by 1.5 billion acres of forest annually or 262,000 wind turbines operating annually. As businesses across multiple industries take a more active role in focusing on environmental, social, and governance (ESG) solutions as part of their core business operations, HeatX will be an attractive technology for commercial investment.

01 COAL, LIGNITE, AND PEAT↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Deep reinforcement learning to discover multi-fuel injection strategies for compression ignition engines

Over the past several decades, regulation of compression ignition engine emissions has become increasingly stringent as concern about the environmental and health implications of these emissions has grown. These changing constraints have led to a series of new, alternative fuel injection strategies that aim to maintain power output while reducing in-cylinder generated emissions by operating in the low-temperature combustion (LTC) regime. These advanced injection strategies are created and retuned for individual combinations of engine geometry, fuel, and emissions constraints. Deep reinforcement learning has been shown to be an effective alternative to traditional optimization approaches for highly combinatorial control problems, such as discovering the optimal injection schedules for compression ignition engines. In this study, we deploy a previously presented deep reinforcement learning framework to iteratively optimize a series of engine geometries over a range of increasingly strict NO x emissions regulations. We then examine the resulting injection schedules. We discuss the potential for using this deep reinforcement learning framework for fuel selection screening and for discovering unique injection strategies for different engine geometries and future emissions standards.

33 ADVANCED PROPULSION SYSTEMS↗

Market Barriers and Drivers for the Next Generation Fault Detection and Diagnostic Tools

Commercial buildings in the U.S. consume as much as 30% excess energy compared to buildings that operate fault free and efficiently. Fault detection and diagnostic (FDD) platforms help to continually identify operational inefficiencies and maintain low-carbon performance. However, the recommendations generated by FDD tools need to be implemented by technicians, resulting in delays or lost savings opportunities. Recent research advances showed fault AUTOcorrection integrating with commercial FDD offerings filled this gap. Seven innovative AUTOcorrection algorithms were integrated into two FDD platforms and deployed across four buildings. The enhanced tools successfully correct faults focusing on incorrectly programmed schedules, override not released, control hunting, rogue zone, and suboptimal setpoints. Although its technical efficacy has been proven in the field, fault AUTO-correction is still early in the deployment cycle and opportunities and barriers need to be understood to reach its full potential in market transformation. This paper broadly introduces the new technology that automatically corrects HVAC faults. The authors describe in detail technology potential, market barriers, and enablers for scalability based on field testing results and interviews with the FDD providers and facility managers. The interviewees agreed that AUTO-correction can reduce the extent to which savings are dependent upon human intervention, scale building operators’ ability to act on FDD findings (especially for facilities with small operation teams), and achieve significant savings. To enable scalable deployment, future efforts are needed to overcome the barriers such as cybersecurity and accountability concerns from building operators and standardization of control parameters used in building automation systems.

Pritoni, Marco↗