Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Research and Development of a Low Cost Solar Collector

This is a Final Technical Report on the Research and Development completed towards the development of a Low Cost Solar Collector conducted under the DOE cost-sharing award EE-0003591. The objective of this project was to develop a new class of solar concentrators with geometries and manufacturability that could significantly reduce the fully installed cost of the solar collector field for concentrated solar thermal power plants. The goal of the project was to achieve an aggressive cost target of $\$$170/m 2 , a reduction of up to 50% in the total installed cost of a solar collector field as measured against the current industry benchmark of a conventional parabolic trough. The project plan, and the detailed activities conducted under the scope of the DOE Award project addressed all major drivers that affect solar collector costs. In addition to costs, the study also focused on evaluating technical performance of new collector architectures and compared them to the performance of the industry benchmark parabolic trough. The most notable accomplishment of this DOE award was the delivery of a full-scale integrated design, manufacturing and field installation solution for a new class of solar collector architecture which has been classified as the Bi-Planar Fresnel Collector (BPFC) and may be considered as a viable alternative to the conventional parabolic trough, as well as the conventional Fresnel collectors. This was in part accomplished through the design and development, all the way through fabrication and test validation of a new class of Linear Planar Fresnel Collector architecture. This architecture offers a number of key differentiating features which include a planar light-weight frame geometry with small mass-manufacturable elements utilizing flat mirror sections. The designs shows significant promise in reducing the material costs, fabrication costs, shipping costs, and on-site field installation costs compared to the benchmark parabolic trough, as well as the conventional Fresnel collector. The noteworthy design features of the BPFC architecture include the use of relatively cheaper flat mirrors and a design which allows the mirror support beam sections to act as load-bearing structural elements resulting in more than a 36% reduction in the overall structural weight compared to an optimized parabolic trough. Also, it was shown that the utilization of small mass-produced elements significantly lowers mass-production and logistics costs that can more quickly deliver economies of scale, even for smaller installations while also reducing shipping and installation costs. Moreover, unlike the traditional Fresnel trough the BPFC architecture does not require complex articulating drive mechanisms but instead utilizes a standard parabolic trough hydraulic drive mechanism. In addition to the development of the Bi-Planar Fresnel Collector, an optimized conventional space-frame type parabolic trough was also designed, built, analyzed and field-tested during the first phase of this award. The design of the conventional space-frame parabolic collector was refined with extensive FEA and CFD analysis to reduce material costs and re-designed for simpler fabrication and more accurate lower-cost field assembly. This optimized parabolic trough represented an improvement over the state-of-the art of the traditional parabolic trough architecture and also served as a more rigorous and less subjective benchmark that was used for comparison of new candidate design architectures. The results of the expanded 1 st phase of the DOE award project showed that both the Optimized Parabolic Trough and the new Bi-Planar Fresnel Collector design concepts failed to meet the primary objectives for the project of achieving a 50% cost reduction from the industry reference total installed cost of $\$$350/m 2 . Results showed that the BPFC came in at projected total installed cost of $\$$237/m 2 representing a 32% savings compared to the industry benchmark conventional parabolic trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the industry benchmark reference was approximately 16.5% against the industry benchmark. The new BPFC design showed a weight savings of almost 36% compared to the optimized parabolic trough and a 50% reduction in field assembly labor and a 13% reduction in shipping volume. The BPFC design showed only a marginal improvement of 16% over the fully projected installed cost of the optimized parabolic trough benchmark developed as Concept One. During the course of the investigation numerous sensitivity analyses and other analytical studies were conducted to assess potential improvement opportunities, and further optimizations that could lead to cost reductions and performance improvements. Factors that could have a significant impact on high-volume costs were related to production and further improvements in design for manufacturability, automation, assembly jigs, and fixtures, and robotic welding etc. The wind modeling analysis showed that the Fresnel design concept did not reduce the wind load in a significant manner. The stress analysis showed that the design concept with almost a 36% lower weight than the parabolic trough and it was strong enough to withstand the expected wind loads and maintain targeting accuracy. The Initial on-sun optical testing showed that the Fresnel Trough was capable of concentrating sunlight effectively to the desired target and yielding an optical efficiency slightly lower than a parabolic trough.

14 SOLAR ENERGY↗

Thermoelectric System Economics - The Apex: New Paradigms in Manufacturing and Interface Performance Relationships Driving System Cost Optimizations

Thermoelectric energy recovery systems require cost-optimized designs with high thermal and thermoelectric (TE) performance to surmount common commercialization barriers controlling the acceptance of thermoelectric generator (TEG) systems. Recent work has addressed this requirement with new analytic tools and paradigms that allow integrated TEG cost-performance analysis and optimization. New work herein has identified the existence of optimized TE element design (i.e., TE element length) for minimizing TEG cost and provides design guidelines associated with critical thermal and electrical contact resistance effects and TE manufacturing sensitivities. Once optimum hot-side heat flux criteria are satisfied, this work highlights the tradeoffs between interface resistance effects and manufacturing cost effects in determining optimum-cost TE element lengths, and then quantifies the increase in optimum-cost TE lengths as manufacturing costs become more sensitive to TE element lengths. Optimized TE element design criteria and key non-dimensional design parameters (i.e., [𝐶′′′LTE/𝐶′′], [TE/con], [con/(TE,aveLTE)]) driving the design are presented and explained showing the interdependencies between manufacturing cost parameters and thermal and electrical interface impacts on integrated TE cost-performance analysis and design. Comprehensive TEG system cost-performance relationships clearly demonstrate the two parameters that most greatly impact the TEG system cost are heat exchanger costs ($/(W/K)) and TE hot side heat flux. Reducing heat exhanger cost from $1/(W/K) to $0.5/(W/K) can decrease TEG system cost by $2/W to $4/W depending on TE hot side heat fluxes from 4-10 W/cm2. The impact of TE hot side heat flux on TEG system cost is larger; reducing TE system cost by factors of 2-4 as TE hot side heat flux increases from 4 W/cm2 to high levels around 18 W/cm2. The levels of thermal contact resistance and electrical contact resistance required to even approach the critical TEG system cost level of $1/W are characterized by con = 1.0 x 10-10 -m2 and r = 0.1, respectively. This not only lowers TEG costs, but it also makes the TEG system costs less sensitive to TE manufacturing dependences on TE element length. New design paradigms and relationships create holistic, integrated TE performance-cost models that enhance understanding of crucial interrelationships between component costs, TE design parameters and material properties, heat exchanger design parameters, interfacial heat flux, and now thermal and electrical interface effects in minimizing TEG system costs.

Hendricks, Terry J.↗

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Lawrence Livermore National Security Cost Model Functional Management Assessment

The scope of the Functional Management Assessment of the cost model included a review of the plan and progress of the Cost Model Review Team. The review focused on processes in place to ensure simplicity, compliance with cost accounting standards and indirect cost allocation methodology, and the change management plan. This was intended to be a high-level initial review in order to provide recommendations for a subsequent more comprehensive review. The single document reviewed by the team during the assessment was the Indirect Cost Recovery Model Review, which describes how the indirect rate restructure and new organizational structure have resulted in streamlined charging practices to better understand and strategically manage costs. ISSUE 1: The cost model focuses heavily on rate structure but not on cost management. Significant progress has been made to simplify the rate structure. The number of indirect rates has been reduced from 67 different indirect rates used under the prior contract to 32 rates in the first year of the LLNS contract, with a goal of further reduction to 16 for FY09. The reductions are being recommended by a broad-based Working Group driven by Lab leadership desiring a simplified rate structure that would make it easier to analyze the true cost of overhead, be viewed as equitable, and ensure appropriate use of Service, i.e., operations, Centers. This has been a real challenge due to the significant change in approach from one that previously involved a very complex rate structure. Under this prior approach, the goal was to manage the rates, and rates were established at very detailed levels that would 'shine the light' on pools of overhead costs. As long as rates stayed constant or declined, not as much attention tended to be given to them, particularly with so many pools to review (184 indirect rate pools in FY05). However, as difficult and important as simplifying the rate structure has been, the fundamental reason for the simplification is to make it easier to analyze the true cost of overhead so the costs can be effectively managed. For the current year, the overall the goal of keeping the total cost of an FTE to FY07 levels. This approach reflects the past practice of managing to rates rather than focusing on costs, although streamlined with the more simplified rate structure. Given all the challenges being faced with the contract transition, this was a reasonable interim tactic for dealing with the known cost increases such as fees and taxes. Nonetheless, in order to take full advantage of the opportunities that exist for making sound decisions for further reducing the rates themselves, the Laboratory needs to implement an ongoing and disciplined approach to understanding and managing overhead cost. ISSUE 2: The NIF has a significantly different rate structure than other Laboratory work. Because of its significant size and unique organizational structure as a major construction project, the National Ignition Facility (NIF) has indirect charges that vary from the norm. These variations were reviewed and approved by and disclosed to the NNSA in the Laboratory's past annual Disclosure Statements. In mid-FY 09, NIF will begin transition from a construction line item to an operational center. The reallocation of costs when this occurs could significantly impact the Laboratory's rates and rate structure planning for that transition from a cost- and rate- impact standpoint should begin soon. ISSUE 3: The new rate model must be finalized shortly in order to implement the model beginning in FY 09. As noted in Issue No.1, a Working Group has developed a simplified rate structure for the Lab to use for FY09. The Working Group has evaluated the cost impacts of the simplified rate structure at the major program level and identified a disparate impact in the Safeguards and Security area where a substantial increase in overhead cost allocation may need to be mitigated. The simplified rate structure will need to be approved by the Laboratory Director and issued within the Laboratory to formulate detailed budgets so that operations using the new rates can proceed beginning October 1, 2008. A number of activities should occur over the coming weeks and months to ensure a smooth implementation.

99 GENERAL AND MISCELLANEOUS↗

U.S. Department of Energy Hydrogen Storage Cost Analysis

The overall objective of this project is to conduct cost analyses and estimate costs for on- and off-board hydrogen storage technologies under development by the U.S. Department of Energy (DOE) on a consistent, independent basis. This can help guide DOE and stakeholders toward the most-promising research, development and commercialization pathways for hydrogen-fueled vehicles. A specific focus of the project is to estimate hydrogen storage system cost in high-volume production scenarios relative to the DOE target that was in place when this cost analysis was initiated. This report and its results reflect work conducted by TIAX between 2004 and 2012, including recent refinements and updates. The report provides a system-level evaluation of costs and performance for four broad categories of on-board hydrogen storage: (1) reversible on-board metal hydrides (e.g., magnesium hydride, sodium alanate); (2) regenerable off-board chemical hydrogen storage materials(e.g., hydrolysis of sodium borohydride, ammonia borane); (3) high surface area sorbents (e.g., carbon-based materials); and 4) advanced physical storage (e.g., 700-bar compressed, cryo-compressed and liquid hydrogen). Additionally, the off-board efficiency and processing costs of several hydrogen storage systems were evaluated and reported, including: (1) liquid carrier, (2) sodium borohydride, (3) ammonia borane, and (4) magnesium hydride. TIAX applied a bottom-up costing methodology customized to analyze and quantify the processes used in the manufacture of hydrogen storage systems. This methodology, used in conjunction with ® software and other tools, developed costs for all major tank components, balance-of-tank, tank assembly, and system assembly. Based on this methodology, the figure below shows the projected on-board high-volume factory costs of the various analyzed hydrogen storage systems, as designed. Reductions in the key cost drivers may bring hydrogen storage system costs closer to this DOE target. In general, tank costs are the largest component of system cost, responsible for at least 30 percent of total system cost, in all but two of the 12 systems. Purchased BOP cost also drives system cost, accounting for 10 to 50 percent of total system cost across the various storage systems. Potential improvements in these cost drivers for all storage systems may come from new manufacturing processes and higher production volumes for BOP components. In addition, advances in the production of storage media may help drive down overall costs for the sodium alanate, SBH, LCH2, MOF, and AX-21 systems.

08 HYDROGEN↗

Potential Cost Implications of an Interim Storage Facility for Commercial SNF+ - 17132

The question of whether or not consolidated interim storage of commercial spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. This paper summarizes an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). In this study, the order-of-magnitude estimates of total system costs were calculated and tabulated. The analyzed scenarios involve shipment of SNF from reactors in dual-purpose storage and transportation canisters (DPCs) currently being used by utilities for dry storage at reactor sites. A number of pertinent conclusions can be drawn from this evaluation, including: - Delay in repository availability increases total system costs. Any delay in opening a repository increases total system costs, regardless of whether the system has an ISF or not. This is due to the increased cost associated with an extended duration for storage, whether at multiple independent spent fuel storage installations (ISFSIs) or at an ISF, until waste can be disposed of.- There is a potential total system lifecycle cost avoidance in realistic scenarios with an ISF when compared to scenarios with no ISF. However, most of the cost avoidance occurs several decades after the ISF is opened. The total WMS cost differential over the long term is mainly attributed to the reduced operational costs of storing the fuel in a consolidated facility rather than at individual reactor sites. - Earlier establishment of an ISF allows for more avoidance of post-shutdown at-reactor storage costs for any repository opening date. An ISF allows earlier acceptance of fuel from reactors, which reduces at-reactor costs from a total system perspective. - Transportation costs have little impact on a WMS with or without an ISF. These impacts range from 3-11% of the total cost in all scenarios. Therefore, transporting the fuel twice does not appear to be a significant cost concern driver relative to other system costs. In conclusion, designing, licensing, and constructing an ISF will require a large near-term financial investment. However, reduced annual operating and maintenance costs for an integrated waste management system with an ISF, compared to a system without an ISF, could eventually result in system-wide (integrated) cost avoidance due to reductions in at-reactor storage costs in the long term. The largest cost avoidances would not occur for several decades, so assumptions about inflation, escalation, and discount rates will have a significant effect on potential economic impacts of an ISF. It should be noted that other benefits associated with the investment of an ISF-such as earlier removal of SNF from shutdown reactor sites, earlier prospects for site re-utilization, and additional overall integrated waste management system flexibility-were not addressed in this study. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Cost Hydrogen Distributed Production System Development

H{sub 2}Gen, with the support of the Department of Energy, successfully designed, built and field-tested two steam methane reformers with 578 kg/day capacity, which has now become a standard commercial product serving customers in the specialty metals and PV manufacturing businesses. We demonstrated that this reformer/PSA system, when combined with compression, storage and dispensing (CSD) equipment could produce hydrogen that is already cost-competitive with gasoline per mile driven in a conventional (non-hybrid) vehicle. We further showed that mass producing this 578 kg/day system in quantities of just 100 units would reduce hydrogen cost per mile approximately 13% below the cost of untaxed gasoline per mile used in a hybrid electric vehicle. If mass produced in quantities of 500 units, hydrogen cost per mile in a FCEV would be 20% below the cost of untaxed gasoline in an HEV in the 2015-2020 time period using EIA fuel cost projections for natural gas and untaxed gasoline, and 45% below the cost of untaxed gasoline in a conventional car. This 20% to 45% reduction in fuel cost per mile would accrue even though hydrogen from this 578 kg/day system would cost approximately $4.14/kg, well above the DOE hydrogen cost targets of $2.50/kg by 2010 and $2.00/kg by 2015. We also estimated the cost of a larger, 1,500 kg/day SMR/PSA fueling system based on engineering cost scaling factors derived from the two H{sub 2}Gen products, a commercial 115 kg/day system and the 578 kg/day system developed under this DOE contract. This proposed system could support 200 to 250 cars per day, similar to a medium gasoline station. We estimate that the cost per mile from this larger 1,500 kg/day hydrogen fueling system would be 26% to 40% below the cost per mile of untaxed gasoline in an HEV and ICV respectively, even without any mass production cost reductions. In quantities of 500 units, we are projecting per mile cost reductions between 45% (vs. HEVs) and 62% (vs ICVs), with hydrogen costing approximately $2.87/kg, still above the DOE's 2010 $2.50/kg target. We also began laboratory testing of reforming ethanol, which we showed is currently the least expensive approach to making renewable hydrogen. Extended testing of neat ethanol in micro-reactors was successful, and we also were able to reform E-85 acquired from a local fueling station for 2,700 hours, although some modifications were required to handle the 15% gasoline present in E-85. We began initial tests of a catalyst-coated wall reformer tube that showed some promise in reducing the propensity to coke with E-85. These coated-wall tests ran for 350 hours. Additional resources would be required to commercialize an ethanol reformer operating on E-85, but there is no market for such a product at this time, so this ethanol reformer project was moth-balled pending future government or industry support. The two main objectives of this project were: (1) to design, build and test a steam methane reformer and pressure swing adsorption system that, if scaled up and mass produced, could potentially meet the DOE 2015 cost and efficiency targets for on-site distributed hydrogen generation, and (2) to demonstrate the efficacy of a low-cost renewable hydrogen generation system based on reforming ethanol to hydrogen at the fueling station.

08 HYDROGEN↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗

Cost Analysis in a Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process.

Felton, Larry↗

Cost Analysis In A Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature serviceoriented, multi-mission control centers to streamline or refine their cost analysis process.

Newhouse, M.↗

Control and Cost-benefit Analysis of Fast Spreading Diseases: The case of Ebola

Mitigating the spread of infectious disease is of great importance for policy makers. Taking the recent outbreak of Ebola as an example, it was difficult for policy makers to identify the best course of action based on the cost-effectiveness of what was available. In effort to address the needs of policy makers to mitigate the spread of infectious disease before an outbreak becomes uncontrollable, we have devised a cost-benefit disease control model to simulate the effect of various control methods on disease incidence and the cost associated with each of the scenarios. Here, we present a case study of Ebola used to quantify the cost effectiveness of vaccination and isolation methods to minimize the spread of the disease. We evaluate the impact of changing strategy levels on the incidence of the disease and address the benefits of choosing one strategy over the other with regards to cost of vaccine and isolation. Disease. We use a general SEIRJ model for disease transmission. Here, S-Susceptible, E- Exposed (latent), IA– Infected (asymptomatic),IM– Infected (mild symptoms), IS– Infected (severe symptoms),JM– Isolated (mild symptoms at home), JS– Isolated (severe symptoms in hospital), and R- Recovered individuals. In this model, we consider the dynamics of the system and the effect of the relative transmissibility of isolated individuals (L) compared to other infected individuals. Cost. Ebola vaccination and treatment are very expensive and not widely available. Some preliminary data shows that it will take$73 million (M) to produce 27 M vaccines plus the cost for vaccine delivery and health care professionals (not included here). On the other hand, the treatment for Ebola in the U.S. would cost $25,000dollars a day per person to ensure proper isolation and adequate care(treatment, health care professionals, facilities and special equipment).Although not included in this research, the proper isolation of Ebola patients would also lead to a loss in hospital revenue of $148,000per day due to reduced patient capacity3. Here, we use $27,000 per individual hospitalized per day and $2.70 per person vaccinated. Model. To evaluate the cost-effectiveness of control methods on disease transmission, we assessed the affect of different levels of vaccination coverage on the resulting number of infected individuals. Then, we calculated the overall estimated cost of vaccination and resulting hospitalization for each scenario to identify the lowest cost-benefit ratio. Using a base population of 10 M individuals, we ran scenarios for different levels of vaccination (μ= 0.01, 0.05, 0.1) while varying the relative transmissibility of isolated individuals (L = 0.5, 0.6, 0.65).For each combination, we calculated the incidence, vaccination and hospitalization cost per individual per day (Fig 1). We note that an increase in the relative transmissibility of isolated individuals leads to a higher number of infected people and, therefore, a reduced number of candidates for vaccination and an overall increase in cost. Since the cost of vaccination is 1 ten-thousandth of the cost of hospitalization, our results clearly show the cost-benefit of vaccinating over hospital treatment. In every scenario studied, we observed a measurable reduction in disease incidence when vaccinating a higher fraction of the population compared to isolating individuals post infection. Given these preliminary results, we plan to extend the framework of our model to a dynamic control system where we consider the cost of vaccination and isolation embedded in the system of differential equations. This approach will allow us see the best available control implementation while minimizing the cost of treatment and vaccination.

EBOLA↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection

The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria such as performance, safety, reliability, crew time, and technical and schedule risk are considered, but cost is always an important factor. Because launch cost would account for much of the cost of a future planetary mission, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select advanced life support technology. The equivalent mass of a life support system includes the estimated mass of the hardware and of the spacecraft pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass of a system is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in the Advanced Life Support project. ESM adds a mass-equivalent of crew time and possibly other cost factors to equivalent mass. Traditional equivalent mass is strictly based on flown mass and reflects only the launch cost. ESM includes other important cost factors, but it complicates the simple flown mass definition of equivalent mass by adding a non-physical mass penalty for crew time that may exceed the actual flown mass. Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. For Earth orbit rather than planetary missions, the launch cost is less than the cost of Design, Development, Test, and Evaluation (DDTBE). LCC is a more inclusive cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission destination and duration. Since DDTBE or operations may cost more than launch, LCC gives a more accurate relative cost ranking than equivalent mass. To select the lowest cost technology for a particular application we should use LCC rather than equivalent mass.

Jones, Harry↗

The Recent Large Reduction in Space Launch Cost

The development of commercial launch systems has substantially reduced the cost of space launch. NASA’s space shuttle had a cost of about $1.5 billion to launch 27,500 kg to Low Earth Orbit (LEO), $54,500/kg. SpaceX’s Falcon 9 now advertises a cost of $62 million to launch 22,800 kg to LEO, $2,720/kg. Commercial launch has reduced the cost to LEO by a factor of 20. This will have a substantial impact on the space industry, military space, and NASA. Existing launch providers are reducing their costs and so are satellite developers. The military foresees an opportunity to rapidly replace compromised space assets that provided communications, weather, surveillance, and positioning. NASA supported the development of commercial space launch and NASA science anticipates lower cost missions, but human space flight planning seems unreactive. Specifically, it has been claimed that commercial spaceflight has not reduced the cost to provide cargo to the International Space Station (ISS). The key factor is that the space shuttle can provide cargo and crew to ISS while the Falcon 9 must also use the Dragon capsule, which adds cost and reduces payload. The cost of a Falcon 9 and Dragon capsule mission to ISS is about $140 million with a payload of 6,000 kg, $23,300/kg. The shuttle payload to ISS is less than to LEO, 16,050 kg, so its cost is also higher at $93,400/kg. The launch cost to ISS has been reduced by a factor of 4. Calculations that show commercial launch provides no cost reduction to ISS assume half the usually cited shuttle cost and allocate it to the actual delivered payload, about half the full capacity. In a split mission, with crew and pressurized cargo launched separately from hardware and materials, the higher Falcon 9 plus Dragon costs would apply only to a fraction of the launch mass. A 4 to 1 cost reduction saves most, 75%, of the total cost. A further reduction to 10 or 20 to 1 saves 90 or 95%, but this is only a small, 15 or 20%, portion of the original cost. The recently reduced space launch cost can be expected to substantially impact human space flight.

Jones, Harry W.↗

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost Scaling of a Real-World Exhaust Waste Heat Recovery Thermoelectric Generator: A Deeper Dive

Cost is equally important to power density or efficiency for the adoption of waste heat recovery thermoelectric generators (TEG) in many transportation and industrial energy recovery applications. In many cases the system design that minimizes cost (e.g., the $/W value) can be very different than the design that maximizes the system's efficiency or power density, and it is important to understand the relationship between those designs to optimize TEG performance-cost compromises. Expanding on recent cost analysis work and using more detailed system modeling, an enhanced cost scaling analysis of a waste heat recovery thermoelectric generator with more detailed, coupled treatment of the heat exchangers has been performed. In this analysis, the effect of the heat lost to the environment and updated relationships between the hot-side and cold-side conductances that maximize power output are considered. This coupled thermal and thermoelectric treatment of the exhaust waste heat recovery thermoelectric generator yields modified cost scaling and design optimization equations, which are now strongly dependent on the heat leakage fraction, exhaust mass flow rate, and heat exchanger effectiveness. This work shows that heat exchanger costs most often dominate the overall TE system costs, that it is extremely difficult to escape this regime, and in order to achieve TE system costs of $1/W it is necessary to achieve heat exchanger costs of $1/(W/K). Minimum TE system costs per watt generally coincide with maximum power points, but Preferred TE Design Regimes are identified where there is little cost penalty for moving into regions of higher efficiency and slightly lower power outputs. These regimes are closely tied to previously-identified low cost design regimes. This work shows that the optimum fill factor Fopt minimizing system costs decreases as heat losses increase, and increases as exhaust mass flow rate and heat exchanger effectiveness increase. These findings have profound implications on the design and operation of various thermoelectric (TE) waste heat 3 recovery systems. This work highlights the importance of heat exchanger costs on the overall TEG system costs, quantifies the possible TEG performance-cost domain space based on heat exchanger effects, and provides a focus for future system research and development efforts.

cost analysis↗