Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Streamlining the Design Tradespace for Earth Imaging Constellations

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

The Aviation System Analysis Capability Air Carrier Cost-Benefit Model

To meet its objective of assisting the U.S. aviation industry with the technological challenges of the future, NASA must identify research areas that have the greatest potential for improving the operation of the air transportation system. Therefore, NASA is developing the ability to evaluate the potential impact of various advanced technologies. By thoroughly understanding the economic impact of advanced aviation technologies and by evaluating how the new technologies will be used in the integrated aviation system, NASA aims to balance its aeronautical research program and help speed the introduction of high-leverage technologies. To meet these objectives, NASA is building the Aviation System Analysis Capability (ASAC). NASA envisions ASAC primarily as a process for understanding and evaluating the impact of advanced aviation technologies on the U.S. economy. ASAC consists of a diverse collection of models and databases used by analysts and other individuals from the public and private sectors brought together to work on issues of common interest to organizations in the aviation community. ASAC also will be a resource available to the aviation community to analyze; inform; and assist scientists, engineers, analysts, and program managers in their daily work. The ASAC differs from previous NASA modeling efforts in that the economic behavior of buyers and sellers in the air transportation and aviation industries is central to its conception. Commercial air carriers, in particular, are an important stakeholder in this community. Therefore, to fully evaluate the implications of advanced aviation technologies, ASAC requires a flexible financial analysis tool that credibly links the technology of flight with the financial performance of commercial air carriers. By linking technical and financial information, NASA ensures that its technology programs will continue to benefit the user community. In addition, the analysis tool must be capable of being incorporated into the wide-ranging suite of economic and technical models that comprise ASAC. This report describes an Air Carrier Cost-Benefit Model (CBM) that meets these requirements. The ASAC CBM is distinguished from many of the aviation cost-benefit models by its exclusive focus on commercial air carriers. The model considers such benefit categories as time and fuel savings, utilization opportunities, reliability and capacity enhancements, and safety and security improvements. The model distinguishes between benefits that are predictable and those that occur randomly. By making such a distinction, the model captures the ability of air carriers to reoptimize scheduling and crew assignments for predictable benefits. In addition, the model incorporates a life-cycle cost module for new technology, which applies the costs of nonrecurring acquisitions, recurring maintenance and operation, and training to each aircraft equipment type independently.

Gaier, Eric M.↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

GEOPHIRES v2.0

GEOPHIRES v2.0 is a geothermal techno-economic simulation tool upgraded from GEOPHIRES v1.2. The name stands for "GEOthermal energy for Production of Heat and electricity (“IR”) Economically Simulated". GEOPHIRES combines reservoir, wellbore, and surface plant technical models with cost correlations and levelized cost models to estimate the capital and operation and maintenance costs, instantaneous and lifetime energy production, and overall levelized cost of energy of a geothermal plant. In addition to electricity generation, direct-use heat applications and combined heat and power or cogeneration can be modeled. Various upgrades have been implemented to develop GEOPHIRES v2.0, including: updating the built-in cost correlations, coupling to the external reservoir simulator TOUGH2, enhancing the built-in wellbore simulator, converting the programming language to Python, and making the code open-source. Users are encouraged to build upon the tool, e.g. by implementing their own correlations or coupling to other simulators.

Beckers, Koenraad↗

Optimized Carbon Fiber Composites in Wind Turbine Blade Design: Follow-On Studies

This project has identified opportunities to bring further reductions in the mass and cost of modern wind turbine blades through the use of alternative material systems and manufacturing processes. The fiber reinforced polymer material systems currently used by the wind industry have stagnated as the technology continues to mature and as a means to reduce risk while introducing new products with continually increasing blade lengths. However, as blade lengths continue to increase, the challenge of controlling blade mass becomes even more critical to enabling the associated levelized cost of energy reductions. Stiffer and stronger reinforcement fibers can help to resolve the challenges of meeting the loading demands while limiting the increase in weight, but these materials are substantially more expensive than the traditional E-glass fiber systems. One goal of this project and associated work is to identify pathways that improve the cost-effectiveness of carbon fiber such that it is the reinforcement of choice in the primary structural elements of wind blades. The use of heavy-tow textile carbon fiber material systems has been shown to reduce the blade mass by 30-31% when used in the spar cap and by up to 7% when used in edgewise reinforcement. A pultrusion cost model was developed to enable a material cost comparison that includes an accurate estimate of the intermediate manufacturing step of pultrusion for the carbon fiber composite. Material cost reductions were revealed in most cases for the heavy-tow textile carbon fiber compared to infused fiberglass. The use of carbon fiber in the edgewise reinforcement produced the most notable material cost reduction of 33% for the heavy-tow textile carbon fiber. The mass and cost savings observed when using carbon fiber in edgewise reinforcement demonstrate a clear opportunity of this design approach. A carbon fiber conversion cost model was expanded to include a characterization of manufacturing costs when using advanced conversion processes with atmospheric plasma oxidation. This manufacturing approach was estimated to reduce the cost of carbon fiber material systems by greater than 10% and can be used with textile carbon systems or traditional carbon fiber precursors. The pultrusion cost model was also used to assess the opportunity for using pultruded fiberglass in wind blades, studying conventional E-glass fiber reinforcement. When using pultruded fiberglass as the spar cap material for two design classifications, the blade weight was reduced by 6% and 9% compared to infused fiberglass. However, due to the relatively large share of the pultrusion manufacturing cost compared to fiber cost, the spar cap material cost increased by 12% and 7%. When considering the system benefits of reduced blade mass and potentially lower blade manufacturing costs for pultruded composites, there may be opportunity for pultruded E-glass in wind blade spar caps, but further studies are needed. There is a clearer outcome for using pultruded fiberglass in the edgewise reinforcement where it resulted in a blade mass reduction of 2% and associated reinforcement material cost reduction of 1% compared to infused E-glass. The use of higher performing glass fibers, such as S-glass and H-glass systems, will produce greater mass savings but a study is needed to assess the cost implications for these more expensive systems. The most likely opportunity for these high-performance glass fibers is in the edgewise reinforcement, where the increased strength will reduce the damage accumulation of this fatigue-driven component. The blade design assessments in this project characterize the controlling material properties for the primary structural components in the flapwise and edgewise directions for modern wind blades. The observed trends with low and high wind speed turbine classifications for carbon and glass fiber reinforced polymer systems help to identify where cost reductions are needed, and where improvements in mechanical properties would help to reduce the material demands.

17 WIND ENERGY↗

Characterizing and Modeling the Cost of Rework in a Library of Reusable Software Components

In this paper we characterize and model the cost of rework in a Component Factory (CF) organization. A CF is responsible for developing and packaging reusable software components. Data was collected on corrective maintenance activities for the Generalized Support Software reuse asset library located at the Flight Dynamics Division of NASA's GSFC. We then constructed a predictive model of the cost of rework using the C4.5 system for generating a logical classification model. The predictor variables for the model are measures of internal software product attributes. The model demonstrates good prediction accuracy, and can be used by managers to allocate resources for corrective maintenance activities. Furthermore, we used the model to generate proscriptive coding guidelines to improve programming, practices so that the cost of rework can be reduced in the future. The general approach we have used is applicable to other environments.

Basili, Victor R.↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

NETL’s Techno-Economic Models for Assessing CO2 Pipeline Transport and Geologic Storage

Presentation at Society of Petroleum Engineers (SPE) Workshop: Future Energy Roadmap – Navigating Through the Energy Transition, held in Galveston, Texas, August 22-23, 2022. The presentation provides an overview of the techno-economic models NETL has developed for assessing performance characteristics and cost drivers for CO2 pipeline transport (FECM/NETL CO2 Transport Cost Model or CO2_T_COM), CO2 saline storage (FECM/NETL CO2 Saline Storage Cost Model or CO2_S_COM), and oil production and CO2 storage using CO2 enhanced oil recovery (EOR) (FE/NETL CO2 Prophet Model or CO2_Prophet and FE/NETL Onshore CO2 EOR Cost Model or CO2_E_COM). A high-level description of each model is presented along with useful outputs that can be generated with each model. These tools can be used individually to evaluate the economic opportunity for specific CCUS components, or they can be used in tandem to assess an integrated CCUS value chain.

Morgan, David↗

Technical Assistance in Fabrication and Testing of MEAs: Cooperative Research and Development Final Report

Altergy's fuel cell cost is highly dependent on expensive purchased membrane electrode assemblies (MEAs), which amount to 42¢/watt in a 5kW system. In order to better compete with other power solutions, the company has identified an MEA breakthrough cost of 20¢/watt to unlock new, major markets for its fuel cell products. Since Altergy presently does not have an accurate cost model for the real costs of these MEAs, it is difficult to know whether the company goal is achievable. Altergy seeks to leverage NREL expertise to reduce cost and improve performance for Altergy's fuel cell products. The objective of this Small Business Voucher (SBV) project therefore will be for NREL and Altergy to work together in three major task areas: 1) demonstrating the fabrication of MEAs at NREL using NREL non-proprietary methods, to the intent of potentially fabricating MEAs at Altergy to reduce product costs; and, 2) creating a cost model to assist Altergy in manufacturing decisions.

30 DIRECT ENERGY CONVERSION↗

Oregon Offshore Wind Site Feasibility and Cost Study

The focus of this presentation is to: Reflect current floating wind technology trends and industry market data in cost models; Provide cost analysis in support of Oregon state energy planners considering floating offshore wind's potential contribution to future state energy supplies.

17 WIND ENERGY↗

A quality-agnostic combinatoric cost estimation model for large-format directed energy deposition metal additive manufacturing

Directed energy deposition (DED) additive manufacturing (AM) processes are amenable to synergistic combination into multi-process AM systems due to similar requirements for automation and energy sources. This work analyzes the economic performance of such DED AM systems from a quality-agnostic combinatoric standpoint with a model that calculates lowest-cost system combinations based on part geometry and process performance metrics. Common DED AM systems research focuses on a single process and does not consider the process, system, and application in the context of all possible system combinations (e.g., the combined set of process selection(s), motion system(s), and process hardware), leading to limited applicability of the resulting DED AM systems to cost-sensitive components such as those found in energy generation applications. The model developed herein incorporates the capital, material, and energy costs associated with DED AM system combinations into a predictive tool for estimating part and system cost, the output of which is intended to guide deployment of finite research and development resources towards DED AM system combinations with the lowest costs and greatest likelihood of economic impact. The DED AM systems identified by this framework may enable domestic production of the large conventionally cast and forged components necessary for energy generation.

Shanafield, Alexandra [ORNL]↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

Foreman, Veronica L.↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the shortcomings of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-the-art in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority weaknesses within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

Cost prediction model for various payloads and instruments for the Space Shuttle Orbiter

The following cost parameters of the space shuttle were undertaken: (1) to develop a cost prediction model for various payload classes of instruments and experiments for the Space Shuttle Orbiter; and (2) to show the implications of various payload classes on the cost of: reliability analysis, quality assurance, environmental design requirements, documentation, parts selection, and other reliability enhancing activities.

Hoffman, F. E.↗

Reference Model 2 Cost Breakdown (RM2: River Current Turbine)

Contains the Reference Model 2 (RM2) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM2 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Microsoft Excel is needed to open the file. This data was generated upon completion of the project on September 30, 2014. The Reference Model Project (RMP), sponsored by the U.S. Department of Energy (DOE), was a partnered effort to develop open-source MHK point designs as reference models (RMs) to benchmark MHK technology performance and costs, and an open-source methodology for design and analysis of MHK technologies, including models for estimating their capital costs, operational costs, and levelized costs of energy. The point designs also served as open-source test articles for university researchers and commercial technology developers. The RMP project team, led by Sandia National Laboratories (SNL), included a partnership between DOE, three national laboratories, including the National Renewable Energy Laboratory (NREL), Pacific Northwest National Laboratory (PNNL), and Oak Ridge National Laboratory (ORNL), the Applied Research Laboratory of Penn State University, and Re Vision Consulting. Reference Model 2 (RM2) is a variable speed dual-rotor cross-flow river turbine that is deployed at the water?s surface. It was designed for deployment at a reference site modeled after a reach in the Mississippi River near Baton Rouge, Louisiana. The rotors are anchored to a two-pontoon vessel platform. Surface deployment of the turbine minimizes the handling requirements during deployment and recovery and reduces overall costs for all O&M activities, including allowing for easy access to the power conversion chain (PCC). The design (two rotors per platform) also reduces the environmental footprint and associated environmental compliance costs.

16 TIDAL AND WAVE POWER↗

Reference Model 5 Cost Breakdown (RM5: Oscillating Surge Flap)

Contains the Reference Model 5 (RM5) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM5 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Microsoft Excel is needed to open the file. This data was generated upon completion of the project on September 30, 2014. The Reference Model Project (RMP), sponsored by the U.S. Department of Energy (DOE), was a partnered effort to develop open-source MHK point designs as reference models (RMs) to benchmark MHK technology performance and costs, and an open-source methodology for design and analysis of MHK technologies, including models for estimating their capital costs, operational costs, and levelized costs of energy. The point designs also served as open-source test articles for university researchers and commercial technology developers. The RMP project team, led by Sandia National Laboratories (SNL), included a partnership between DOE, three national laboratories, including the National Renewable Energy Laboratory (NREL), Pacific Northwest National Laboratory (PNNL), and Oak Ridge National Laboratory (ORNL), the Applied Research Laboratory of Penn State University, and Re Vision Consulting. Reference Model 5 (RM5) is a type of floating, oscillating surge wave energy converter (OSWEC) that utilizes the surge motion of waves to generate electrical power. The reference wave energy resource for RM5 was measurement data from a National Data Buoy Center (NDBC) buoy near Eureka, in Humboldt County, California. The flap was designed to rotate against the supporting frame to convert wave energy into electrical power from the relative rotational motion induced by incoming waves. The RM5 design is rated at 360 kilowatts (kW), uses a flap of 25 m in width and 19 m in height (16 m in draft), and the distance from the top of the water surface piercing flap to the mean water surface (freeboard) is 1.5 m. The flap is connected to a shaft with a 3-m diameter that rotates against the supporting frame. The supporting frame is assumed to have an outer diameter of 2 m, and the total length of the device structure is 45 m. The RM5 OSWEC was designed for deep-water deployment, at depths between 50 m and 100 m, and was tension-moored to the seabed.

16 TIDAL AND WAVE POWER↗