At least 289 records · Page 16

Optimization Framework to Assess the Demand Response Capacity of a Water Distribution System

As large electricity consumers, water distribution system (WDS) pumping stations have the potential to become meaningful participants in demand response (DR) programs. The authors propose an optimization framework for assessing the DR capacity of a WDS and identifying the optimal bidding strategy for maximizing WDS revenue in the DR spot market. The proposed mixed integer linear programming (MILP) model overcomes computational constraints of previous DR optimization models by adopting a preprocessing procedure to minimize the number of binary variables and implementing a convex relaxation technique to linearize the hydraulic equations. The proposed MILP model also explicitly accounts for varying levels of risk tolerance of WDS operators by varying the recovery period over which pumping returns to business-as-usual operation. The optimization framework is implemented on a skeletonized 48-node WDS model that includes 7 pumps, 6 tanks, and 39 pipes. Using a simulated DR event and water consumption profile, the authors derive the optimal DR supply curves (i.e., compensation price versus load curtailment quantity) and revenue potential of the WDS under six scenarios for DR participation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence↗

HERO WEC Belt Test Data

The following submission includes raw and processed data from the 2024 Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) belt tests conducted using NREL's Large Amplitude Motion Platform (LAMP). A description of the motion profiles run during testing can be found in the run log document. Data was collected using NREL's Modular Ocean Data AcQuisition (MODAQ) system in the form of TDMS files. Data was then processed using Python and MATLAB and converted to MATLAB workspace, parquet, and csv file formats. During Data processing, a low pass filter was applied to each array and the arrays were then resampled to common 10Hz timestamps. A MATLAB data viewer script is provided to quickly visualize these data sets. The following arrays are contained in each test data file: - Time: Unix seconds timestamp - Test_Time: Time in seconds since beginning of test - POS_OS_1001: Encoder position in degrees (the encoder is located on the secondary shaft of the spring return and is driven by the winch after a 4.5:1 gear reduction) - LC_ST_1001: Anchor load cell data in lbf - PRESS_OS_2002: Air spring pressure in psi This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

Effects of delta ray electrons on measurement uncertainties of harp system

A harp system, which is a multi-wire beam profile monitoring (MWPM) system, is planned upstream of the spallation target to make in situ calibration of beam current density configuration on the target along with beam imaging from luminescent coating on the beam entrance window at the Second Target Station (STS) of the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). This beam interception-based beam diagnostics system on the target will be used to ensure that the maximum beam loads on the target are within the design range during neutron production. Current design of the harp consists of three layers of measurement wires each of which is sandwiched between voltage biasing wire planes. The signal obtained from each measurement wire layer is disturbed by secondary electrons (SE) and delta rays produced by beam-matter interactions in neighboring wires and ionization of residual gases in accelerator vacuum. While the backgrounds from SE can be suppressed by voltage biasing, the delta-ray electrons with kinetic energies above keV ranges overcome the electric potential bias. In this paper, we study the effects of delta-rays on the measurement uncertainties of MWPM using the particle transport simulation code FLUKA. Furthermore, the cases where the harp system is installed in the proximity of a large delta ray sources such as proton beam window or in the core vessel filled with sub-atmospheric gas have been studied.

Lee, Yong Joong↗

The advanced tokamak path to a compact net electric fusion pilot plant

Abstract Physics-based simulations project a compact net electric fusion pilot plant with a nuclear testing mission is possible at modest scale based on the advanced tokamak concept, and identify key parameters for its optimization. These utilize a new integrated 1.5D core-edge approach for whole device modeling to predict performance by self-consistently applying transport, pedestal and current drive models to converge fully non-inductive stationary solutions, predicting profiles and energy confinement for a given density. This physics-based approach leads to new insights and understanding of reactor optimization. In particular, the levering role of high plasma density is identified, which raises fusion performance and self-driven ‘bootstrap currents’, to reduce current drive demands and enable high pressure with net electricity at a compact scale. Solutions at 6–7 T, ∼4 m radius and 200 MW net electricity are identified with margins and trade-offs possible between parameters. Current drive comes from neutral beam and ultra-high harmonic (helicon) fast wave, though other advanced approaches are not ruled out. The resulting low recirculating power in a double null configuration leads to a divertor heat flux challenge that is comparable to ITER, though reactor solutions may require more dissipation. Strong H-mode access (x2 margin over L–H transition scalings) and ITER-like heat fluxes are maintained with ∼20%–60% core radiation, though effects on confinement need further analysis. Neutron wall loadings appear tolerable. The approach would benefit from high temperature superconductors, as higher fields would increase performance margins while potential for demountability may facilitate nuclear testing. However, solutions are possible with conventional superconductors. An advanced load sharing and reactive bucking approach in the device centerpost region provides improved mechanical stress handling. The prospect of an affordable test device which could close the loop on net-electric production and conduct essential nuclear materials and breeding research is compelling, motivating research to validate the techniques and models employed here.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

BuildingsBench: A Benchmark for Universal Building Load Forecasting [SWR-23-51]

The residential and commercial building stock in the United States is responsible for a significant percentage of energy consumption and greenhouse gas emissions. Electrification of end-uses, as well as decarbonizing the electrical grid through renewable energy sources such as solar and wind, constitutes the pathway to zero-emission buildings. Forecasting day-ahead building energy consumption is an integral part of this solution. Currently, specialized forecasting models are hand-made for each individual building, which is time-consuming, expensive, and leads to duplicated efforts. BuildingsBench is a Python software framework for training and comparing generalized machine learning models for universal building load forecasting. This challenge tasks a single foundational model to generalize its forecasts for a wide variety of buildings, across geographic regions, building types, weather patterns, and more. This software provide code for pre-training such models and subsequently evaluating their performance on a suite of hundreds of diverse real and synthetic buildings. BuildingsBench is a platform for: - Large-scale pretraining with the synthetic Buildings-900K dataset for short-term load forecasting (STLF). Buildings-900K is statistically representative of the entire U.S. building stock and is extracted from the NREL End-Use Load Profiles database. - Benchmarking on two tasks evaluating generalization: zero-shot STLF and transfer learning for STLF. We provide an index-based PyTorch Dataset for large-scale pretraining, easy data loading for multiple real building energy consumption datasets as PyTorch Tensors or Pandas DataFrames, simple (persistence) to advanced (transformer) baselines, metrics management, and more.

Emami, Patrick↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗

First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis

The First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis (aka the STEP 1 Project or the Project) aimed to (1) developed a brand-new web tool that could provide decision support through free, rapid techno-economic analysis of behind-the-meter solar+storage systems for industrial process heat and (2) conduct high-level analyses of the cost-competitiveness of the same systems across the US in key sectors. The STEP 1 web tool collects key location, land availability, thermal load profile, proccess heat temperature and media, and other key parameters through an easy-to-use user interface (UI). The UI was designed to meet the user at their level of understanding by minimizing the number of required inputs as much as possible while including options for more nuanced inputs if the user desires. STEP 1 advises users on which solar thermal tehcnologies that could fit their needs based on the inputs provided (namely process media and temperature). The tool can model a wide range of solar thermal technologies including flat plate collectors, evacuated tubes, parabolic troughs, linear Fresnel, and molten salt towers all with corresponding thermal energy storage (TES) - solar PV with resistive heating and TES is also included. Once the parameters are collected, a nominal thermal energy production profile for the facility's location is generated using NREL's System Advisory Model (SAM) and then passed to a modified version of NREL's REopt platform to optimize the size (capacity) and dispatch of the solar+storage system to minimize lifecycle costs subject to energy balance, fuel and electricity rates, emission reductions goals, and other constraints. This entire process takes less than 20 minutes, is completely free, requires zero coding skills, and provides the user with a high-level assessment on the techno-economic feasability of deploying solar+storage systems for their energy needs. In addition to the development of the STEP 1 web tool, the project completed two complementary analyses focused on leveraging the backend code of STEP 1, public industrial facility locations and fuel consumption data, and key sector information to assess the economic opportunity of reducing fuel costs at various levels of capacity factor around the US. Both analyses found that there are key markets, locations, industrial sectors (namely food and beverage), and degrees of offset where solar thermal technologies could be cost-effectively deployed, highlighting a key market entry point for these technologies, and assessing deployment potential. In summary, the STEP 1 project improved the opportunities for solar+storage systems to expand into the industrial process heat market through breaking down barriers to assessing these technologies.

14 SOLAR ENERGY↗

From Cell to System: Accelerated hpc Simulations of BESS Aging under Frequency Regulation and Arbitrage use cases

Lithium-ion battery energy storage systems (BESS) packs have emerged as a leading solution for grid-scale energy storage, enhancing resiliency and balancing load fluctuations. Yet, experimental characterization of large-format LIB packs-particularly to assess performance and degradation over hundreds of cycles - demands substantial hardware investment and multi-year testing campaigns. In this work, we couple a hierarchical, physics-based modeling framework agnostic to electrode chemistries with high-performance computing to accelerate systems level evaluation by upto two orders of magnitude. Building on the open-source liionpack platform, we implement cell, module, and pack-scale electrochemical models enriched with mechanistic aging mechanisms and deploy them on an HPC cluster to simulate 150−200kWh systems over 500 - 1,000 cycles with in days. We subject these virtual B ESS to both constant-current cycling and realistic grid service profiles spanning frequency regulation, ramp-rate support, and energy arbitrage-and quantify the resulting degradation patterns. Our results reveal that localized cell aging can induce substantial nonuniformity at module and pack levels, with service-specific cycling protocols driving distinct aging modes. This rapid, multiscale modeling approach provides a powerful design-space exploration tool for optimizing electrical architecture, control strategies, and operational schedules to prolong pack lifetime and lower total cost of ownership.

Ayalasomayajula, Surya [ORNL] (ORCID:0009000860788↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparison of temporal resolution selection approaches in energy systems models

Capacity expansion models for the power sector are used to project future decisions over the coming decades by simulating investment and operation decisions for the use of electricity. Due to model performance constraints, these models typically do not explicitly simulate every hour within a year, but instead simulate representative time segments (groups of hours). This paper evaluates different approaches for selecting time segments across three methods: sequential, categorical, and clustering, across a wide range of time-segment quantities, for a total of 204 temporal profiles. To measure the performance of each profile's ability to accurately represent data, the root-mean-square-error of each profile's time segments are compared to the data's original hourly data. The temporal alignment across regions is also measured (i.e., how often windy days align across regions). Different spatial resolutions were applied for a subset of the temporal selection methods to investigate the impact spatial resolution has on performance. This paper provides a framework for measuring the value of different temporal selection methods and of adding more granular data to energy system models. Overall, multi-criteria clustering yields the lowest root-mean-square-error across all datasets evaluated and provides a holistic view of the intertwined relationships between renewable generation and electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Model-Free Voltage Control Approach to Mitigate Motor Stalling and FIDVR for Smart Grids

Electric power networks are large and highly nonlinear dynamical systems that present unique challenges to control design. Though there is a large number of dynamic models for power system stability and control, many models are only useful with right assumptions and wrong for other tasks. Moreover, the dynamic behavior of the grid is increasingly complex under the banner of smart grids. These lead to the difficulty of developing appropriate dynamic modeling, and thus an efficient control strategy. To avoid such modeling challenges, here we present a novel dynamic voltage control strategy based on a model-free control (MFC) approach, requiring no modeling procedure. In particular, it focuses on fault-induced delayed voltage recovery (FIDVR) events, which require complex and accurate dynamic load models to replicate such events. This work utilizes MFC as an online controller to achieve the desired voltage stability under the FIDVR event. The proposed MFC strategy allows simple implementation and low computational cost for efficient mitigation of FIDVR. For benchmarking, a reasonably accurate dynamic performance model is explored. Simulation results with the IEEE 57 bus test network demonstrate the enhanced dynamic voltage profile for load buses having induction motors with the support of reactive power resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVs@Scale Next-Gen Profiles - Fleet Utilization 2024

As part of the U.S. Department of Energy’s EVs@Scale initiative, the Next-Gen Profiles (NGP) project provides a comprehensive, data-driven analysis of electric vehicle (EV) and electric vehicle supply equipment (EVSE) operations across real-world fleet deployments. This paper presents findings from the NGP’s Fleet Utilization study, which investigates operational behavior and asset usage across seventeen EV fleets and two EVSE fleets, encompassing a wide range of vehicle types and use cases. Data collected from diverse sources—varying in format and temporal resolution—are first reformatted into a unified structure. From this harmonized dataset, a suite of rigorously defined performance metrics is calculated at an hourly cadence, enabling consistent cross-comparison of charging, routing, and other key operational behaviors. Amid rapidly increasing EV adoption and growing demands for energy-efficient fleet operations, the analysis reveals clear utilization trends—including diurnal and weekly activity cycles, differences in short versus long charging session dependencies, and route-specific energy usage patterns. These findings highlight the need for tailored infrastructure strategies and the deployment of advanced energy management systems, such as Distributed Energy Resource Management Systems (DERMS) and Site Energy Management Systems (SEMS), which can optimize charging schedules and mitigate peak loads. By leveraging anonymized, harmonized datasets and standardized metrics, this study offers critical insights into fleet behavior and performance, providing a foundation to improve operational efficiency, reduce costs, and enable the scalable deployment of electrified transportation.

Wells, Landon↗

Faster-than-real-time Simulation with Demonstration for Resilient DER Integration

The US electric grid is facing operational, stability, and security challenges. Transmission system operators need some measure of visibility into distribution system renewable generation. Distribution system generation needs to support transmission system voltage. The grid is experiencing an expansion in measurement systems. How to take full advantage of this expansion and defend against attacks, both cyber and physical, poses additional challenges. The Faster-than-real-time Simulation with demonstration for Resilient DER Integration project set out to do the following: a. Flatten the voltage profile through the feeders and system for cost saving and voltage stabilization needs. b. Increase the amount of intermittent distributed energy resources (IDERs) that could be deployed on a utility feeder and provide 100% or more energy needed for the demands on that feeder, and c. based on an accurate model (Digital Twin) of the utilities system, be able to detect any abnormalities on the utilities distribution system. To manage the voltage and increase IDER penetration (a,b), Graph Trace Analysis is employed in a time-series, optimal power flow to coordinate the time-varying feedback control setpoints of a distribution feeder’s utility control devices. Under the coordinated control are a Load Tap Changing Transformer, a voltage regulator, and five switched capacitor banks. The feeder serves over 2000 customers, the feeder secondaries are modeled, and the feeder has 2.3 MW of PV generation, corresponding to a 17.4% penetration of PV generation. The feeder model has over 12,000 components, where every customer load bus and PV generator are modeled. The accuracy of the power flow solution is compared against historical meter voltage measurements, the improvement in conservation voltage reduction energy savings as a function of the coordinated control desired voltage profile is investigated, and the increase in PV penetration of the coordinated control over the existing control is presented. To achieve improved control performance while observing system operation constraints, bellwether Advanced Metering Infrastructure (AMI) voltage measurements are used to adjust the desired voltage profile used by the optimal power flow analysis. To detect and alleviate or negate attacks or failures on the distribution and transmission utility grids (c) the grid needs to be resilient and self-healing. In this project software was designed to do just that. At the center of the software is an Integrated System Model (ISM) that spans from transmission to secondary distribution. The ISM is employed in real-time abnormality detection, voltage stability forecasting, and multi-mode control. Testing results are presented for: 1—attacks on utility infrastructure; 2—energy savings from optimal control; 3—distribution system control response during a low voltage transmission system event; 4—cyber-attacks on PV inverters, where physical inverters are used in hard-ware-in-the-simulation-loop studies. Contributions of this work include real-time analysis that spans from three-phase transmission through secondary distribution; an approach for detecting abnormalities that employs measurements from three independent measurement systems; and a multi-mode distribution system control that responds to cyber-attacks, physical attacks, equipment failures, and transmission system needs.

Integrated System Model, Graph Trace Analysis, Adv↗

Design of a novel carbon/carbon composite microvascular solar receiver

Solar thermal power tower systems are the primary technology being proposed for solar electricity from thermal energy. Operational limits on these towers are often driven by mechanical properties under significant thermal loads, particularly at the receiver where incoming flux is converted to thermal energy. While the solar receiver’s efficiency is largely driven by its optical properties, thermomechanical stresses on the receiver limits the operational envelope. One pathway to higher efficiency is greater allowable solar fluxes on the receiver but novel materials are required. The present study uses computational fluid dynamics to describe a parametric design space for a microvascular carbon/carbon composite solar receiver as a new material option for high flux solar receivers. Simulations are conducted for different microvascular geometries considering the role of material properties and heat transfer fluids, for the impact on thermal efficiency, and allowable strain. Results show that microscale receiver modules made of the proposed carbon/carbon composite could achieve thermal efficiencies over 90% and full-scale receivers can achieve up to 85% thermal efficiency for the design explored considering realistic strain limits, flux levels, and material properties. These values are highly dependent on the heat transfer fluid pairing, the through plane thermal conductivity of the carbon/carbon composite, the path architecture of the microscale receiver, and the incident solar flux profiles.

14 SOLAR ENERGY↗

Opportunities and Challenges to Capturing Distributed Battery Value via Retail Utility Rates and Programs

Distributed battery deployment is increasing with advanced metering, control, and communication technologies, leaving electric utilities with an under-utilized, flexible grid resource in aggregate. Rates can reflect locational and temporal prices while utility incentive-based programs allow DERs to provide direct grid services. However, utilities must balance accurately reflecting dynamic grid conditions versus simple and feasible design that encourages customer participation. Currently, most rates and incentive-based programs are simple, but as penetration of DER and advanced controls increase, dynamic designs could become prevalent. Utilities could encourage providing multiple services to optimize distributed battery dispatch and value streams, however, challenges persist when stacking services across distribution and bulk systems. A DER committed to multiple discrete services concurrently necessitates coordination between operators and a clear hierarchy of commitments. One way to address this is to separate commitments by time or capacity. For services that follow cyclic, predictable patterns, or those that are peak driven with predictability, an operator could ensure sufficient state of charge for participation, leaving time where a distributed battery could otherwise provide different services by segmenting participation temporally. To provide continuous or unexpected services, a battery operator may use state of charge management to reserve some percentage of the battery and segment participation by capacity. Macroeconomic trends, load patterns, generation profiles, and grid configurations drive variation in value and the subsequent implications for utility offerings and how a customer might participate. As distributed battery adoption increases, both regulators and utilities will need to ensure no adverse grid impacts and encourage provision of societal value beyond the customer domain.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lithiation Gradients and Tortuosity Factors in Thick NMC111-Argyrodite Solid-State Cathodes

Achieving high energy density in all-solid-state lithium batteries will require the design of thick cathodes, and these will need to operate reversibly under normal use conditions. We use high-energy depth-profiling X-ray diffraction to measure the localized lithium content of Li 1-x Ni 1/3 Mn 1/3 Co 1/3 O 2 (NMC111) through the thickness of 110 μm thick composite cathodes. The composite cathodes consisted of NMC111 of varying mass loadings mixed with argyrodite solid electrolyte Li 6 PS 5 Cl (LPSC). During cycling at C/10, substantial lithiation gradients developed, and varying the NMC111 loading altered the nature of these gradients. Microstructural analysis and cathode modeling showed this was due to high tortuosities in the cathodes. This was particularly true in the solid electrolyte phase, which experienced a marked increase in tortuosity factor during the initial charge. Our results demonstrate that current distributions are observed in sulfide-based composites and that these will be an important consideration for practical design of all-solid-state batteries.

25 ENERGY STORAGE↗

Heat Pumps with Phase Change Thermal Storage: Flexible, Efficient, and Electrification Friendly

As we continue to electrify space- and water-heating, the electricity demand profile of many buildings will change significantly, and periods of high electricity demand will likely not align with renewable energy generation. We expect electricity demands will increase substantially in the winter, annual maximum electricity demands will increase, and more regions will experience annual peak electrical demands – and higher wholesale electricity prices – in the winter. This is especially important for cold climates where 60% of site energy use in buildings is for heating, and where heat pumps perform least efficiently. This paper focuses on one promising solution among the many paths to electrification: the use of phase change materials (PCM) for compact low-cost thermal energy storage (TES). We present the design and simulation of a combi heat pump and phase change thermal storage system used for space- and water-heating in a multifamily residence in a cold climate. To assess the benefits of this technology, we compare its annual performance to that of a current state-of-the-art air-to-air heat pump and separate heat pump water heater. Simulation results for IECC Climate Zone 6A reveal that the combi heat pump with phase change thermal storage can reduce the design size for heat pumps by 40-60%, reduce maximum electric demand by 30-50%, reduce electricity use during 4-12-hour load shed periods by 50%, and avoid the need for auxiliary electric resistance for both space- and water-heating. Tariff structures are highly varied between different utilities and currently reflect higher wholesale market prices for electricity during summer days. Consequently, although this system design provides large electric demand reductions during hypothetical 4-12-hour load shed periods, it does not provide energy cost reductions with current winter residential time-of-use tariffs.

Helmns, Dre↗