Air Pathway Dose Modeling for the E-Area Low-Level Waste Facility

The US Department of Energy (DOE) Order 435.1 performance assessment (PA) process (USDOE 1999) prescribes a performance objective (10 mrem y -1 ) for evaluating atmospheric releases of radionuclides from DOE low-level waste (LLW) disposal facilities. The potential dose to an individual from exposure to radionuclides released into the atmosphere from LLW disposals can be estimated by application of radionuclide-specific dose-release factors (DRFs) (mrem Ci -1 ) to estimated flux rates (Ci y -1 ) at a particular time and location. In Revision 0 of this report, Lee (2006) calculated DRFs for potential atmospheric releases of 15 volatile radionuclides from seven ELLWF disposal units in support of the 2008 ELLWF PA (WSRC 2008). The mainframe version of the US Environmental Protection Agency’s (EPA) dose model CAP88 was used in the Revision 0 assessment. In Revision 1 of this report (Dixon and Minter 2017), the site-specific Savannah River National Laboratory (SRNL) atmospheric dose models MAXDOSE-SR version 2013 (Stone and Jannik 2013a) and MAXINE version 2017 (Bell 2017) were used to calculate DRFs for ten radionuclides. Revision 2 provided updated DRFs using the current version of the US Environmental Protection Agency’s (EPA) dose model CAP88-PC Version 4.1. After Revision 2 was finalized, DRFs were requested for Ar-37, Ar-39, Kr-83m, and Hg-206. Revision 3 provides the additional DRFs calculated using the same methods as used in Revision 2 of this document. The method for estimating new DRFs for the ELLWF disposal units is described in this report.

61 RADIATION PROTECTION AND DOSIMETRY↗

Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers

Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GUIDANCE FOR THE PROPER CHARACTERIZATION AND CLASSIFICATION OF LOW SPECIFIC ACTIVITY MATERIALS AND SURFACE CONTAMINATED OBJECTS FOR DISPOSAL

Regulatory concerns over the proper characterization of certain waste streams led CH2M HILL Plateau Remediation Company (CHPRC) to develop written guidance for personnel involved in Decontamination & Decommissioning (D&D) activities, facility management and Waste Management Representatives (WMRs) involved in the designation of wastes for disposal on and off the Hanford Site. It is essential that these waste streams regularly encountered in D&D operations are properly designated, characterized and classified prior to shipment to a Treatment, Storage or Disposal Facility (TSDF). Shipments of waste determined by the classification process as Low Specific Activity (LSA) or Surface Contaminated Objects (SCO) must also be compliant with all applicable U.S. Department of Transportation (DOE) regulations as well as Department of Energy (DOE) orders. The compliant shipment of these waste commodities is critical to the Hanford Central Plateau cleanup mission. Due to previous problems and concerns from DOE assessments, CHPRC internal critiques as well as DOT, a management decision was made to develop written guidance and procedures to assist CHPRC shippers and facility personnel in the proper classification of D&D waste materials as either LSA or SCO. The guidance provides a uniform methodology for the collection and documentation required to effectively characterize, classify and identify candidate materials for shipping operations. A primary focus is to ensure that waste materials generated from D&D and facility operations are compliant with the DOT regulations when packaged for shipment. At times this can be difficult as the current DOT regulations relative to the shipment of LSA and SCO materials are often not clear to waste generators. Guidance is often sought from NUREG 1608/RAMREG-003 [3]: a guidance document that was jointly developed by the DOT and the Nuclear Regulatory Commission (NRC) and published in 1998. However, NUREG 1608 [3] is now thirteen years old and requires updating to comply with the newer DOT regulations. Similar challenges present themselves throughout the nuclear industry in both commercial and government operations and therefore, this is not only a Hanford Site problem. Shipping radioactive wastes as either LSA or SCO rather than repacking it is significantly cheaper than other DOT radioactive materials shipping classifications particularly when the cost of packages is included. Additionally, the need to 'repackage' materials for transport can often increase worker exposure, necessitated by 'repackaging' waste materials into DOT 7 A Type A containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Material Management Database Development at the Nevada National Security Site

The Nuclear Material Management & Storage (NMM&S) program at the Nevada National Security Site (NNSS) have the responsibility for the life-cycle management of accountable nuclear materials (NM) in accordance with Department of Energy (DOE) Order 410.2, “Management of Nuclear Materials” and for ensuring workers are protected from exposure to nuclear materials stored outside of an authorized shipping package under DOE Manual 441.1-1. To ensure these responsibilities were addressed in an effective, concise, and secure manner the development of NMM&S databases was undertaken. Using the existing database server structure and data acquired from the official Material Control & Accountability (MC&A) accounting program development of two separate applications, one for O 410.2 inventory requirements (NMIA) and one for M441, were begun in September 2015. The databases were deployed onto the production server in January 2017. The inventory database allows for entering NM characterization data, production of O 410.2 reports, and the ability to retain history files. The M441 database screens NM to determine if it is subject to the manual's requirements, ability to pull in unclassified RadCon materials, and provide reports as required by NMM&S, NM owners, and headquarters programs. These two databases provide NMM&S the ability to better ensure safe and secure packaging, storage, stabilization, consolidation, or disposition of NM and achieve life-cycle management goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of US DOE Performance Assessments Over 20 Years - 13597

Performance assessments (PAs) have been used for many years for the analysis of post-closure hazards associated with a radioactive waste disposal facility and to provide a reasonable expectation of the ability of the site and facility design to meet objectives for the protection of members of the public and the environment. The use of PA to support decision-making for LLW disposal facilities has been mandated in United States Department of Energy (US DOE) directives governing radioactive waste management since 1988 (currently DOE Order 435.1, Radioactive Waste Management). Prior to that time, PAs were also used in a less formal role. Over the past 20+ years, the US DOE approach to conduct, review and apply PAs has evolved into an efficient, rigorous and mature process that includes specific requirements for continuous improvement and independent reviews. The PA process has evolved through refinement of a graded and iterative approach designed to help focus efforts on those aspects of the problem expected to have the greatest influence on the decision being made. Many of the evolutionary changes to the PA process are linked to the refinement of the PA maintenance concept that has proven to be an important element of US DOE PA requirements in the context of supporting decision-making for safe disposal of LLW. The PA maintenance concept is central to the evolution of the graded and iterative philosophy and has helped to drive the evolution of PAs from a deterministic compliance calculation into a systematic approach that helps to focus on critical aspects of the disposal system in a manner designed to provide a more informed basis for decision-making throughout the life of a disposal facility (e.g., monitoring, research and testing, waste acceptance criteria, design improvements, data collection, model refinements). A significant evolution in PA modeling has been associated with improved use of uncertainty and sensitivity analysis techniques to support efficient implementation of the graded and iterative approach. Rather than attempt to exactly predict the migration of radionuclides in a disposal unit, the best PAs have evolved into tools that provide a range of results to guide decision-makers in planning the most efficient, cost effective, and safe disposal of radionuclides. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Certification Assurance Process Tracking System

Without the use of an electronic system for managing activities to achieve and certify operational readiness, the effort to complete required elements of DOE Order 425.1 for large projects would be overwhelming. RCAPTS (Readiness Certification Assurance Process Tracking System) is a web-based software tool which helps manage Contractor or DOE Readiness Reviews. The RCA process and this software package is used at several DOE sites to plan, execute, and validate readiness of high-risk facilities and systems. The primary aim and value of RCAPTS is to promote accountability among project stakeholders, communicate expectations for the various elements of achieving operational readiness, and validate that requirements have been met, in a systematic way that flows with the project. At the end of a project, RCAPTS can provide an organized set of electronic evidence files for a follow-on readiness review team. The current software is recently updated to provide improved functionality, tailoring capability, and new user-friendly interface.

Cook, G. A.↗

Closeout report for statistics for environmental sampling

This Project Closure Report is the final project document required to complete the project record and to close the project in the office’s web-based project management system. This report is for use by senior management to assess major project outcomes and their impact, identify best practices and other useful insights for future projects, and identify any open issues meriting attention. In accordance with DOE Order 243.1B, Records Management Program, this report will be managed in accordance with all prescribed laws, regulations, directives, and processes to ensure adequate and proper documentation of DOE’s organizations, missions, functions, policies, and decisions (See 44 U.S.C., Chapters 21, 29, 31, 33, and 35; 36 CFR Subchapter B, Records Management, and all applicable National Archives and Records Administration (NARA) mandated guidance.

97 MATHEMATICS AND COMPUTING↗

EFCOG, IOSC Best Practices Guide

Members of the Energy Facility Contractors Group (EFCOG), Safeguards and Security Working Group, Information Security Sub-Working Group Incidents of Security Concern (IOSC) Team prepared this best practice guide. For the purposes of this guide, “best practices” are “positive examples of work processes, procedures, good ideas, or effective solutions. The team made up of IOSC Subject Matter Experts (SME) identified these best practices as a result of actual operational experience and training. The guide describes best practices for categorizing incidents and managing inquiries. These practices may serve as guidelines for developing program plans, policy and procedures. These practices are suggestions for Department sites to consider while working in the IOSC subject area. The authors acknowledge that there may be alternatives to the practices identified in this guide. Subject matter Experts from the IOSC program across the Department developed this guide. Extensive discussion and document reviews were conducted to identify best practices relating to security inquiries. It was not within the scope of this study to assess individual site performance or evaluate compliance. Department of Energy’s (DOE), Order 470.4B, Chg.2, Safeguards and Security Program, July-21-2011, Chg 2, January-17-2017, Attachment 5, Incidents of Security Concern, contains the requirements for the IOSC program. In accordance with DOE directives and requirements established by DOE/National Nuclear Security Administration (NNSA) oversight, the working group evaluated elements of the IOSC program at each of the working group member’s sites such as categorizing events, conducting inquiries, and reporting events. Inconsistencies in categorization across the sites may be due to various factors, including each local field office having different reporting expectations, subjectivity in making determinations, and potential inherent deficiencies in the categorization tables and category descriptions. Many sites have adopted a sub reportable category for a security anomaly event that it believes does not meet the criteria as a reportable IOSC. The sites typically establish a local standardized process for reporting, analyzing, and trending sub-reportable events. Security incident program managers may need to discuss inconsistent categorization with other Inquiry Officials (IO) and suggest standardized solutions (ie…through policy changes or a forum attended by incident program managers and inquiry officials to discuss standardization solutions. At least one EFCOG IOSC team member’s site is currently using the best practices identified in this guide.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ATR Spent Fuel Options Study

The Advanced Test Reactor (ATR) is a materials and fuels test nuclear reactor that performs irradiation services for the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Naval Reactors, the National Nuclear Security Administration (NNSA), and other research programs. ATR achieved initial criticality in 1967 and is expected to operate in support of needed missions until the year 2050 or beyond. It is anticipated that ATR will generate approximately 105 spent nuclear fuel (SNF) elements per year through the year 2050. Idaho National Laboratory (INL) currently stores 2,008 ATR SNF elements in dry storage, 976 in wet storage, and expects to have 1,000 elements in wet storage before January 2017. A capability gap exists at INL for long-term (greater than the year 2050) management, in compliance with the Idaho Settlement Agreement (ISA), of ATR SNF until a monitored retrievable geological repository is open. INL has significant wet and dry storage capabilities that are owned by the DOE Office of Environmental Management (EM) and operated and managed by Fluor Idaho, which include the Idaho Nuclear Technology and Engineering Center’s (INTEC’s) CPP-666, CPP-749, and CPP-603. In addition, INL has other capabilities owned by DOE-NE and operated and managed by Battelle Energy Alliance, LLC (BEA), which are located at the Materials and Fuel Complex (MFC). Additional storage capabilities are located on the INL Site at the Naval Reactors Facility (NRF). Current INL SNF management planning, as defined in the Fluor Idaho contract, shows INTEC dry fuel storage, which is currently used for ATR SNF, will be nearly full after transfer of an additional 1,000 ATR SNF from wet storage. DOE-NE tasked BEA with identifying and analyzing options that have the potential to fulfill this capability gap. BEA assembled a team comprised of SNF management experts from Fluor Idaho, Savannah River Site (SRS), INL/BEA, and the MITRE Corp with an objective of developing and analyzing options for fulfilling the capability gap. This management options analysis is not an alternatives analysis as defined by DOE Order 413.3B; rather, it is an evaluation of near-term, mid term and long-term actions needed to fulfill the capability gap. The actions are described in sufficient detail to inform stakeholders and DOE decision makers regarding a potential path forward. The recommended path forward will inform Fiscal Year 2019 budget formulation, support potential National Environmental Policy Act (NEPA) analyses, and may or may not include capital asset projects.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Panel Session 126: US and International Waste Classifications; Differences and Issues

The panel focused and addressed the existing US waste classification scheme set forth in US 10 CFR Part 61 and DOE Order 435.1 focusing upon the commensurate risk associated with the disposal of radioactive Low-Level (LLW) and High-Level Waste (HLW). The panel provided insights on the ongoing efforts by the NRC in conducting its Very LLW Scoping Study, the waste classification scheme used by the IAEA with a comparison of that system to the waste classification regulatory process in the US and the increasing role of RCRA sites in disposal of LLW in the US. The process used for very low activity waste disposal known as Bulk Survey for Release in the State of Tennessee was discussed as well as various studies conducted by EPRI addressing the relative risks of very low activity waste will be addressed. The panel strived to compare the risks of radioactive LLW and HLW to the operational process used for its disposal in the US and Internationally and determine if changes are needed in the process. The audience heard the perspectives from six panelists that addressed issues ranging from the technical basis used to establish the waste classification system specified in Title 10 of the Code of Federal Regulations (CFR) Part 61 developed by the Nuclear Regulatory Commission; the approaches and impacts for dispositioning materials with Very Low Levels of Radioactive Waste (VLLRW); approaches used by the Department of Energy (DOE) to disposition Low-Level Radioactive Waste (LLW) in accordance with Order 435.1; and methods adopted by the international community to classify and disposition LLW and Intermediate Level Waste (ILW). A summary of each of the presentations given by the panelists is provided herein. Presentations proposed include: 1 - U.S. Low-Level Radioactive Waste Classification System 10 CFR Part 61 - Basis, Updates, and Issues (Rateb (Boby) Abu Eid, US NRC (USA)); 2 - EPRI Research on the Technical Basis for VLLW Classification (Lisa Edwards, EPRI (USA)); 3 - Division of Radiological Health (Anthony Hogan, State of Tennessee (USA)); 4 - Perspectives on VLLW Based on EPA's Low Activity Waste Effort (Thomas Peake, US EPA (USA)); 5 - US Department of Energy Perspectives on Waste Classification (Justin Marble, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DARHT : Enduring Lessons from a Technical Project in a National Laboratory Context [Slides]

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility at Los Alamos National Laboratory (LANL) is the world’s first flash x-ray facility able to take multiple high-resolution radiographs of the interior features of fast-moving dense objects during a single experiment. DARHT’s radiography and complimentary diagnostics makes it an important diagnostic tool in support of the US Department of Energy’s (DOE)/National Nuclear Security Administration (NNSA)’s stewardship of the US nuclear deterrent. The project to construct DARHT ran from 1988 through 2003. Initial Operating Capability along a single axis began in 1999. A technical issue delayed Critical Decision 4 for the full dual-axis capability until 2008. DARHT was characterized by several directed changes resulting from an environmental impact study, changes to the global security context resulting from the end of underground nuclear testing, and rapid evolution of applicable technology. Conventional building and lab-space construction were part of the project, but the project was dominated by Special Facility Equipment that, together with the mission to support the nuclear weapons program, required the project to be completed by national laboratories. Although the project pre-dated implementation of DOE Order 413.3, several important lessons for national laboratory projects remain applicable today and will be discussed here, including projects appropriate for the national laboratory environment, scope stability, risk acceptance and mitigation, communication, and collaboration. Finally, considerations for DOE contractor project managers are offered based upon the DARHT experience.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Second Opinion is Worth the Cost - 12479

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Site Specific Reference Person Parameters and Derived Concentration Standards for the Savannah River Site

The purpose of this report is twofold. The first is to develop a set of behavioral parameters for a reference person specific for the Savannah River Site (SRS) such that the parameters can be used to determine dose to members of the public in compliance with Department of Energy (DOE) Order 458.1 “Radiation Protection of the Public and the Environment.” A reference person is a hypothetical, gender and age aggregation of human physical and physiological characteristics arrived at by international consensus for the purpose of standardizing radiation dose calculations. DOE O 458.1 states that compliance with the annual dose limit of 100 mrem (1 mSv) to a member of the public may be demonstrated by calculating the dose to the maximally exposed individual (MEI) or to a representative person. Historically, for dose compliance, SRS has used the MEI concept, which uses adult dose coefficients and adult male usage parameters. Beginning with the 2012 annual site environmental report, SRS will be using the representative person concept for dose compliance. The dose to a representative person will be based on 1) the SRS-specific reference person usage parameters at the 95th percentile of appropriate national or regional data, which are documented in this report, 2) the reference person (gender and age averaged) ingestion and inhalation dose coefficients provided in DOE Derived Concentration Technical Standard (DOE-STD-1196-2011), and 3) the external dose coefficients provided in the DC_PAK3 toolbox.

61 RADIATION PROTECTION AND DOSIMETRY↗

Panel Session 104: US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process

The US DOE Low-Level Waste Disposal Facility Federal Review Group (LFRG) as the regulatory authority for onsite low-level waste disposal facilities for the complex per DOE Order 435.1. This panel focused on the review process for technical basis documents including the Performance Assessments that are used to issue the disposal authorization statement Presentations proposed include: 1 - Low-Level Waste Disposal Overview (Jhon Carilli, US DOE EM Nevada (USA)); 2 - Factors Influencing Allowable Waste Concentrations and Inventories at Disposal Facilities (Roger Seitz, IEI (USA)); 3 - Low-Level Waste Disposal Facility Federal Review Group - LFRG (Jaffet Ferrer-Torres, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fire Protection Program Manual (Revision 3.0)

This manual documents the Lawrence Livermore National Laboratory (LLNL) Fire Protection Program. Department of Energy (DOE) Orders 420.1B, Facility Safety, requires LLNL to have a comprehensive and effective fire protection program that protects LLNL personnel and property, the public and the environment. The manual provides LLNL and its facilities with general information and guidance for meeting DOE 420.1B requirements. The recommended readers for this manual are: fire protection officers, fire protection engineers, fire fighters, facility managers, directorate assurance managers, facility coordinators, and ES and H team members.

99 GENERAL AND MISCELLANEOUS↗