Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Expendable launch vehicles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

FASTSAT-HSV01 Synergistic Observations of the Magnetospheric Response During Active Periods: MINI-ME, PISA and TTI

Understanding the complex processes within the inner magnetosphere of Earth particularly during storm periods requires coordinated observations of the particle and field environment using both in-situ and remote sensing techniques. In fact in order to gain a better understanding of our Heliophysics and potentially improve our space weather forecasting capabilities, new observation mission approaches and new instrument technologies which can provide both cost effective and robust regular observations of magnetospheric activity and other space weather related phenomenon are necessary. As part of the effort to demonstrate new instrument techniques and achieve necessary coordinated observation missions, NASA's Fast Affordable Science and Technology Satellite Huntsville 01 mission (FASTSAT-HSVOI) scheduled for launch in 2010 will afford a highly synergistic solution which satisfies payload mission opportunities and launch requirements as well as contributing iri the near term to our improved understanding of Heliophysics. NASA's FASTSAT-HSV01 spacecraft on the DoD Space Test Program-S26 (STP-S26) Mission is a multi-payload mission executed by the DoD Space Test Program (STP) at the Space Development and Test Wing (SDTW), Kirtland AFB, NM. and is an example of a responsive and economical breakthrough in providing new possibilities for small space technology-driven and research missions. FASTSAT-HSV is a unique spacecraft platform that can carry multiple small instruments or experiments to low-Earth orbit on a wide range of expendable launch vehicles for a fraction of the cost traditionally required for such missions. The FASTSAT-HSV01 mission allows NASA to mature and transition a technical capability to industry while increasing low-cost access to space for small science and technology (ST) payloads. The FASTSAT-HSV01 payload includes three NASA Goddard Space Flight Center (GSFC) new technology built instruments that will study the terrestrial space environment and potentially contribute to space weather research in a synergistic manner. MINI-ME, a neutral atom imager, will observe the neutral atom inputs to ionospheric heating which can be important during high levels of magnetospheric activity. PISA, a plasma impedance spectrometer, will measure simultaneously the local electron densities and temperatures as well as measure small scale density structure (500 m spatial scale) during these active periods. TTI, a thermospheric imager, will remotely determine the thermospheric temperature response to this magnetospheric activity. Together, these observations will contribute significantly to a comprehensive understanding of the flow of energy through and the response of the storm-time terrestrial magnetosphere.

Casas, Joseph C.↗

Analysis of Space Shuttle Ground Support System Fault Detection, Isolation, and Recovery Processes and Resources

As part of the FDIR (Fault Detection, Isolation, and Recovery) Project for the Constellation Program, a task was designed within the context of the Constellation Program FDIR project called the Legacy Benchmarking Task to document as accurately as possible the FDIR processes and resources that were used by the Space Shuttle ground support equipment (GSE) during the Shuttle flight program. These results served as a comparison with results obtained from the new FDIR capability. The task team assessed Shuttle and EELV (Evolved Expendable Launch Vehicle) historical data for GSE-related launch delays to identify expected benefits and impact. This analysis included a study of complex fault isolation situations that required a lengthy troubleshooting process. Specifically, four elements of that system were considered: LH2 (liquid hydrogen), LO2 (liquid oxygen), hydraulic test, and ground special power.

Gross, Anthony R.↗

ATLAST-9.2m: a Large-Aperture Deployable Space Telescope

We present results of a study of a deployable version of the Advanced Technology Large-Aperture Space Telescope (ATLAST), designed to operate in a Sun-Earth L2 orbit. The primary mirror of the segmented 9.2-meter aperture has 36 hexagonal 1.315 m (flat to flat) glass mirrors. The architecture and folding of the telescope is similar to JWST, allowing it to fit into the 6.5 m fairing of a modest upgrade to the Delta-IV Heavy version of the Evolved Expendable Launch Vehicle (EELV). We discuss the overall observatory design, optical design, instruments, stray light, wavefront sensing and control, pointing and thermal control, and in-space servicing options.

Oergerle, William↗

Understanding Mechanical Design with Respect to Manufacturability

At the NASA Prototype Development Laboratory in Kennedy Space Center, Fl, several projects concerning different areas of mechanical design were undertaken in order to better understand the relationship between mechanical design and manufacturabiIity. The assigned projects pertained specifically to the NASA Space Shuttle, Constellation, and Expendable Launch Vehicle programs. During the work term, mechanical design practices relating to manufacturing processes were learned and utilized in order to obtain an understanding of mechanical design with respect to manufacturability.

Mondell, Skyler↗

ELaNa - Educational Launch of Nanosatellite Enhance Education Through Space Flight

One of NASA's missions is to attract and retain students in the science, technology, engineering and mathematics (STEM) disciplines. Creating missions or programs to achieve this important goal helps strengthen NASA and the nation's future work force as well as engage and inspire Americans and the rest of the world. During the last three years, in an attempt to revitalize educational space flight, NASA generated a new and exciting initiative. This initiative, NASA's Educational Launch of Nanosatellite (ELaNa), is now fully operational and producing exciting results. Nanosatellites are small secondary satellite payloads called CubeSats. One of the challenges that the CubeSat community faced over the past few years was the lack of rides into space. Students were building CubeSats but they just sat on the shelf until an opportunity arose. In some cases, these opportunities never developed and so the CubeSat never made it to orbit. The ELaNa initiative is changing this by providing sustainable launch opportunities for educational CubeSats. Across America, these CubeSats are currently being built by students in high school all the way through graduate school. Now students know that if they build their CubeSat, submit their proposal and are selected for an ELaNa mission, they will have the opportunity to fly their satellite. ELaNa missions are the first educational cargo to be carried on expendable launch vehicles (ELY) for NASA's Launch Services Program (LSP). The first ELaNa CubeSats were slated to begin their journey to orbit in February 2011 with NASA's Glory mission. Due to an anomaly with the launch vehicle, ELaNa II and Glory failed to reach orbit. This first ELaNa mission was comprised of three IU CubeSats built by students at Montana State University (Explorer Prime Flight 1), the University of Colorado (HERMES), and Kentucky Space, a consortium of state universities (KySat). The interface between the launch vehicle and the CubeSat, the Poly-Picosatellite Orbital Deployer (P-POD), was developed and built by students at California Polytechnic State University (Cal Poly). Integrating a P-POD on a NASA ELV was not an easy task. The creation of new processes and requirements as well as numerous reviews and approvals were necessary within NASA before the first ELaNa mission could be attached to a NASA launch vehicle (LV). One of the key objectives placed on an ELaNa mission is that the CubeSat and PPOD does not increase the baseline risk to the primary mission and launch vehicle. The ELaNa missions achieve this objective by placing a rigorous management and engineering process on both the LV and CubeSat teams. So, what is the future of ELaNa? Currently there are 16 P-POD missions manifested across four launch vehicles to support educational CubeSats selected under the NASA CubeSat Initiative. From this initiative, a rigorous selection process produced 22-student CubeSat missions that are scheduled to fly before the end of 2012. For the initiative to continue, organizations need to submit proposals to the annual CubeSat initiative call so they have the opportunity to be manifested and launched.

Skrobot, Garrett Lee↗

Peak Wind Forecasts for the Launch-Critical Wind Towers on Kennedy Space Center/Cape Canaveral Air Force Station, Phase IV

This final report describes the development of a peak wind forecast tool to assist forecasters in determining the probability of violating launch commit criteria (LCC) at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The peak winds arc an important forecast clement for both the Space Shuttle and Expendable Launch Vehicle (ELV) programs. The LCC define specific peak wind thresholds for each launch operation that cannot be exceeded in order to ensure the safety of the vehicle. The 45th Weather Squadron (45 WS) has found that peak winds are a challenging parameter to forecast, particularly in the cool season months of October through April. Based on the importance of forecasting peak winds, the 45 WS tasked the Applied Meteorology Unit (AMU) to update the statistics in the current peak-wind forecast tool to assist in forecasting LCC violations. The tool includes onshore and offshore flow climatologies of the 5-minute mean and peak winds and probability distributions of the peak winds as a function of the 5-minute mean wind speeds.

Crawford, Winifred↗

CFD Validation with LDV Test Data for Payload/Fairing Internal Flow

Flowfield testing of a 1/5th scale model of a payload/fairing configuration, typical of an expendable launch vehicle, has been performed. Two-dimensional (planar) velocity measurements were carried out in four planes with the aid of Laser Doppler Velocimetry (LDV). Computational Fluid Dynamics (CFD) analysis results for the scale model flowfleld are compared with the test data. The CFD results are in general agreement with the test data. The ability of the CFD methodology in identifying the global flow features (including critical points such as vortex, saddle point, etc.) has been demonstrated. Practical problems and difficulties associated with the LDV method applied to the complex geometry under consideration have been summarized.

Kandula, max↗

Building a Metric

Launch Services Program is a Kennedy Space Center based program whose job it is to undertake all the necessary roles required to successfully launch Expendable Launch Vehicles. This project was designed to help Launch Services Program accurately report how successful they have been at launching missions on time or +/- 2 days from the scheduled launch date and also if they weren't successful, why. This information will be displayed in the form of a metric, which answers these questions in a clear and accurate way.

Spencer, Shakira↗

Autonomous Flight Safety System

Autonomous Flight Safety System (AFSS) is an independent flight safety system designed for small to medium sized expendable launch vehicles launching from or needing range safety protection while overlying relatively remote locations. AFSS replaces the need for a man-in-the-loop to make decisions for flight termination. AFSS could also serve as the prototype for an autonomous manned flight crew escape advisory system. AFSS utilizes onboard sensors and processors to emulate the human decision-making process using rule-based software logic and can dramatically reduce safety response time during critical launch phases. The Range Safety flight path nominal trajectory, its deviation allowances, limit zones and other flight safety rules are stored in the onboard computers. Position, velocity and attitude data obtained from onboard global positioning system (GPS) and inertial navigation system (INS) sensors are compared with these rules to determine the appropriate action to ensure that people and property are not jeopardized. The final system will be fully redundant and independent with multiple processors, sensors, and dead man switches to prevent inadvertent flight termination. AFSS is currently in Phase III which includes updated algorithms, integrated GPS/INS sensors, large scale simulation testing and initial aircraft flight testing.

Ferrell, Bob↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depot servicing platforms to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicle (ELV) systems such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support a new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid and Mars Missions. New vehicle design concepts are presented that can be launched on current 5 meter diameter ELV systems. These new reusable vehicle concepts include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot, L1 Depot and missions beyond L1; a new reusable lunar lander for crew transportation between the L1 Depot and the lunar surface; and Mars orbital Depot are based on International Space Station (ISS) heritage hardware. Data provided includes the number of launches required for each mission utilizing current ELV systems (Delta IV Heavy or equivalent) and the approximate vehicle masses and propellant requirements. Also included is a discussion on affordability with ideas on technologies that could reduce the number of launches required and thoughts on how this infrastructure include competitive bidding for ELV flights and propellant services, developments of new reusable in-space vehicles and development of a multiuse infrastructure that can support many government and commercial missions simultaneously.

Smitherman, David↗

NASA Tech Briefs, November 2012

The topics include: Visual System for Browsing, Analysis, and Retrieval of Data (ViSBARD); Time-Domain Terahertz Computed Axial Tomography NDE System; Adaptive Sampling of Time Series During Remote Exploration; A Tracking Sun Photometer Without Moving Parts; Surface Temperature Data Analysis; Modular, Autonomous Command and Data Handling Software with Built-In Simulation and Test; In-Situ Wire Damage Detection System; Amplifier Module for 260-GHz Band Using Quartz Waveguide Transitions; Wideband Agile Digital Microwave Radiometer; Buckyball Nucleation of HiPco Tubes; FACT, Mega-ROSA, SOLAROSA; An Integrated, Layered-Spinel Composite Cathode for Energy Storage Applications; Engineered Multifunctional Surfaces for Fluid Handling; Polyolefin-Based Aerogels; Adjusting Permittivity by Blending Varying Ratios of SWNTs; Gravity-Assist Mechanical Simulator for Outreach; Concept for Hydrogen-Impregnated Nanofiber/Photovoltaic Cargo Stowage System; DROP: Durable Reconnaissance and Observation Platform; Developing Physiologic Models for Emergency Medical Procedures Under Microgravity; Spectroscopic Chemical Analysis Methods and Apparatus; Low Average Sidelobe Slot Array Antennas for Radiometer Applications; Motion-Corrected 3D Sonic Anemometer for Tethersondes and Other Moving Platforms; Water Treatment Systems for Long Spaceflights; Microchip Non-Aqueous Capillary Electrophoresis (MicronNACE) Method to Analyze Long-Chain Primary Amines; Low-Cost Phased Array Antenna for Sounding Rockets, Missiles, and Expendable Launch Vehicles; Mars Science Laboratory Engineering Cameras; Seismic Imager Space Telescope; Estimating Sea Surface Salinity and Wind Using Combined Passive and Active L-Band Microwave Observations; A Posteriori Study of a DNS Database Describing Super critical Binary-Species Mixing; Scalable SCPPM Decoder; QuakeSim 2.0; HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler; MPST Software: MoonKommand

Source record↗

Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS) - Cyclops

Access to space for satellites in the 50-100 kg class is a challenge for the small satellite community. Rideshare opportunities are limited and costly, and the small sat must adhere to the primary payloads schedule and launch needs. Launching as an auxiliary payload on an Expendable Launch Vehicle presents many technical, environmental, and logistical challenges to the small satellite community. To assist the community in mitigating these challenges and in order to provide the community with greater access to space for 50-100 kg satellites, the NASA International Space Station (ISS) and Engineering communities in collaboration with the Department of Defense (DOD) Space Test Program (STP) is developing a dedicated 50-100 kg class ISS small satellite deployment system. The system, known as Cyclops, will utilize NASA's ISS resupply vehicles to launch small sats to the ISS in a controlled pressurized environment in soft stow bags. The satellites will then be processed through the ISS pressurized environment by the astronaut crew allowing satellite system diagnostics prior to orbit insertion. Orbit insertion is achieved through use of the Japan Aerospace Exploration Agency's Experiment Module Robotic Airlock (JEM Airlock) and one of the ISS Robotic Arms. Cyclops' initial satellite deployment demonstration of DOD STP's SpinSat and UT/TAMU's Lonestar satellites will be toward the end of 2013 or beginning of 2014. Cyclops will be housed on-board the ISS and used throughout its lifetime. The anatomy of Cyclops, its concept of operations for satellite deployment, and its satellite interfaces and requirements will be addressed further in this paper.

Smith, James P.↗

A Peak Wind Probability Forecast Tool for Kennedy Space Center and Cape Canaveral Air Force Station

This conference abstract describes the development of a peak wind forecast tool to assist forecasters in determining the probability of violating launch commit criteria (LCC) at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) in east-central Florida. The peak winds are an important forecast element for both the Space Shuttle and Expendable Launch Vehicle (ELV) programs. The LCC define specific peak wind thresholds for each launch operation that cannot be exceeded in order to ensure the safety of the vehicle. The 45th Weather Squadron (45 WS) has found that peak winds are a challenging parameter to forecast, particularly in the cool season months of October through April. Based on the importance of forecasting peak winds, the 45 WS tasked the Applied Meteorology Unit (AMU) to develop a short-range peak-wind forecast tool to assist in forecasting LCC violatioas.The tool will include climatologies of the 5-minute mean end peak winds by month, hour, and direction, and probability distributions of the peak winds as a function of the 5-minute mean wind speeds.

Crawford, Winifred↗

Global Positioning System (GPS) Precipitable Water in Forecasting Lightning at Spaceport Canaveral

Using meteorology data, focusing on precipitable water (PW), obtained during the 2000-2003 thunderstorm seasons in Central Florida, this paper will, one, assess the skill and accuracy measurements of the current Mazany forecasting tool and, two, provide additional forecasting tools that can be used in predicting lightning. Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) are located in east Central Florida. KSC and CCAFS process and launch manned (NASA Space Shuttle) and unmanned (NASA and Air Force Expendable Launch Vehicles) space vehicles. One of the biggest cost impacts is unplanned launch scrubs due to inclement weather conditions such as thunderstorms. Each launch delay/scrub costs over a quarter million dollars, and the need to land the Shuttle at another landing site and return to KSC costs approximately $ 1M. Given the amount of time lost and costs incurred, the ability to accurately forecast (predict) when lightning will occur can result in significant cost and time savings. All lightning prediction models were developed using binary logistic regression. Lightning is the dependent variable and is binary. The independent variables are the Precipitable Water (PW) value for a given time of the day, the change in PW up to 12 hours, the electric field mill value, and the K-index value. In comparing the Mazany model results for the 1999 period B against actual observations for the 2000-2003 thunderstorm seasons, differences were found in the False Alarm Rate (FAR), Probability of Detection (POD) and Hit Rate (H). On average, the False Alarm Rate (FAR) increased by 58%, the Probability of Detection (POD) decreased by 31% and the Hit Rate decreased by 20%. In comparing the performance of the 6 hour forecast period to the performance of the 1.5 hour forecast period for the Mazany model, the FAR was lower by 15% and the Hit Rate was higher by 7%. However, the POD for the 6 hour forecast period was lower by 16% as compared to the POD of the 1.5 hour forecast period. Neither forecast period performed at the accuracy measures expected. A 2-Hr Forecasting Tool was developed to support a Phase I Lightning Advisory, which requires a 30-minute lead time for predicting lightning.

Kehrer, Kristen↗

An Application of Overset Grids to Payload/Fairing Three-Dimensional Internal Flow CFD Analysis

The application of overset grids to the computational fluid dynamics analysis of three-dimensional internal flow in the payload/fairing of an expendable launch vehicle is described. In conjunction with the overset grid system, the flowfield in the payload/fairing configuration is obtained with the aid of OVERFLOW Navier-Stokes code. The solution exhibits a highly three dimensional complex flowfield with swirl, separation, and vortices. Some of the computed flow features are compared with the measured Laser-Doppler Velocimetry (LDV) data on a 1/5th scale model of the payload/fairing configuration. The counter-rotating vortex structures and the location of the saddle point predicted by the CFD analysis are in general agreement with the LDV data. Comparisons of the computed (CFD) velocity profiles on horizontal and vertical lines in the LDV measurement plane in the faring nose region show reasonable agreement with the LDV data.

Kandula, Max↗

2006 NASA Range Safety Annual Report

Throughout 2006, Range Safety was involved in a number of exciting and challenging activities and events, from developing, implementing, and supporting Range Safety policies and procedures-such as the Space Shuttle Launch and Landing Plans, the Range Safety Variance Process, and the Expendable Launch Vehicle Safety Program procedures-to evaluating new technologies. Range Safety training development is almost complete with the last course scheduled to go on line in mid-2007. Range Safety representatives took part in a number of panels and councils, including the newly formed Launch Constellation Range Safety Panel, the Range Commanders Council and its subgroups, the Space Shuttle Range Safety Panel, and the unmanned aircraft systems working group. Space based range safety demonstration and certification (formerly STARS) and the autonomous flight safety system were successfully tested. The enhanced flight termination system will be tested in early 2007 and the joint advanced range safety system mission analysis software tool is nearing operational status. New technologies being evaluated included a processor for real-time compensation in long range imaging, automated range surveillance using radio interferometry, and a space based range command and telemetry processor. Next year holds great promise as we continue ensuring safety while pursuing our quest beyond the Moon to Mars.

TenHaken, Ron↗

Educational Experiences of Embry-Riddle Students through NASA Research Collaboration

NASA's educational. programs benefit students and faculty while increasing the overall productivity of the organization. The NASA Graduate Student Research Program (GSRP) awards fellowships for graduate study leading to both masters and doctoral degrees in several technical fields. GSRP participants have the option to utilize NASA Centers andlor university research facilities. In addition, GSRP students can serve as mentors for undergrad students to provide a truly unique learning experience. NASA's Cooperative Education Program allows undergraduate students the chance to gain "real-world" work experience in the field. It also gives NASA a no risk capability to evaluate the true performance of a prospective new hire without relying solely on a "paper resume" while providing the students with a greater hiring potential upon graduation, at NASA or elsewhere. University faculty can also benefit by participating in the NASA Faculty Fellowship Program (NFFP). This program gives the faculty an opportunity to work with NASA peers. The Mission Analysis Branch of the Expendable Launch Vehicles Division at NASA Kennedy Space Center has utilized these two programs with students from Embry-Riddle Aeronautical University (ERAU) to conduct research in modeling and developing a parameter estimation method for spacecraft fuel slosh using simple pendulum analogs. Simple pendulum models are used to understand complicated spacecraft fuel slosh behavior. A robust parameter estimation process will help to identif' the parameters that will predict the response fairly accurately during the initial stages of design. These programs provide students with a unique opportunity to work on "real-world" aerospace problems, like spacecraft fuel slosh,. This in turn reinforces their problem solving abilities and their communication skills such as interviewing, resume writing, technical writing, and presentation. Faculty benefits by applying what they have learned to the classroom. Through university collaborations with NASA and industry help students to acquire skills that are vital for their success upon entering the workforce.

Schlee, Keith↗

Developing a Peak Wind Probability Forecast Tool for Kennedy Space Center and Cape Canaveral Air Force Station

This conference presentation describes the development of a peak wind forecast tool to assist forecasters in determining the probability of violating launch commit criteria (LCC) at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) in east-central Florida. The peak winds are an important forecast element for both the Space Shuttle and Expendable Launch Vehicle (ELV) programs. The LCC define specific peak wind thresholds for each launch operation that cannot be exceeded in order to ensure the safety of the vehicle. The 45th Weather Squadron (45 WS) has found that peak winds are a challenging parameter to forecast, particularly in the cool season months of October through April. Based on the importance of forecasting peak winds, the 45 WS tasked the Applied Meteorology Unit (AMU) to develop a short-range peak-wind forecast tool to assist in forecasting LCC violations. The tool will include climatologies of the 5-minute mean and peak winds by month, hour, and direction, and probability distributions of the peak winds as a function of the 5-minute mean wind speeds.

Lambert, WInifred↗