Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

System Modeling of a Lunar Molten Regolith Electrolysis Plant

Introduction: In-Situ Resource Utilization (ISRU) is the process of extracting local resources to produce commodities for propulsion, life support systems, and off-planet construction rather than transporting consumables from Earth. Molten Regolith Electrolysis (MRE) is a novel ISRU method of extracting oxygen gas and metal alloy from lunar regolith. The MRE process involves placing lunar regolith between two electrodes, through which current is passed, to melt the regolith and reduce the metal oxide constituents by direct electrolysis (e.g. FeO, SiO2, MgO, Al2O3) into oxygen gas and metal alloys. The oxygen is liquefied and used as propellant for landers, while the metals (e.g. Ferro-alloys) are further processed and used in structural building materials and parts manufacturing. A system model was developed that accounted for the major processes of an MRE plant (from excavation of raw materials to storage of products) to assess the feasibility of a lunar MRE plant. The System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team utilized its previously documented system sizing model, the Mission Analysis and Integration Tool (MAIT) [1] as framework of the system model. MAIT uses MATLAB/Simulink to integrate subsystem models into a complete system model of the MRE plant. Total mass, volume, and power requirements were computed for numerous iterations of a MRE plant. System Model: Figure 1: MRE Plant Block Diagram The regolith excavation model determines the mass and power needed to excavate sufficient regolith. The preheating auger initiates the regolith heating process before regolith enters the MRE re-actor to reduce the energy required to turn the solid into a molten liquid. The MRE reactor is modeled in COMSOL Multiphysics and based on the research by Dominguez, Sibille, and Schreiner [2, 3, 4]. This preliminary reactor model provides an accurate calculation of thermal equilibrium during electrochemical operation of the reactor system to assess the optimal mass and power required to process the inlet flow of regolith. The model also computes the outlet flowrates of oxygen and molten products. For this analysis, the primary components of the metal alloy considered were iron and silicon. The oxygen is then purified using an Yttrium Stabilized Zirconia (YSZ) electrode, followed by liquefaction using a 90K cryocooler to be stored as liquid oxygen in insulated cylindrical tanks. In future iterations of the system model, the molten metal tapped from the MRE reactor will undergo additional processing or refinement. However, downstream handling of metals is currently a technology gap that is missing a high TRL subsystem model. Therefore, for this analysis, the accumulated metal alloy stream terminates after leaving the MRE reactor. Study Goals: This analysis investigates multiple input variables to the system to determine the sensitivity of a (near) complete plant at full-scale. This preliminary investigation ran parametric sweeps on the MRE reactor geometry, electrical current supply, layers of multi-layer insulation (MLI) on the reactor, size of the electrodes in the oxygen purification model, and regolith composition (based on landing site location). Three production targets of oxygen (1,000, 10,000, and 50,000 kg/yr) were investigated for this analysis. The parametric sweeps conducted in this analysis provide valuable insight into the expected impact of the various model inputs on plant size. This information can be used to identify the most critical components of the plant and guide future decisions on allocating funding for research and development, providing subsystem developers with appropriate interfaces with downstream and upstream processes, and assessing the overall feasibility of MRE when compared to other ISRU plants. References: [1] Carlson, A. et al. (2024) ICES, ICES-2024-53. [2] Dominguez, D.A., and Sibille, L. (2011) AIAA, AIAA-2011-700. [3] Schreiner, S.S. (2015) MIT, Dissertation. [4] Schreiner, S.S. et al. (2016) ASR, 57(7), pp.1585-1603.

ISRU↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can substantially facilitates robot and remote system design and implementation. While AM is not a panacea to fix bad design concepts, properly used AM can creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available commercially for quite some time and is regularly used to facilitatefor prototyping and test fitting of parts later to be before they are fabricated fromin metal or to produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples thato illustrate the possibilities and to identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part.

Noakes, Mark↗

Correlation of Scan and Sample Measurements Using Appropriate Sample Size

At a former nuclear fuel cycle facility, radiological site characterization performed in the 1990's relied on surface soil samples collected and analyzed on a systematic sampling grid, supplemented by 100% scans of the property to identify soil exceeding decommissioning criteria. Biased sampling was performed as indicated by these measurements to provide more precise delineation of material exceeding the decommissioning criteria of 0.37 Bq/g total thorium (the Criteria). All material exceeding the Criteria was to be excavated for shipment to a licensed disposal facility. The site characterization plan called for collection of {approx}100-gram soil samples on a ten-meter grid, at which locations the gamma exposure rate was recorded at a height of 1 meter above grade. While 25-gram aliquots of the soil samples were being counted by gamma spectroscopy, the area was surveyed with a 7.6 cm X 1.27 cm (3'' X 1/2'') NaI gamma detector positioned 1 meter above grade. Count rates were recorded every two seconds while the detector moved at less than one meter per second, resulting in readings at nearly one-meter intervals. Scan records were reviewed; locations exceeding a pre-determined threshold were sampled to identify material exceeding the decommissioning criteria not identified in the systematic sampling effort. Location data (X, Y, and Z) were imported into an interactive database with {mu}R/hr measurements, sample count results, and scan readings. Data was graphically portrayed by color-coding data and superimposing the measurements on maps. Data reviewers could thereby review all types of data superimposed on each other to minimize review time, and to easily identify areas requiring further investigation. Data reviewers observed that in one area covering several acres, scan and sample measurements did not correlate. In some locations, scans indicated near-background gamma count rates while soil samples yielded several times the decommissioning criteria. At other locations, gamma count rates were elevated, but samples yielded background concentrations of thorium. Gamma scans tended to correlate with gamma exposure rate measurements. The lack of correlation between scan and sample data threatened to invalidate the characterization methodology, because neither method demonstrated reliability in identifying material which required excavation, shipment, and disposal. The NRC-approved site decommissioning plan required the excavation of any material that exceeded the Criteria based on either measurement. It was necessary to resolve the differences between the various types of measurements. Health Physics technicians selected 27 locations where the relationship between scan measurements and sample counts was highly variable. To determine if 'shine' was creating this data-correlation problem, they returned to those 27 locations to collect gamma count rates with a lead shielded NaI detector. Figure 2 shows that the shielded and unshielded count rates correlated fairly well for those locations. However, the technicians also noted the presence of 'tar balls' in this area. These small chunks of tarry material typically varied in size from 2 - 10 mm in diameters. Thorium-contaminated tars had apparently been disked into the soil to biodegrade the tar. The technicians evaluated the samples, and determined that the samples yielding higher activity contained more tar balls, and the samples yielding near background levels had fewer or none. The tar was collected for analysis, and its thorium activity varied from 2 - 3 Bq/g (60 - 90 pCi/g) total thorium. Since the sample mass was small, these small tar balls greatly impacted the sample activity. Technicians determined that the maximum particle size was less than 20 mm in diameter. Based on this maximum 'particle size', over one kilogram of sample would be required to minimize the impact of the tar balls on sample results. They returned to the same 27 locations and collected soil samples containing at least one kilogram of material. The samples were thoroughly ground and blended. Aliquots were then counted using 25-gram sample bottles, as in the initial characterization effort. Figure 3 shows the significantly improved correlation between counts per minute (using the original unshielded detector measurements) and soil sample results. Licensed material is not always homogeneously distributed in environmental media. When licensed material becomes concentrated in a particular material type, such as fine-grained soil or (as was the case at this site) hydrocarbon contaminated material, large blended samples may be required to provide adequate correlation between in-situ measurements, such as gamma scans, and sample activity. Sample size should be sufficiently large to yield a sample truly representative of the soil being surveyed, and should be thoroughly blended to ensure homogeneous distribution of the licensed material in the aliquot being analyzed. If blending is not practical, the entire sample should be counted in aliquots, and the average activity should be used as the true volumetric activity of the material being surveyed.

54 ENVIRONMENTAL SCIENCES↗

Risk-Based Remediation Approach for Cs-137 Contaminated Sediment/Soils at the Savannah River Site (SRS) Lower Three Runs Tail (U) - 13348 - SRNS-RP-2012-00546

Lower Three Runs is a large blackwater stream that runs through the eastern and southern portion of the Savannah River Site. The Lower Three Runs watershed includes two SRS facility areas: P Area (P Reactor) and R Area (R Reactor) that provided effluent discharges to Lower Three Runs. During reactor operations, effluent discharges were well above natural (pre-industrial) or present day stream discharges. The watershed contains a 2,500-acre mainstream impoundment (PAR Pond), several smaller pre-cooler ponds, and a canal system that connects the pre-cooler ponds and discharges surface water to PAR Pond. From the PAR Pond dam, Lower Three Runs flows approximately 36 kilometers braiding through bottom-land/flood-plain forests before it enters the Savannah River. About eight kilometers downstream from the PAR Pond dam, the SRS boundary narrows (termed the Lower Three Runs tail) providing a limited buffer of DOE property for the Lower Three Runs stream and associated flood-plain. Previous screening characterization efforts revealed Cs-137 contamination in the sediment/soils of the flood-plain. As a part of the American Recovery and Reinvestment Act stimulus package, a comprehensive characterization effort was executed on the sediment/soils of the Lower Three Runs tail flood-plain providing a comprehensive look at the contaminant signature of the area. As a follow-up to that characterization, a regulatory decision Core Team, comprised of members of the South Carolina Department of Health and Environmental Control, Environmental Protection Agency - Region IV, and DOE, conducted negotiations on a risk-based approach to address the level of contamination found in the tail flood-plain as an early action that provided a long-term solution to exposure scenarios. For evaluation purposes, the adolescent trespasser was selected as the most likely human receptor for the Lower Three Runs tail portion because of the natural attractiveness of the area for recreational activities (i.e., hunting, fishing, hiking etc.) and access from public property. Exposure of the adolescent trespasser to Cs-137 contaminated sediment/soil at concentrations greater than 23.7 pico curies per gram have been calculated to result in an unacceptable cancer risk (> 1 x 10{sup -4}). Comparing the characterization sampling results conducted in 2009 with the benchmark concentration of 23.7 pCi/g, identified elevated risk levels along three sampling areas in the Lower Three Runs tail portion. On January 5, 2012, it was agreed by the core team that a Removal Action in the Lower Three Runs tail was to be conducted for the identified soil/sediment locations in the three identified areas that exceed the 1 x 10{sup -4} risk (23.7 pCi/g) for the adolescent trespasser receptor. The addition of Land Use Controls following the Removal Action was appropriate to protect human health and the environment. A systematic screening matrix was initiated at the identified hot spots (i.e., sampling points with Cs-137 activities greater than 23.7 pCi/g) to identify the limits of the excavation area. Sediment/soil within the defined removal areas would be excavated to the depth necessary to achieve the cleanup goal and disposed of in a CERCLA Off-Site Rule approved disposal facility. It was agreed that this removal action would adequately reduce the volume of available Cs-137 in the Lower Three Runs tail and consequently residual activities of the Cs-137 would decay over time reducing the amount of Cs-137 available in the tail which would curtail risk. The Land Use Controls consist of installation of an additional seven miles of fencing at major road crossings, utility easements, and at areas that showed a higher probability of access. In addition, signs were placed along the entire SRS perimeter of the Lower Three Runs tail approximately every 200 feet. Sign posts included both a No Trespassing sign and a Contaminant Warning sign. The project initiated a subcontract for both the removal action and the installation of fencing and signs on May 1, 2012. All field activities were completed by July 26, 2012. The project excavated and disposed of over 2700 cubic yards of contaminated sediment/soil, erected approximately seven miles of fence and placed over 2,000 signs demonstrating DOE's commitment to protect human health and act as a good neighbor to residents in the area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Form work of the KNK Reactor - 13425

The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase a practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground surface and the creek and ponds in the HDSR. The first of the PRBs will be installed immediately up-gradient of the wet discharge area approximately 50 m from the creek, the other two will be installed across the area of shallow soil replacement, and all will extend from ground surface to the base of the water table aquifer through which the impacted groundwater flows. The PRBs have been designed to provide the removal of uranium and arsenic for decades, although the capacity of the treatment mixture for contaminant removal suggests that a longer period of treatment may be feasible. The environmental management plan includes an allowance for on-going monitoring, and replacement of a PRB(s) as might be required. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Architecture and Layout for the Belgian High-Level and Long-Lived Intermediate-Level Radioactive Waste Disposal Facility- 12116

The underground architecture and layout of the proposed Belgian high-level (HLW) and long-lived, intermediate-level radioactive wastes (ILW-LL) disposal system (repository) is mainly based on lessons learned during the development and 30-year-long operation of an underground research laboratory (URL) ('HADES') located adjacent to the city of Mol at a depth of 225 m in a 100-m-thick, Tertiary clay formation; the Boom clay. The following main operational and safety challenges are addressed in the proposed architecture and layout: 1. Following excavation, the underground openings needed to be promptly supported to minimize the extent of the excavation damaged zone (EDZ). 2. The size and unsupported stand-up time at tunnel crossings/intersections also needed to be minimized to minimize the extent of the related EDZ. 3. Steel components had to be minimized to limit the related long-term (post-closure) corrosion and hydrogen production. 4. The shafts and all equipment had to go down through a 180-m-thick aquifer and handle up to 65-Ton payloads. 5. The shaft seals had to be placed in the underlying clay layer. The currently proposed layout minimizes the excavated volume based on strict long-term-safety criteria and optimizes operational safety. Operational safety is further enhanced by a remote-controlled waste-package-handling system transporting the waste packages from their respective surface location down to their respective disposal location with no intermediate operation. The related on-site preparation and thenceforth use of cement-based, waste package- transportation containers are integral operational-safety components. In addition to strengthening the waste packages and providing radiation protection, these containers also provide long-term corrosion protection of the internal 'primary' steel packages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience in Remote Demolition of the Activated Biological Shielding of the Multi Purpose Research Reactor (MZFR) on the German Karlsruhe Site - 12208

In 2009, WAK Decommissioning and Waste Management GmbH (WAK) became owner and operator of the waste treatment facilities of Karlsruhe Institute of Technology (KIT) as well as of the prototype reactors, the Compact Sodium-Cooled Fast Reactor (KNK) and Multi-Purpose Reactor (MZFR), both being in an advanced stage of dismantling. Together with the dismantling and decontamination activities of the former WAK reprocessing facility since 1990, the envisaged demolishing of the R and D reactor FR2 and a hot cell facility, all governmentally funded nuclear decommissioning projects on the Karlsruhe site are concentrated under the WAK management. The small space typical of prototype research reactors represented a challenge also during the last phase of activated dismantling, dismantling of the activated biological shield of the MZFR. Successful demolition of the biological shield required detailed planning and extensive testing in the years before. In view of the limited space and the ambient dose rate that was too high for manual work, it was required to find a tool carrier system to take up and control various demolition and dismantling tools in a remote manner. The strategy formulated in the concept of dismantling the biological shield by means of a modified electro-hydraulic demolition excavator in an adaptable working scaffolding turned out to be feasible. The following boundary conditions were essential: - Remote exchange of the dismantling and removal tools in smallest space. - Positioning of various supply facilities on the working platform. - Avoiding of interfering edges. - Optimization of mass flow (removal of the dismantled mass from the working area). - Maintenance in the surroundings of the dismantling area (in the controlled area). - Testing and qualification of the facilities and training of the staff. Both the dismantling technique chosen and the proceeding selected proved to be successful. Using various designs of universal cutters developed on the basis of wall saws, both the activated steel liner and the inner reinforcing layer were cut remotely in one process. This allowed for the efficient execution of the following remote concrete removal steps using mining techniques. The electro-hydraulic demolition excavator that was purchased and then modified turned out to be an ideal tool carrier system with rapid-exchange coupling. Due to the high availability, no major delays occurred. This also was a result of the consistently implemented maintenance and repair concept. With the excavator installed in a modifiable scaffolding suspended from a rotating carrier ring, all dismantling areas could be reached and treated in spite of the small space. Thanks to an optimum organization of work-flows, routine change of dismantling work, and maintenance or repair, the iterative radiological measurement campaigns could be integrated in the whole activity without the dismantling work being disturbed significantly. The ventilation system with pressure grading and pre-filtration units ensured a low contamination level in the dismantling area. It was also possible to manage the dust formed by the milling of concrete surfaces. As it was possible to further cut metal parts and crushed concrete later on, residue flows were optimized. The planned overall period for testing, dismantling the bio-shield and removing the equipment was 36 months. The final duration was 39 months. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Construction Planning for the Bulgarian Low and Short-Lived Intermediate Level Radioactive Waste Repository - 16159

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived inter-mediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). This paper presents an update on construction planning activities that were originally presented at the 2015 Waste Management Conference. The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million m{sup 3} of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. The cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as the massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for the completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are ac-counted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Angle Remediation of Legacy Mercury Contaminated Soil at LANL - 16276

Mercury contaminated soil was left behind by The Manhattan Project and early Cold War era operations at Los Alamos National Laboratory (LANL) in Los Alamos, NM. TerranearPMC (TPMC) was the subcontractor that successfully completed this high-angle, legacy cleanup project on a steep, difficult-to-access canyon wall in Upper Los Alamos Canyon Aggregate Area south of a busy shopping center parking lot. A Menzi Muck (spider excavator) was used in concert with a high capacity telescoping crane to remove approximately 158 cubic yards of contaminated rock and soil from the steep slope. The crane was also used to safely move personnel and equipment into and off of the site, as well as to retrieve packaged waste. All soil excavated from the site was containerised in soft-sided 1.77 cubic yard IP-1 containers and shipped to an approved, licensed, off-site disposal facility. Once excavation was completed, sampling confirmed that human health concerns and environmental risk issues had been mitigated. This proven technical approach will become the preferred method for cleaning up other similar, difficult-to access/steep legacy waste sites across the Upper Los Alamos Canyon Aggregate Area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Recovery at Former Lithium Production Site at the Miramas in France - 18529

The former Lithium production facility located at Miramas in the South-East of France recently completed a 10-year program of process equipment removal, building demolition and soil remediation to recover mercury (Hg) that had been lost during operations at the site. After over 100 years ago chemical production, all production activities stopped in 2009, and immediately afterwards the clean-up project began. The main project focused on the demolition of all facilities and the decontamination of building materials and soil clean-up, with the goal of remediating the site for future industrial purposes. Prior to starting the decommissioning and clean-up work at the site a detailed site survey was conducted to identify the extent of the contamination of the site. After investigations into available technologies, the decision was made to install on-site treatment processes. This resulted in fewer residual environmental effects (trucking pollution, shipping containers, volume of materials, etc), a reduction in logistic complications, and, importantly, was cost effective compared to sending all untreated material to external processing facilities. This decision resulted in a need to optimize demolition waste management, while ensuring the highest clean-up and safety levels. A variety of treatment processes were investigated and compared and two technologies were finally selected and implemented. The first process was a 'thermal desorption unit (TDU),' which heated excavated soils and captured the vaporized mercury. The second was a washing process that was used to remove surface contamination. After the contaminated areas were excavated, materials were crushed, screened and sorted into different sizes, with each pile being routed to the appropriate process. The smaller-sized particles were treated in the TDU. A batch of around 12 MT was fed into a moisture evaporator and then into a mercury evaporator. The soils were then cooled, sampled to ensure no residual Hg contamination before being mixed with a binding agent, and returned to the excavation site. Larger materials with surface contamination were washed to remove the contamination. The liquid effluents were sent to a tank where the contaminated fines were removed, dried, pressed and sent for processing. If the washed, coarse materials failed to reach acceptable mercury levels, they were crushed again and sent to be treated in the TDU. The washing fluid was recycled for the next batch. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Verification for the Remediation of LLRW at the Port Granby Project - 19210

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) that Canadian Nuclear Laboratory (CNL) is using to manage long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure and excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) which accepted waste until the 1980's to the newly constructed LTWMF. The PGWMF contains an estimated 450,000 cubic meters of LLRW deposited in unmarked and unlined trenches throughout the southern portion of the site that borders Lake Ontario. Project requirements include excavating contaminated material, verifying that the trench bottoms are below action levels using Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance, and final restoration. This paper describes challenges of meeting remediation verification requirements using traditional field and laboratory confirmation methods in areas of deep trench areas located in rugged terrain with ponded water and mud and presents a process that has expedited the traditional MARSSIM method for verification with greater productivity, and with enhanced safety and reliability as compared to the use of traditional methods alone. This enhanced process has been successfully employed for in-situ verification so that the excavated area can be backfilled and returned to a vegetative state. This enhanced process has been examined by federal regulatory staff through the course of their onsite audits and outcomes from these examinations have all been positive. The method involves a visual inspection and traditional walkover of the area to identify any areas with radiation measurements above the region's background followed by a full area survey performed using Wood's proprietary Orion ScanPlotSM system. The ScanPlotSM data is evaluated, mapped and overlaid on top of an aerial image of the surveyed area allowing remaining radiological material at surface or near surface to be quickly and easily identified for removal. Field staff then collect soil samples from evenly distributed points within the surveyed area and field screen the samples using an X-ray fluorescence (XRF) analysis for the three primary contaminates of potential concern (CoPCs) (arsenic, uranium and lead) that are indicative of the historical contamination. Samples passing XRF field screening are packaged and sent to a local laboratory for a full suite of analyses and checked against the CoPC list to assess whether the soil matches the profile for nearby native soils and passes the remediation goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Challenges at the L-Bar Disposal Site - 19561

The L-Bar, New Mexico, Disposal Site is located in the northeast corner of Cibola County, 10 miles north of Laguna, and was the former site of a uranium mill and underground mine. The mill operated from 1977 to 1981 where a total of 1.9 x 10{sup 6} tonnes (2.1 million tons) of ore was processed. Solid and liquid byproduct, or tailings, from the milling process were impounded behind a dam constructed of native weathered Mancos Shale, which is a predominant geologic formation in the area. The tailings were encapsulated in place, and the resulting 40.5-hectare (100-acre) engineered disposal cell was completed in 2000. The 299-hectare (738-acre) Uranium Mill Tailings Radiation Control Act Title II site was transferred to the US Department of Energy (DOE) Office of Legacy Management under a US Nuclear Regulatory Commission general license in 2004. During reclamation activities, channels were designed and constructed into the surrounding weathered shale to protect the disposal cell from high-precipitation events. Due to the highly erodible soils and anticipated sediment deposition into the diversion channels, a sediment trap was also excavated. By excavating the channels and sediment trap, the local base elevation was altered, which exacerbated erosional forces. Recontouring surrounding drainage basins during the reclamation activities also promoted erosion by reducing natural rock armoring and vegetation that aids in soil stability. To compound the erosion issue, the L-Bar site is susceptible to short-duration, high-intensity, localized convective storms. Because the local geomorphology includes soils consisting of weathered shale, these precipitation events are not conducive to absorption into the soils, but rather to sheet flows that follow topography and concentrate in lower elevation areas where flow volumes and velocities increase. These factors result in the formation of deeply incised gullies and promote soil piping, which is an important geomorphic process in the widening of arroyos and the advancement of head-cutting, evident at the L-Bar site and surrounding areas. At the first annual inspection by DOE in 2005, it was noted that extensive erosion was occurring upgradient of the sediment trap. DOE determined that the design of the site's drainage system was the cause of extensive erosion. It is believed that by lowering the base elevation of the local drainage system through excavation of the sediment trap, the geomorphic response common to fluvial systems in a semiarid environment has increased the incision and remobilization of sediment downstream. Over time, these sediments would be deposited in the channels, which are designed to divert runoff away from the disposal cell, effectively limiting their capacities. The development of alluvial fans on one side of the channel directs flows to the opposite side of the channel, presenting the risk of cutting into the side slopes of the disposal cell. In addition, the upstream migrating gullies could intersect access roads and create hazards for adjacent stakeholders, including their grazing livestock. Current estimates conclude that potential offsite impacts could occur within the next 20 years, with gully migrations of up to 19 meters (63 feet) per year. In 2009, several erosion-control structures were constructed to reduce runoff velocities and ease the elevation differential created by the construction of the sediment trap and diversion channels. The first measurable storm events after construction occurred in August and September 2011, where one structure washed out and another structure was bypassed when runoff breached an earthen berm. DOE has conducted site assessments, continues to monitor erosion, and has applied lessons learned in the process of evaluating options to repair or modify the structures to stabilize the site and prevent potential short-term damage to adjacent properties as well as long-term damage to the disposal cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Landfill mining: A critical review of two decades of research

Highlights: Black-Right-Pointing-Pointer We analyze two decades of landfill mining research regarding trends and topics. Black-Right-Pointing-Pointer So far landfill mining has mainly been used to solve waste management issues. Black-Right-Pointing-Pointer A new perspective on landfills as resource reservoirs is emerging. Black-Right-Pointing-Pointer The potential of resource extraction from landfills is significant. Black-Right-Pointing-Pointer We outline several key challenges for realization of resource extraction from landfills. - Abstract: Landfills have historically been seen as the ultimate solution for storing waste at minimum cost. It is now a well-known fact that such deposits have related implications such as long-term methane emissions, local pollution concerns, settling issues and limitations on urban development. Landfill mining has been suggested as a strategy to address such problems, and in principle means the excavation, processing, treatment and/or recycling of deposited materials. This study involves a literature review on landfill mining covering a meta-analysis of the main trends, objectives, topics and findings in 39 research papers published during the period 1988-2008. The results show that, so far, landfill mining has primarily been seen as a way to solve traditional management issues related to landfills such as lack of landfill space and local pollution concerns. Although most initiatives have involved some recovery of deposited resources, mainly cover soil and in some cases waste fuel, recycling efforts have often been largely secondary. Typically, simple soil excavation and screening equipment have therefore been applied, often demonstrating moderate performance in obtaining marketable recyclables. Several worldwide changes and recent research findings indicate the emergence of a new perspective on landfills as reservoirs for resource extraction. Although the potential of this approach appears significant, it is argued that facilitating implementation involves a number of research challenges in terms of technology innovation, clarifying the conditions for realization and developing standardized frameworks for evaluating economic and environmental performance from a systems perspective. In order to address these challenges, a combination of applied and theoretical research is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavatability Assessment of Weathered Sedimentary Rock Mass Using Seismic Velocity Method

Seismic refraction method is one of the most popular methods in assessing surface excavation. The main objective of the seismic data acquisition is to delineate the subsurface into velocity profiles as different velocity can be correlated to identify different materials. The physical principal used for the determination of excavatability is that seismic waves travel faster through denser material as compared to less consolidated material. In general, a lower velocity indicates material that is soft and a higher velocity indicates more difficult to be excavated. However, a few researchers have noted that seismic velocity method alone does not correlate well with the excavatability of the material. In this study, a seismic velocity method was used in Nusajaya, Johor to assess the accuracy of this seismic velocity method with excavatability of the weathered sedimentary rock mass. A direct ripping run by monitoring the actual production of ripping has been employed at later stage and compared to the ripper manufacturer's recommendation. This paper presents the findings of the seismic velocity tests in weathered sedimentary area. The reliability of using this method with the actual rippability trials is also presented.

58 GEOSCIENCES↗