Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS
In 2020, Patua Acquisition Company LLC, submitted the proposal “Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS”, in response to the DOE’s Geothermal Wells of Opportunity Funding Opportunity Announcement. The primary goal of the project was to convert an idle well, Patua 16-29, to an active producer and generate at least an additional 5 MWe at the Patua plant. The project was intended to provide an example of a reproducible methodology for well stimulation in Enhanced Geothermal Systems The project was proposed to be performed in three phases over a period of performance of four years. A first project go/no-go decision was made at the end of Phase 1 based on feasibility of the wellbore, site, and ability to realize a 5 MWe benefit from the project. Several factors were recognized that led to a no-go decision at this phase: • Electrical needs for placing the stimulated well on production were not considered in the initial scoping. Costs of pipeline costs were also underestimated in the original cost share. Easements and rights-of-way to establish a geothermal pipeline underneath or across an interstate highway were also found to be intractable on the time scale of the project. • The plant is injection limited, and no design or cost estimate was in place to handle the additional production needed to realize a 5 Mwe benefit. A new injection well would need to be drilled in addition to the other facility improvements to bring in the stimulated well. Patau Acquisition Company attempted to locate additional wells of opportunity that could realize the SOPOs goals, but was unsuccessful. As a result, this project is being terminated at the end of Phase 1.