Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Development and Testing of a First-of-a-Kind Process to Support Commissioning a New Hazard Category 2 Nuclear Facility - 16573

The Department of Energy's Department of Environmental Management faces the complex task of cleaning up waste from nuclear weapons production. Often, the clean-up requires novel and untested technologies and approaches. In these cases, it is always necessary to provide some measure of assurance that the design engineers will be able to produce a design that will function in the means intended. Too many times we have seen first of a kind nuclear processing technologies put forth as commercially ready, only to be found insufficiently mature once attempted to be readied for operation. As now required by the DOE's Technology Readiness Assessment Process, it is necessary to demonstrate technologies in a similar environment to the current application and tested with a range of bounding simulants, or actual waste materials, if possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technology Development for Dry Storage of Aluminum-Clad Spent Nuclear Fuel - 20490

A candidate disposition pathway for the > 13 MTHM of aluminum-clad spent nuclear fuel (ASNF), owned and managed by the U.S. Department of Energy, is the drying and placement of the SNF into sealed-canister dry storage, with the ASNF-in- canisters 'road-ready' for transportation to and final direct disposal in a repository waste package. Technical information gaps in fuel drying, and fuel dry storage behavior, have previously challenged the declaration of technology readiness for drying and placement of this fuel into the DOE Standard Canister design for > 50 years of safe dry storage. The principal technical information gaps included: i) characterization and thermal dehydration behavior of aluminum (oxy)hydroxide films attendant on the cladding due to film formation during reactor operation and during post-discharge up to long-term wet storage histories; and ii) G-value data to enable estimation of the radiolytic gas generation from the cladding with its (oxy)hydroxide films. Thus, the oxide films on the ASNF challenged the safety of a sealed storage canister with thermal and radiolytic decomposition of the waters on the films that can lead to corrosion, pressurization, and flammability issues. These gaps in the technical information base have largely been closed. This paper discusses the investigations at the Idaho National Laboratory (INL) and the Savannah River National laboratory (SRNL), and outlines the pending technology development work for input to an engineering design to enable a road-ready dry storage system for ASNF. The ASNF inventory considered for road-ready dry storage is stored at the Savannah River Site (SRS) and at the Idaho Nuclear Technology and Engineering Center (INTEC) at the INL. The ASNF inventory in the SRS L Basin is from foreign and domestic research reactors (FRR and DRR), and is diverse in terms of design, irradiation, and post-reactor-discharge storage conditions; these factors yield a range of characteristics of cladding oxide films on ASNF. Mixed aluminum (oxy)hydroxide (boehmite and bayerite/gibbsite) films, non-uniform in thicknesses up to a maximum local thickness bounded by 25 μm, were observed on ASNF materials removed from wet storage in the L Basin and in non-sealed dry storage at the SRS following reactor service and a long-term (up to 40+ years) interim storage history. The ASNF inventory at INTEC, in both wet and vented dry storage, is predominantly from the Advanced Test Reactor (ATR), but it also includes DRR and FRR fuel. To address a profound behavior of these films, radiolysis testing of aluminum specimens with mixed type boehmite/bayerite oxide films was performed to develop basic data on G-values for production of radiolytic hydrogen under dry storage conditions with nominal relative humidity, temperature, and cover gas. Modeling and simulation of canister internal environments with postulated inventories of oxide films provides estimation of the evolution of the conditions of the canister loaded with ASNF. Simultaneous Thermal Analysis (TGA/DSC) of hydrated oxide powders, and laboratory-scale aluminum specimens with a bayerite film (∼10 μm) using TGA methods, inform drying time/temperature conditions to be used for the ASNF. A demonstration project is recommended for Verification and Validation of the drying and storage of the ASNF. Remaining major tasks leading up to the hot demonstration include scale-up radiolysis testing and scale-up drying testing. Engineering design with the information from the technology program will establish the safety basis and enable long-term (> 50 years) dry storage compatibility with ASNF in the DOE Standard Canister pending its transportation to and disposal in a repository. This full capability would show the ASNF-in-canister storage system to be road-ready. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquid Metals as Plasma-facing Materials for Fusion Energy Systems: From Atoms to Tokamaks

The objective of our studies was to advance our fundamental understanding of liquid metals as plasma-facing materials for fusion energy systems, with a broad scope: from atoms to tokamaks. The flow of liquid metals offers solutions to significant problems of the plasma-facing materials for fusion energy systems. Candidate metals include lithium, tin, gallium, and their eutectic combinations. However, such liquid metal solutions can only be designed efficiently if a range of scientific and engineering issues are resolved that require advances in fundamental fluid dynamics, materials science and surface science. In our research we investigated a range of significant and timely problems relevant to current and proposed engineering designs for fusion reactors, including high-heat flux configurations that are being considered by leading fusion energy groups world-wide. Using experimental and theoretical tools spanning atomistic to continuum descriptions of liquid metals, and bridging surface chemistry, wetting/dewetting and flow, our research has advanced the science and engineering of fusion energy materials and systems. Specifically, we developed a combined experimental and theoretical program to investigate flows of liquid metals in fusion-relevant geometries, including equilibrium and stability of thin-film flows, e.g. wetting and dewetting, effects of electromagnetic and thermocapillary fields on liquid metal thin-film flows, and how chemical interactions and the properties of the surface are influenced by impurities and in turn affect the surface wetting characteristics, the surface tension, and its gradients. Because high-heat flux configurations produce evaporation and sputtering, which forces rearrangement of the liquid, and any dewetting exposes the substrate to damage from the plasma, our studies addressed such evaporatively driven liquid flows and measured and simulated properties of the different bulk phases and material interfaces. The range of our studies included (i) quantum mechanical calculations that allow inclusion of many thousands of atoms for the characterization of the interface of liquid metals exposed to continuous bombardment by deuterium and tritium as expected in fusion, (ii) molecular dynamics studies of the phase behavior of liquid metals, which (a) utilize thermodynamic properties computed using our quantum mechanical calculations and (b) establish material and wetting properties of the liquid metals, including relevant eutectics, (iii) experimental investigations of the surface science of liquid metals, interacting both with the solid substrate as well as gaseous species, and (iv) fluid dynamical studies that incorporate the material and surface science results of (ii) and (iii) in order to characterize flow in capillary porous materials and the thin-film flow along curved boundaries, both of which are potentially major components of plasma-facing materials. The outcome of these integrated studies was new understanding that enables developing design rules useful for future developments of the plasma-facing components critical to the success of fusion energy systems.

36 MATERIALS SCIENCE↗

Insights from FEED studies for retrofitting existing fossil power plants with carbon capture technology

Recent United States Department of Energy (DOE) sponsored front-end engineering design (FEED) studies for retrofitting existing fossil-fueled power plants with state-of-the-art carbon capture technology contain previously overlooked real-world design considerations for near-term deployment of carbon capture. Insights from examining seven recently published FEED study reports are summarized in this paper. This includes a discussion of the design, performance, and cost implications associated with (1) location-specific considerations such as water availability, land availability, and accessibility; (2) host-plant-specific factors such as flue gas specifications, allowable degree of integration between the capture system and host plant, and operational mode; and (3) miscellaneous factors such as market conditions, permitting requirements, and business case incentives. In conclusion, this manuscript highlights (1) water availability as a key design and cost driver, with host plant steam extraction increasing capture system cooling water availability, (2) modularization and constructability impacts on the number of capture trains, (3) the impacts of host plant operational mode and capacity factor on the business case for installing capture, and (4) the merit of continued research, development, and demonstration efforts addressing steam extraction, host plant tie-in at the stack, solvent reclamation and air emissions control.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Full-scale FEED Study for Retrofitting the Prairie State Generating Station with an 816 MWe Capture Plant using Mitsubishi Heavy Industries Post-Combustion CO 2 Capture Technology

A full front-end engineering design (FEED) study to for a carbon capture system for Unit #2 (816 MWe) at the Prairie State Generating Company’s (PSGC) Energy Campus in Marissa, IL based on the KM CDR Process CO 2 capture technology from Mitsubishi Heavy Industries (MHI) using their proprietary solvent KS-21TM. If built this carbon capture plant would be the world's largest to date. The cost of capture of 100 percent of the plant emissions was calculated to be $43.42 per metric tonne of CO 2 based on levelized costs for 30 years of operation (85% capacity factor), and includes Interest on Debt and Return on Equity During Operation.

01 COAL, LIGNITE, AND PEAT↗

An Update to the National Renewable Energy Laboratory Baseline Wind Turbine Controller

The National Renewable Energy Laboratory's 5-MW wind turbine model is well established as an industry standard and is often used as a comparison model, or a model on which to build upon. Though effective, the legacy controller for the 5-MW wind turbine uses a simple algorithm that is not up to date with many industry standards. Additionally, as the research community has advanced into fast-paced development cycles, as systems engineering tools such as Wind-Plant Integrated System Design & Engineering Model (WISDEM ®) [1] are employed, and as a greater focus on controls co-design practices is encouraged, demand for a generic wind turbine controller has arisen. This work presents updates for the NREL 5-MW controller to a more modern control architecture, and establishes a generic tuning framework that can be easily adapted to various wind turbines. Based on initial results, the updated generic controller eases the automatic tuning process while maintaining or improving the performance of the legacy NREL 5-MW controller.

17 WIND ENERGY↗

Towards standardized nuclear reactors: Seismic isolation and the cost impact of the earthquake load case

We report nuclear energy has a key role to play in global decarbonization. Impediments to the widespread deployment of reactors are their projected high capital cost and levelized cost of energy, and time required to analyze, design, license, construct, and commission them. The earthquake load case is a key cost driver for a new build nuclear plant, because near-surface soils and seismic hazard are different at each site, requiring site-specific analysis, design, engineering, qualification, licensing, and regulatory review, essentially making every design First-of-a-Kind (FoaK). To enable deployment at the scale needed for deep decarbonization, the cost and time impact of the seismic load case must be significantly mitigated, and plants must be standardized. Seismic base isolation has been proven to considerably reduce the earthquake response of structures and equipment but has yet to be applied to a nuclear power plant in the United States, in part because the financial impacts, positive or negative, are not known. Because there are no recent non-proprietary data to characterize the influence of the seismic load case on capital cost, it is difficult to confidently quantify the financial benefits of seismic isolation. Scheme-level designs of two fundamentally different advanced reactor buildings were developed to assemble cost data on the influence of the seismic load case. Both buildings were equipped with three bespoke pieces of safety-related equipment and analyzed for incremented levels of earthquake shaking to quantify the seismic penalty on equipment, in terms of vessel weights and horizontal accelerations. Using analysis results, a questionnaire was developed and transmitted to nuclear utilities, reactor developers, engineers, and equipment suppliers to collect cost data on engineering and fabrication costs for these unique pieces of safety-class equipment. Synthesis of the cost data showed that the seismic load case significantly affects the capital cost (sum of engineering and fabrication cost) of safety-class equipment, with engineering costs being comparable to fabrication costs. Standardization of safety-class equipment is made possible by seismic isolation, that is, equipment designed for minimal seismic robustness can resist earthquake shaking at a site of much higher seismic hazard. The average reduction in the capital cost of the safety-related equipment, enabled by seismic isolation, is a factor of two for FoaK equipment and a factor of five for standardized equipment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

E-Area LLWF Final Closure Cap Design – Constructability Evaluation Criteria for the Plot 8 and NR07E Disposal Areas

SRNS Design Engineering has been asked to complete a constructability evaluation of the proposed final closure cap designs for the Plot 8 (Engineered Trenches ET07, ET08, and ET09) and 643-7E NRCDA (NR07E) disposal areas located outside the original E-Area Low-Level Waste Facility (ELLWF) footprint. This memorandum presents the guidelines and criteria for the constructability evaluation. A new conceptual design for the ELLWF closure cap is not requested at this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Cylinder Diagnostics to Overcome Efficiency Barriers in Natural Gas Engines (LDRD 200166)

The high-level objective of this project is to solve national-security problems associated with petroleum use, cost, and environmental impacts by enabling more efficient use of natural-gas-fueled internal combustion engines. An improved science-base on end-gas autoignition, or “knock,” is required to support engineering of more efficient engine designs through predictive modeling. An existing optical diesel engine facility is retrofitted for natural gas fueling with laser-spark-ignition combustion to provide in-cylinder imaging and pressure data under knocking combustion. Zero-dimensional chemical-kinetic modeling of autoignition, adiabatically constrained by the measured cylinder pressure, isolates the role of autoignition chemistry. OH* chemiluminescence imaging reveals six different categories of knock onset that depend on proximity to engine surfaces and the in-cylinder deflagration. Modeling results show excellent prediction regardless of the knock category, thereby validating state-of-the-art kinetic mechanisms. The results also provide guidance for future work to build a science base on the factors that affect the deflagration rate.

33 ADVANCED PROPULSION SYSTEMS↗

Scale-Up of Coal-Based Supercritical CO 2 cycle technology

The Allam Cycle is a transformational technology that enables a step change in the performance, efficiency, and cost of electricity for electrical generating units by using supercritical CO 2 (sCO 2 ) as the working fluid in the turbine for power generation. The objectives of this Phase I effort were to select a host site for a large pilot system through a process of down selection, develop a conceptual design, and conduct a pre-front-end engineering design (pre-FEED) study for a sCO 2 cycle pilot plant that uses domestic coal reserves as the primary feedstock, thereby furthering technology development of the coal-based Allam Cycle. The project was divided into four main tasks: 1) Project Management and Planning; 2) Conceptual Pilot Plant Definition and Host Site Selection; 3) Preliminary Design, Cost, and Schedule Development; and 4) Commitments and Environmental Information Volume (EIV). All project management activities occurred in Task 1. Host site selection was conducted in Task 2, while conceptual design and pre-FEED activities took place under Task 3. Task 4 enhanced the project by securing commitments for the next phase of the program and completing an initial EIV. The Great Plains Synfuels Plant (GPSP) has been selected as the host site for the large-scale pilot, and its owner, Dakota Gasification Company (DGC), is a committed partner. GPSP was compared to two other host site candidates during Phase I: the existing natural gas Allam Cycle facility in La Porte, Texas, and the Energy & Environmental Research Center’s (EERC) high-bay demonstration facility in Grand Forks, North Dakota. Costs for hosting the pilot plant were estimated for each facility, and those costs are shown in Table ES-1. Based on these estimates, the DGC site was clearly shown to be the lowest cost option and was selected as the host site for the project.

01 COAL, LIGNITE, AND PEAT↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

A systems engineering analysis of three-point and four-point wind turbine drivetrain configurations

This study compares the impact of drivetrain configuration on the mass and capital cost of a series of wind turbines ranging from 1.5 MW to 5.0 MW power ratings for both land-based and offshore applications. The analysis is performed with a new physics-based drivetrain analysis and sizing tool, Drive Systems Engineering (DriveSE), which is part of the Wind-Plant Integrated System Design & Engineering Model. DriveSE uses physics-based relationships to size all major drivetrain components according to given rotor loads simulated based on International Electrotechnical Commission design load cases. The model's sensitivity to input loads that contain a high degree of variability was analyzed. Aeroelastic simulations are used to calculate the rotor forces and moments imposed on the drivetrain for each turbine design. DriveSE is then used to size all of the major drivetrain components for each turbine for both three-point and four-point configurations. The simulation results quantify the trade-offs in mass and component costs for the different configurations. On average, a 16.7% decrease in total nacelle mass can be achieved when using a three-point drivetrain configuration, resulting in a 3.5% reduction in turbine capital cost. This analysis is driven by extreme loads and does not consider fatigue. Thus, the effects of configuration choices on reliability and serviceability are not captured. Furthermore, a first order estimate of the sizing, dimensioning and costing of major drivetrain components are made which can be used in larger system studies which consider trade-offs between subsystems such as the rotor, drivetrain and tower.

17 WIND ENERGY↗

Development of a Solar Heat and Power Co-Generation System. Final Report, CRADA No. TC02152.0

Final Report, CRADA No. TC02152.0. Date Technical Work Ended: October 28, 2013. This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Tassajara Technologies, Inc. (TTI), to develop, fabricate and demonstrate a Solar Heat and Power Co-generation System. The technical objectives of this CRADA were to engineer, design and build a prototype Solar Thermal Process Heat and Power Demonstration System that would be suitable for use at the Arc of Hilo food processing facility. This would be accomplished in two phases. The first phase would entail the building of a prototype at Tassajara facilities. Base design parameters, including the subsystem interactions that would produce reliable performance at the lowest cost per watt of energy generated with the desired balance of power and heat to meet the requirements of the designated food processing applications from Arc of Hilo, would be provided by LLNL. The data and design development would be integrated into the second phase engine prototype and solar thermal system that would be built and delivered, with interface requirements to the Miko Building. This project was originally designated as an eight (8) month project. However, it was ultimately extended by an additional thirty-five (35) months, for total project duration of forty-three (43) months.

14 SOLAR ENERGY↗