Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Active rendezvous between a low-earth orbit user spacecraft and the Space Transportation System (STS) shuttle

Active rendezvous of an unmanned spacecraft with the Space Transportation System (STS) Shuttle is considered. The various operational constraints facing both the maneuvering spacecraft and the Shuttle during such a rendezvous sequence are discussed. Specifically, the actively rendezvousing user spacecraft must arrive in the generic Shuttle control box at a specified time after Shuttle launch. In so doing it must at no point violate Shuttle separation requirements. In addition, the spacecraft must be able to initiate the transfer sequence from any point in its orbit. The four-burn rendezvous sequence incorporating two Hohmann transfers and an intermediate phasing orbit as a low-energy solution satisfying the above requirements are discussed. The general characteristics of the four-burn sequence are discussed, with emphasis placed on phase orbit altitude and delta-velocity requirements. The planning and execution of such a sequence in the operational environment are then considered. Factor crucial in maintaining the safety of both spacecraft, such as spacecraft separation and contingency analysis, are considered in detail.

Hooper, H. L.↗

A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

Dupnick, E.↗

Construction in space - Toward a fresh definition of the man/machine relation

The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.

Watters, H. H.↗

Automated Target Planning for FUSE Using the SOVA Algorithm

The SOVA algorithm was originally developed under the Resilient Systems and Operations Project of the Engineering for Complex Systems Program from NASA s Aerospace Technology Enterprise as a conceptual framework to support real-time autonomous system mission and contingency management. The algorithm and its software implementation were formulated for generic application to autonomous flight vehicle systems, and its efficacy was demonstrated by simulation within the problem domain of Unmanned Aerial Vehicle autonomous flight management. The approach itself is based upon the precept that autonomous decision making for a very complex system can be made tractable by distillation of the system state to a manageable set of strategic objectives (e.g. maintain power margin, maintain mission timeline, and et cetera), which if attended to, will result in a favorable outcome. From any given starting point, the attainability of the end-states resulting from a set of candidate decisions is assessed by propagating a system model forward in time while qualitatively mapping simulated states into margins on strategic objectives using fuzzy inference systems. The expected return value of each candidate decision is evaluated as the product of the assigned value of the end-state with the assessed attainability of the end-state. The candidate decision yielding the highest expected return value is selected for implementation; thus, the approach provides a software framework for intelligent autonomous risk management. The name adopted for the technique incorporates its essential elements: Strategic Objective Valuation and Attainability (SOVA). Maximum value of the approach is realized for systems where human intervention is unavailable in the timeframe within which critical control decisions must be made. The Far Ultraviolet Spectroscopic Explorer (FUSE) satellite, launched in 1999, has been collecting science data for eight years.[1] At its beginning of life, FUSE had six gyros in two IRUs and four reaction wheels. Over time through various failures, the satellite has been left with one reaction wheel on the vehicle skew axis and two gyros. To remain operational, a control scheme has been implemented using the magnetic torque rods and the remaining momentum wheel.[2] As a consequence, there are attitude regions where there is insufficient torque authority to overcome environmental disturbances (e.g. gravity gradient torques). The situation is further complicated by the fact that these attitude regions shift inertially with time as the spacecraft moves through earth s magnetic field during the course of its orbit. Under these conditions, the burden of planning targets and target-to-target slew maneuvers has increased significantly since the beginning of the mission.[3] Individual targets must be selected so that the magnetic field remains roughly aligned with the skew wheel axis to provide enough control authority to the other two orthogonal axes. If the field moves too far away from the skew axis, the lack of control authority allows environmental torques to pull the satellite away from the target and can potentially cause it to tumble. Slew maneuver planning must factor the stability of targets at the beginning and end, and the torque authority at all points along the slew. Due to the time varying magnetic field geometry relative to any two inertial targets, small modifications in slew maneuver timing can make large differences in the achievability of a maneuver.

Heatwole, Scott↗

One Way or Another

Even experienced project managers can t anticipate every potential problem. Part of planning ahead should include allowing oneself the flexibility to rethink the plan and improvise if necessary. Unique solutions to problems sometimes create a set of new problems unique in nature as well. In dealing with sudden changes in planning, try to consider what other elements of the project will be affected, but don t second guess yourself into a state of inaction because you can t anticipate every contingency.

Zazzali, Christian↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 7, 2013 UTC, and completed its mission on April 17, 2014 UTC with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The mission objectives, much of which can be attributed to careful LADEE mission was a resounding success, achieving all planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission, the Lunar Orbit Insertion (LOI). highly critical phase of the mission.

failure analysis↗

Setting Spacecraft Maximum Allowable Concentrations for 1 hour or 24 hour contingency exposures to airborne chemicals

Since the early years of the manned space program, NASA has developed and used exposure limits called Spacecraft Maximum Allowable Concentrations (SMACs) to help protect astronauts from airborne toxicants. Most of these SMACS are based on an exposure duration of 7 days, since this is the duration of a 'typical' mission. A set of 'contingency SMACs' is also being developed for scenarios involving brief (1-hour or 24- hour) exposures to relatively high levels of airborne toxicants from event-related 'contingency' releases of contaminants. The emergency nature of contingency exposures dictates the use of different criteria for setting exposure limits. The NASA JSC Toxicology Group recently began a program to document the rationales used to set new SMACs and plans to review the older, 7-day SMACs. In cooperation with the National Research Council's Committee on Toxicology, a standard procedure has been developed for researching, setting, and documenting SMAC values.

Garcia, Hector D.↗

Volatile Organic Analyzer (VOA) in 2006: Repair, Revalidation, and Restart of Elektron Event

The Volatile Organic Analyzer (VOA) was launched to the International Space Station (ISS) in August 2001 and was the first instrument to provide near real-time measurement of volatile organic compounds in a spacecraft atmosphere. The VOA performed an analysis of the ISS air approximately twice a month for most of its operation through May 2003. This intermittent operation, caused by a software interface issue with the ISS communication bus, slowed the validation of the VOA. However, operational validation was completed in 2003 when analysis of air samples collected in grab sample containers (GSCs) compared favorably with simultaneous VOA runs (1). The VOA has two channels that provide redundant function, albeit at slightly reduced performance, when only one channel is operating (2). Most target compounds can be detected on both channels. In January 2003, the VOA identified a malfunction in the channel 2 preconcentrator and it shut down that channel. The anomaly profile suggested that a fuse might have failed, but the root cause could not be determined. In May 2003, channel 1 was shut down when the detector s elevated temperature could not longer be maintained. Since both VOA channels were now deactivated, VOA operations ended until an in-flight repair could be planned and executed. This paper describes the process to repair the VOA and to revalidate it for operations, and then an account is given of the VOA s contribution following a contingency event on ISS.

Limero, Thomas↗

NASA Contingency Shuttle Crew Support (CSCS) Medical Operations

The genesis of the space shuttle began in the 1930's when Eugene Sanger came up with the idea of a recyclable rocket plane that could carry a crew of people. The very first Shuttle to enter space was the Shuttle "Columbia" which launched on April 12 of 1981. Not only was "Columbia" the first Shuttle to be launched, but was also the first to utilize solid fuel rockets for U.S. manned flight. The primary objectives given to "Columbia" were to check out the overall Shuttle system, accomplish a safe ascent into orbit, and to return back to earth for a safe landing. Subsequent to its first flight Columbia flew 27 more missions but on February 1st, 2003 after a highly successful 16 day mission, the Columbia, STS-107 mission, ended in tragedy. With all Shuttle flight successes come failures such as the fatal in-flight accident of STS 107. As a result of the STS 107 accident, and other close-calls, the NASA Space Shuttle Program developed contingency procedures for a rescue mission by another Shuttle if an on-orbit repair was not possible. A rescue mission would be considered for a situation where a Shuttle and the crew were not in immediate danger, but, was unable to return to Earth or land safely. For Shuttle missions to the International Space Station (ISS), plans were developed so the Shuttle crew would remain on board ISS for an extended period of time until rescued by a "rescue" Shuttle. The damaged Shuttle would subsequently be de-orbited unmanned. During the period when the ISS Crew and Shuttle crew are on board simultaneously multiple issues would need to be worked including, but not limited to: crew diet, exercise, psychological support, workload, and ground contingency support

Adams, Adrien↗

International Space Station (ISS) Oxygen High Pressure Storage Management

High pressure oxygen onboard the ISS provides support for Extra Vehicular Activities (EVA) and contingency metabolic support for the crew. This high pressure 02 is brought to the ISS by the Space Shuttle and is transferred using the Oxygen Recharge Compressor Assembly (ORCA). There are several drivers that must be considered in managing the available high pressure 02 on the ISS. The amount of O2 the Shuttle can fly up is driven by manifest mass limitations, launch slips, and on orbit Shuttle power requirements. The amount of 02 that is used from the ISS high pressure gas tanks (HPGT) is driven by the number of Shuttle docked and undocked EVAs, the type of EVA prebreath protocol that is used and contingency use of O2 for metabolic support. Also, the use of the ORCA must be managed to optimize its life on orbit and assure that it will be available to transfer the planned amount of O2 from the Shuttle. Management of this resource has required long range planning and coordination between Shuttle manifest on orbit plans. To further optimize the situation hardware options have been pursued.

Lewis, John R.↗

OSIRIS-REx Screening Experience & Lessons Learned

On September 24, 2023, the NASA OSIRIS-REx spacecraft returned a sample of asteroid Bennu, approaching on a hyperbolic impact trajectory relative to Earth. At approximately 108,000 km altitude and four hours prior to hitting the top of the atmosphere, the Sample Return Capsule (SRC) separated from the spacecraft bus, targeting the Utah Test and Training Range. Twenty minutes later, the bus performed a large divert maneuver to fly by at a perigee altitude of ~780 km. Given the immense scientific value of the sample, substantial efforts were undertaken by NASA CARA and the OSIRIS-REx mission to ensure safe passage of the objects from GEO through LEO. This presentation provides an overview of collision avoidance maneuver (CAM) options, results of screenings, coordination with DoD for contingency observations, and lessons learned for screening future Earth flyby and entry trajectories. Two particular challenges included screening two objects using a much larger than normal 250 km spherical monitor volume and decision planning for a single CAM while the SRC was still attached that would alter both trajectories. The larger, non-standard screening volume resulted in custom procedures that CARA personnel had to run manually for each screening, and the initial long propagation times while the objects were more than a week out required significant computing resources. With a single CAM opportunity at 13 hours out, the decision to execute a maneuver had to consider the risk to both objects, where one could imagine a situation where the maneuver would clear a high-risk conjunction for one object and introduce one for the other – begging the question of relative risk posture between the SRC and bus. These among other unique aspects of Earth flyby and entry missions led to novel planning and implementation procedures to support future missions of this type.

Dolan E. Highsmith↗

Contingency study for the third international Sun-Earth Explorer (ISEE-3) satellite

The third satellite of the international Sun-Earth Explorer program was inserted into a periodic halo orbit about L sub 1, the collinear libration point between the Sun and the Earth-Moon barycenter. A plan is presented that was developed to enable insertion into the halo orbit in case there was a large underperformance of the Delta second or third stage during the maneuver to insert the spacecraft into the transfer trajectory. After one orbit of the Earth, a maneuver would be performed near perigee to increase the energy of the orbit. A relatively small second maneuver would put the spacecraft in a transfer trajectory to the halo orbit, into which it could be inserted for a total cost within the fuel budget. Overburns (hot transfer trajectory insertions) were also studied.

Dunham, D. W.↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Smarter Software For Enhanced Vehicle Health Monitoring and Inter-Planetary Exploration

The existing philosophy for space mission control was born in the early days of the space program when technology did not exist to put significant control responsibility onboard the spacecraft. NASA relied on a team of ground control experts to troubleshoot systems when problems occurred. As computing capability improved, more responsibility was handed over to the systems software. However, there is still a large contingent of both launch and flight controllers supporting each mission. New technology can update this philosophy to increase mission assurance and reduce the cost of inter-planetary exploration. The advent of model-based diagnosis and intelligent planning software enables spacecraft to handle most routine problems automatically and allocate resources in a flexible way to realize mission objectives. The manifests for recent missions include multiple subsystems and complex experiments. Spacecraft must operate at longer distances from earth where communications delays make earthbound command and control impractical. NASA's Ames Research Center (ARC) has demonstrated the utility of onboard diagnosis and planning with the Remote Agent experiment in 1999. KSC has pioneered model-based diagnosis and demonstrated its utility for ground support operations. KSC and ARC are cooperating in research to improve the state of the art of this technology. This paper highlights model-based reasoning applications for Moon and Mars missions including in-situ resource utilization and enhanced vehicle health monitoring.

Larson, William E.↗

A Dynamic Risk Model for Evaluation of Space Shuttle Abort Scenarios

The Space Shuttle is an advanced manned launch system with a respectable history of service and a demonstrated level of safety. Recent studies have shown that the Space Shuttle has a relatively low probability of having a failure that is instantaneously catastrophic during nominal flight as compared with many US and international launch systems. However, since the Space Shuttle is a manned. system, a number of mission abort contingencies exist to primarily ensure the safety of the crew during off-nominal situations and to attempt to maintain the integrity of the Orbiter. As the Space Shuttle ascends to orbit it transverses various intact abort regions evaluated and planned before the flight to ensure that the Space Shuttle Orbiter, along with its crew, may be returned intact either to the original launch site, a transoceanic landing site, or returned from a substandard orbit. An intact abort may be initiated due to a number of system failures but the highest likelihood and most challenging abort scenarios are initiated by a premature shutdown of a Space Shuttle Main Engine (SSME). The potential consequences of such a shutdown vary as a function of a number of mission parameters but all of them may be related to mission time for a specific mission profile. This paper focuses on the Dynamic Abort Risk Evaluation (DARE) model process, applications, and its capability to evaluate the risk of Loss Of Vehicle (LOV) due to the complex systems interactions that occur during Space Shuttle intact abort scenarios. In addition, the paper will examine which of the Space Shuttle subsystems are critical to ensuring a successful return of the Space Shuttle Orbiter and crew from such a situation.

Henderson, Edward M.↗

Haughton-Mars Project (HMP)/NASA 2006 Lunar Medical Contingency Simulation: An Overview

Medical requirements are currently being developed for NASA's space exploration program. Lunar surface operations for crews returning to the moon will be performed on a daily basis to conduct scientific research and construct a lunar habitat. Inherent to aggressive surface activities is the potential risk of injury to crew members. To develop an evidence-base for handling medical contingencies on the lunar surface, a simulation project was conducted using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic. A review of the Apollo lunar surface activities and personal communications with Apollo lunar crew members provided a knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity. Objectives were established to 1) demonstrate stabilization, field extraction and transfer an injured crew member to the habitat and 2) evaluate audio, visual and biomedical communication capabilities with ground controllers at multiple mission control centers. The simulation project s objectives were achieved. Among these objectives were 1) extracting a crew member from a sloped terrain by a two-member team in a 1-g analog environment, 2) establishing real-time communication to multiple space centers, 3) providing biomedical data to flight controllers and crew members, and 4) establishing a medical diagnosis and treatment plan from a remote site. The simulation project provided evidence for the types of equipment and methods needed for planetary space exploration. During the project, the crew members were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges. These trials provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives of this project will be incorporated into the exploration medical requirements involving an incapacited astronaut on the lunar surface.

Scheuring, R. A.↗

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Artificial Gravity in Mars Orbit for Crew Acclimation

NASA’s current baseline plan for a crewed Mars mission anticipates a transit time of up to three hundred days in microgravity and 3-14 days on the Martian surface for gravity acclimation before the crew can safely perform their first Extra-Vehicular Activity (EVA). While there are multiple options for how initial surface operations will be performed, all current designs involve acclimation on the surface, and the impacts on the mission schedule, required supplies, and crew lander systems are significant. This paper proposes an alternative option utilizing artificial gravity, which offers benefits in terms of mission scope, mass savings, crew health, and long-term strategic vision. By moving the acclimation requirement to the orbiting habitat’s existing systems, rather than adding redundant systems to the lander, the Mars Descent Vehicle (MDV) can be a much smaller, simpler, and lighter design. Rather than the lander being designed to support crew for days, it would be mere hours. While ambitious, the concept of pre-acclimation in orbit can be not only safe and feasible, but done with fairly minimal changes to the planned architecture and overall mass requirements. The data used draws on decades of established research and demonstrates how this capability can be not only used for pre-acclimation, but also to support crew during early orbital-only missions, surface abort contingency scenarios, return-to-orbit abort scenarios, and as an early proof of capability into larger and more ambitious artificial gravity designs needed for extended exploration missions in the future.

Rowe, Justin↗