Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electricity Market”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Lithium Battery Power Delivers Electric Vehicles to Market

Hybrid Technologies Inc., a manufacturer and marketer of lithium-ion battery electric vehicles, based in Las Vegas, Nevada, and with research and manufacturing facilities in Mooresville, North Carolina, entered into a Space Act Agreement with Kennedy Space Center to determine the utility of lithium-powered fleet vehicles. NASA contributed engineering expertise for the car's advanced battery management system and tested a fleet of zero-emission vehicles on the Kennedy campus. Hybrid Technologies now offers a series of purpose-built lithium electric vehicles dubbed the LiV series, aimed at the urban and commuter environments.

Source record↗

The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence from England and Wales

This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

Forbes, Kevin F.↗

Probabilistic Forecasting of Generators Startups and Shutdowns in the MISO System Based on Random Forest

Solving security constrained unit commitment (SCUC) problems to plan an economical generation schedule for day-head electricity market has been an important research topic in recent years. Mixed integer programming method (MIP), the-state-of-art approach for solving SCUC problem, is known computationally hard when the number of binary status variables is large. In this paper, a machine learning-based algorithm - random forest (RF), was applied to forecast the startups (SU) and shutdowns (SD) hours of generators, based on historical hourly system condition observations in the Midcontinent Independent System Operator (MISO) system. The main purpose is to reduce the number of binary status variables, by fixing the SU/SD hours to a narrow range of high confidence. This would significantly reduce the size of the decision space, and therefore speed up SCUC solutions with reduced uncertainty.

Lin, Xinming↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

2023 Real-time Optimization Workflow Status Update

Nuclear integrated energy systems are composed of a diverse set of energy generation sources and exist in dynamic and competitive electricity markets. With the inclusion of thermal energy storage, nuclear power systems can store heat for future use through various processes, such as water desalination or hydrogen generation. This heat storage can be managed in such a way as to economically optimize its usage. By combining real-time price data from the day-ahead and real-time markets with predictive and intelligent models, the charging and discharging of the thermal energy storage may be determined and optimized. This research details an approach through models and systems for the real-time optimization (RTO) of capacity allocation. Virtual models of the energy system and its physics phenomenon and component interactions provide intelligence to verification and prediction of operations. An optimization framework can use data generated from both a set of physical assets as well as the virtual models to predict future performance and create optimization and control workflows. Data warehouse technologies can be used to combine data across models, optimization workflows, market price data, and sensor data to intuitively store various types of data and provide integrations to physical control systems as well as user visualizations. Put together, these components can create a system for the RTO of nuclear integrated energy systems. Various virtual models and bench-scale physical demonstrations have been successfully performed and verified using this system. Larger scale testbeds that include thermal energy storage systems have been identified as future opportunities. A gap analysis that details the steps necessary to reach a physical demonstration at this scale is provided, along with conclusions on the current effort and future work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Anomaly Detection and Mitigation for Dynamic Frequency Regulation in Hydropower-Battery Systems: Preprint

Hydropower operators and energy storage providers are increasingly interested in participating in frequency regulation services, driven by the incentives offered by independent system operators, such as the Pennsylvania-New Jersey-Maryland Interconnection (PJM), in a competitive electricity market. This transition, however, unfolds against the backdrop of a modernizing and rapidly digitizing power grid, exposing the integrated legacy infrastructure and vulnerable communication networks to a multitude of cybersecurity threats. These evolving threats not only endanger grid operations but also have the potential to trigger cascading disruptions across the broader grid network and influence regulation markets. This work presents an approach for developing an anomaly detection and mitigation system to address cybersecurity challenges during the participation of a hydropower-integrated battery energy storage system (BESS) in a frequency regulation market. The applied anomaly detector utilizes machine learning algorithms to provide detailed classification of cyber-physical events and provide a comprehensive situation awareness to grid operators. Later, the applied mitigation system triggers predefined corrective actions to minimize the impact of data integrity attacks on the regulation market and system stability. We evaluated the proposed approach on a fully active BESS topology using the slow regulation signal (Reg A) coming from the PJM market. Our simulation results reveal that the proposed approach performs well in detecting data integrity attacks within the allocated time frame and also minimizes the system's instability and economic loss during the participation of hydropower and BESS in the regulation market.

battery energy storage system↗

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗

Wyoming CCUS Study: Regional Electricity and Environmental Markets

This study is accompanies the Leonardo Technologies, Inc. study performed for the Office of Fossil Energy entitled: ''Wyoming Carbon Capture, Utilization, and Storage (CCUS) Report''. In this study, NETL examined the regional electricity and environmental markets impacts of maintaining coal-fired generating units identified for retirement in the 2019 PacifiCorp Integrated Resource Plan (IRP) through retrofit with CCUS. In this study, the authors propose an alternative least cost resource portfolio that includes a CCUS option along with resources identified in the IRP required to meet service obligations. This alternative portfolio is estimated to produce a lower CO 2 emissions footprint and a lower cost to the consumer than the proposed IRP.

01 COAL, LIGNITE, AND PEAT↗

Addressing Market Issues in Electrical Power Systems with Large Shares of Variable Renewable Energy

This paper reports recent findings from IEA Wind TCP Task 25, which compiles international experiences and research related to large-scale integration of wind and other renewable energy. In the paper, we address the main challenges for market integration of variable renewable energy, relating to price formation, cost recovery, balancing and other grid services. The paper gives an overview of recent scenario studies on electricity price impacts of (1) various generation, energy storage and demand types in different markets, and (2) different market designs and energy/climate policies. Studying markets with very high shares of variable renewable energy requires an improved set of analysis tools for forecasting market outcomes, estimating flexibility needs and sources, and assessing resource adequacy. Key market features need to be investigated within these improved analytical capabilities for systems transitioning to high shares of variable renewable energy, storage and flexible demand. System services that can be supported by markets will likely need to be revisited. Finally, this paper identifies open questions and suggested future market design work for supporting systems with very high shares of variable renewable energy, which are to be addressed in follow-up work of Task 25 collaborative research.

cost recovery↗

Estimating the Value of Nuclear Integrated Hydrogen Production and the Dependency of Electricity and Hydrogen Markets on Natural Gas

Producing low carbon Hydrogen at a competitive price is one of the challenges to hydrogen being part of the solution to reach net-zero emission targets set by the U.S. DOE by 2050. With projected near-term improvements in technology, hydrogen production via solid oxide electrolysis cell (SOEC) / high-temperature steam electrolysis (HTSE) integrated with existing light water reactor (LWR) Nuclear Power Plants (NPP-HTSE) can produce carbon-free hydrogen competitively. In the near term, a 10-year production tax credit (PTC) found in the Inflation Reduction Act (IRA) has been passed, which will catalyze the development and improvement of hydrogen production technology to be competitive. The “1-1-1” target set by the U.S. DOE is to reduce the cost of carbon-free hydrogen by 80% to $1 per kilogram in 1 decade. Several models are available to analyze the profitability, opportunity, and technical capability of NPP-HTSE systems. In order of complexity from most complex to least complex some of these models include: RAVEN/HERON, process models using Aspen HYSYS and capital expense estimations using Aspen Process Economic Analyzer (APEA) and levelized cost of hydrogen (LCOH) calculation using the H2A model (Hydrogen Analysis Model), and custom spread sheets built by the interested party. Though some of the more advanced existing models provide detailed analysis to complex grid integrated problems, they also can take considerable time to setup and run. These advanced models are well suited to complex grid integrated analysis and the consideration of flexibility and variability of regulated and de-regulated electricity price and advanced estimation of capital and operating expenses and heat and material balances.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

US Geothermal Electricity and Heat Market Analysis and Report

The power production data from FY19 is provided for U.S. geothermal power plants. The spreadsheet includes the plant name and type, nameplate capacity, summer capacity, winter capacity, and net generation for each power plant.

15 GEOTHERMAL ENERGY↗

The enduring role of contracts for difference in risk management and market creation for renewables

Governments procure renewables through a variety of mechanisms. Contracts for difference (CfDs) have been used for more than 50% of the global offshore wind supply. The payments awarded through CfDs are sometimes labelled subsidies, suggesting that they support uneconomic activity. Here, in this study, we argue that the primary role of CfDs is rather risk management by creating a market for electricity supply at stable long-term prices. Similar to its use in other sectors of the economy, this contract type transforms a variable to a fixed price to reallocate volatility risks. Such long-term contracts are often necessary for renewables financing due to limited hedging options in existing markets. Our perspective could imply a shift in perception towards CfDs as a fundamental and lasting market feature. We hope to stimulate a timely discussion about the impact of greater CfD diffusion on electricity market mechanisms, risk allocation and the potential for combining fragmented streams of energy finance, market and policy research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Effect of Prosumer Duality on Power Market: The Effect of Market Regulation

Electricity prosumers are energy subsystems that not only consume, but also produce electricity. They are present in distribution level networks as traditional utility customers who have installed distributed energy resources. They are also present in transmission level networks as large conglomerates own both generation assets and large industrial loads. Previous work on the economics of prosumers has demonstrated that prosumers in a market have incentives to behave more competitively compared to producers and consumers in traditional markets. This paper further explores the behavior of prosumers and their response to market policies including the allocation of network losses and the impact of net metering. We extend a Cournot model of a dual prosumer and find that prosumers respond with higher supply quantities if network losses are allocated to demand base. They respond with lower supply quantities if network losses are allocated to supply base. Allocating network losses to demand base also causes equilibrium prices to decline. Markets where prosumers first satisfy their own load and then sell the balance of electricity to the grid have lower quantities and higher prices compared to markets where prosumers buy and sell at locational marginal price.

Tsybina, Eve↗

A Primer on FERC Order No. 2222: Insights for International Power Systems

The U.S. Federal Energy Regulatory Commission (FERC) Order No. 2222 is heralded as a landmark rule on distributed energy resources (DER). Issued in September 2020, it is specifically designed for organized wholesale power markets. The rule is nonbinding for utilities that have not chosen to join an organized wholesale power market. This primer, which analyzes the order, focuses on potential insights for similar changes in the international power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lessons Learned for Transmission Cost Allocation in U.S. Regional Markets

Expanding electric transmission can facilitate generator interconnection and improve grid reliability. Assigning costs for new transmission infrastructure is highly contentious because these costs can have a direct impact on energy prices and ratepayer bills. In this report, we evaluate what factors influence successful transmission cost allocation agreements. Through a review of legal disputes, existing cost allocation practices, and regional case studies, we identify potential strategies to minimize cost allocation disputes for future projects. The report also highlights the processes by which regions can update their cost allocation methods. While we do not consider cost allocation methods currently under development for compliance with FERC Order 1920, the trends and lessons learned identified in this report can inform discussions on effective cost allocation methods to reduce barriers for transmission development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗