Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Energy Evaluation of a New Construction Pilot Community: Fresno, California

A new construction pilot community was constructed by builder-partner Wathen-Castanos Hybrid Homes (WCHH) based on a single occupied test house that was designed to achieve greater than 30% energy savings with respect to the House Simulation Protocols (Hendron, Robert; Engebrecht, Cheryn (2010). Building America House Simulation Protocols. Golden, CO: National Renewable Energy Laboratory). Builders face several key problems when implementing a whole-house systems integrated measures package (SIMP) from a single test house into multiple houses. Although a technical solution already may have been evaluated and validated in an individual test house, the potential exists for constructability failures at the community scale. This report addresses factors of implementation and scalability at the community scale and proposes methodologies by which community-scale energy evaluations can be performed based on results at the occupied test house level. Research focused on the builder and trade implementation of a SIMP and the actual utility usage in the houses at the community scale of production. Five occupants participated in this community-scale research by providing utility bills and information on occupancy and miscellaneous gas and electric appliance use for their houses. IBACOS used these utility data and background information to analyze the actual energy performance of the houses. Verification with measured data is an important component in predictive energy modeling. The actual utility bill readings were compared to projected energy consumption using BEopt with actual weather and thermostat set points for normalization.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report: Self-Consolidating Concrete Construction for Modular Units

This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to the steel composite modules being assembled at the Vogtle and V.C. Summer plant expansions. The final test showed that the roughened cold-joint showed excellent shear and flexural capacity, and substantial ductility, when used in conjunction with steel composite construction.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 1: 2x6 Walls

Part 1 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides time-proven, practical, and cost-effective strategies for constructing durable, energy-efficient walls. It addresses walls constructed with 2x6 wood frame studs, wood structural panel (WSP) exterior sheathing, and a cladding system installed over WSP sheathing in low-rise residential buildings up to three stories high.

2x6 wood frame studs↗

Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 2: 2x4 Walls

Part 2 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides straightforward and cost-effective strategies to construct durable, energy-efficient walls. It addresses walls constructed with 2x4 wood frame studs, wood structural panel (WSP) sheathing as wall bracing and added backing for foam sheathing, a layer of rigid foam sheathing insulation up to 1.5 inches thick over the WSP, and a cladding system installed over the foam sheathing in low-rise residential buildings up to three stories high. Walls with 2x6 framing are addressed in Part 1 of the Guide.

2x4 wood frame studs↗

Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 1: 2x6 Walls

Part 1 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides time-proven, practical, and cost-effective strategies for constructing durable, energy-efficient walls. It addresses walls constructed with 2x6 wood frame studs, wood structural panel (WSP) exterior sheathing, and a cladding system installed over WSP sheathing in low-rise residential buildings up to three stories high.

2x6 wood frame studs↗

Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 2: 2x4 Walls

Part 2 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides straightforward and cost-effective strategies to construct durable, energy-efficient walls. It addresses walls constructed with 2x4 wood frame studs, wood structural panel (WSP) sheathing as wall bracing and added backing for foam sheathing, a layer of rigid foam sheathing insulation up to 1.5 inches thick over the WSP, and a cladding system installed over the foam sheathing in low-rise residential buildings up to three stories high. Walls with 2x6 framing are addressed in Part 1 of the Guide.

2x4 wood frame studs↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Building Construction Collaborative (Final Technical Report)

This report summarizes the outcomes of RMI’s five-year U.S. Department of Energy–funded Advanced Building Construction Collaborative (ABC-C), which accelerated adoption of high-performance construction through industry collaboration, market research, technology commercialization, and demand aggregation. It highlights the Collaborative’s achievements—including engagement of more than 130 organizations, support for over $637 million in funding for ABC companies, and recommendations to scale advanced building construction through coordinated market, policy, and investment strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report Construction of Whole Genome Microarrays, and Expression Analysis of Desulfovibrio vulgaris cells in Metal-Reducing Conditions

We continue to utilize the oligonucleotide microarrays that were constructed through funding with this project to characterize growth responses of Desulfovibrio vulgaris relevant to metal-reducing conditions. To effectively immobilize heavy metals and radionuclides via sulfate-reduction, it is important to understand the cellular responses to adverse factors observed at contaminated subsurface environments (e.g., nutrients, pH, contaminants, growth requirements and products). One of the major goals of the project is to construct whole-genome microarrays for Desulfovibrio vulgaris. First, in order to experimentally establish the criteria for designing gene-specific oligonucleotide probes, an oligonucleotide array was constructed that contained perfect match (PM) and mismatch (MM) probes (50mers and 70mers) based upon 4 genes. The effects of probe-target identity, continuous stretch, mismatch position, and hybridization free energy on specificity were examined. Little hybridization was observed at a probe-target identity of <85% for both 50mer and 70mer probes. 33 to 48% of the PM signal intensities were detected at a probe-target identity of 94% for 50mer oligonucleotides, and 43 to 55% for 70mer probes at a probe-target identity of 96%. When the effects of sequence identity and continuous stretch were considered independently, a stretch probe (>15 bases) contributed an additional 9% of the PM signal intensity compared to a non-stretch probe (< 15 bases) at the same identity level. Cross-hybridization increased as the length of continuous stretch increased. A 35-base stretch for 50mer probes or a 50-base stretch for 70mer probes had approximately 55% of the PM signal. Mismatches should be as close to the middle position of an oligonucleotide probe as possible to minimize cross-hybridization. Little cross-hybridization was observed for probes with a minimal binding free energy greater than -30 kcal/mol for 50mer probes or -40 kcal/mol for 70mer probes. Based on the experimental results, a set of criteria were suggested for the design of gene-specific and group-specific oligonucleotide probes, and these criteria should provide valuable information for the development of new software and algorithms for microarray-based studies. Secondly, in order to empirically determine the effect of probe length on signal intensities, microarrays with oligonucleotides of different lengths were used to monitor gene expression at a whole genome level. To determine what length of oligonucleotide is a better alternative to PCR-generated probes, the performance of oligonucleotide probes was systematically compared to that of their PCR-generated counterparts for 96 genes from Shewanella oneidensis MR-1 in terms of overall signal intensity, numbers of detected genes, specificity, sensitivity and differential gene expression under experimental conditions. Hybridizations conducted at 42 C, 45 C, 50 C, and 60 C indicated that good sensitivities were obtained at 45 C for oligonucleotide probes in the presence of 50% formamide, under which conditions specific signals were detected by both PCR and oligonucleotide probes. Signal intensities increased as the length of oligonucleotide probes increased, and the 70mer oligonucleotide probes produced similar signal intensities and detected a similar number of ORFs compared to the PCR probes. cDNA, 70mer, 60mer and 50mer arrays had detection sensitivities at 5.0, 25, 100 and 100 ng of genomic DNA, or an approximately equivalent of 1.9 x 10{sup 6}, 9.2 x 10{sup 6}, 3.7 x 10{sup 7} and 3.7 x 10{sup 7} copies, respectively when the array was hybridized with genomic DNA. To evaluate differential gene expression under experimental conditions, S. oneidensis MR-1 cells were exposed to low or high pH conditions for 30 and 60 min, and the transcriptional profiling detected by oligonucleotide probes (50mer, 60mer, and 70mer) was closely correlated with that detected by the PCR probes. The results demonstrated that 70mer oligonucleotides can achieve the most comparable performance with PCR-generated probes. We have analyzed expression data as D. vulgaris transitioned during electron donor depletion. As the cells transitioned from exponential to stationary-phase a majority of the down-expressed genes were involved in translation and transcription, and this trend continued in the remaining time points. Interestingly, most phage-related genes were up-expressed at the onset of stationary-phase. This result suggested that nutrient depletion may impact community dynamics and DNA transfer mechanisms of sulfate-reducing bacteria via phage cycle. The putative feoAB system (in addition to other presumptive iron metabolism genes) was significantly up-expressed, and suggested the possible importance of Fe{sup 2+} acquisition under metal-reducing conditions. Namely, that iron availability should be considered when sulfate-reducing conditions are stimulated in the subsurface for heavy metal reduction.

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.

54 ENVIRONMENTAL SCIENCES↗

Construction and testing of the scintillating fibre trackers for MICE

The discovery of neutrino mass through experimental evidence of neutrino oscillations at the end of the last century has provided the first proof that the Standard Model of particle physics is incomplete. To be able to extend the Standard Model to incorporate massive neutrinos first requires many theoretical uncertainties surrounding the particle and its interactions to be understood. Therefore, a dedicated experimental programme is needed over the coming decades to provide precision measurements of the neutrino oscillation parameters and also a possible measurement of CP violation in the lepton sector, which could have astrophysical consequences. An intense source of neutrinos is required to achieve these precision measurements and the leading contender proposed to provide this neutrino beam, is the Neutrino Factory. Before a Neutrino Factory facility can be realised, a number of technological challenges need to be evaluated and understood first. One of which, is reduce the large phase space volume (emittance) of the initial muon beam, which is eventually stored and through decay provides the neutrino beam. Ionisation cooling is the chosen method to achieve this and the Muon Ionisation Cooling Experiment (MICE) at Rutherford Laboratory in the UK, is required to demonstrate ionisation cooling and its feasibility for a Neutrino Factory. To demonstrate ionisation cooling, a section of a cooling channel will be constructed and single-particle measurements of emittance of a muon beam before and after the cooling channel from particle spectrometers will be compared. To measure emittance accurately requires precision measurements of the momenta and spatial coordinates at the spectrometers by tracking devices in a uniform magnetic field. The focus of this thesis is based around the construction and testing of the MICE tracker(s), including a study of its simulated performance and also construction and testing of a prototype.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Plant Bioengineering Atlas: A Knowledge Graph of Genes, DNA Constructs, and Plant Traits.

Plant bioengineering has generated tens of thousands of genotype-to-phenotype relationships, but this knowledge remains fragmented across narrative literature and difficult to use computationally. Inconsistent descriptions of DNA constructs, host species, and traits, including variable species names, omitted regulatory elements, and inconsistent gene symbols, impede data reuse, comparative analysis, and design-build-test-learn cycles. Here, we present the Plant Bioengineering Atlas, a literature-mined, ontology-grounded knowledge base assembled using an artificial intelligence (AI)-aided extraction pipeline. A large language model parsed open-access primary research articles to generate structured, provenance-anchored records of engineered genes, modification types, promoter-gene-terminator constructs, host species, target traits, and reported phenotypes, with every record traceable to its source. The current release contains 14,358 curated records encompassing 6,998 distinct genes across 436 plant species from 6,452 papers published between 2000 and 2026. Corpus analysis reveals that experiments are concentrated in a small group of model and crop species, disease and pathogen resistance is the most frequently engineered trait class, and constitutive regulatory parts (particularly the CaMV 35S promoter and NOS terminator) remain pervasive. Two in five records omit one or both flanking regulatory elements (i.e., promoter and terminator), while only 23.4% describe cassettes in which both elements resolve to named part classes, exposing a systematic reproducibility gap. We organize these data into a knowledge graph linking genes, constructs, species, and traits; provide access through an interactive web portal; and propose an AI-compatible documentation standard for AI-ready reporting. The Plant Bioengineering Atlas provides a foundation for data-driven hypothesis generation and AI-aided plant biodesign.

, Genes, DNA Constructs↗

Construction of an unyielding target for large horizontal impacts.

Sandia National Laboratories has constructed an unyielding target at the end of its 2000-foot rocket sled track. This target is made up of approximately 5 million pounds of concrete, an embedded steel load spreading structure, and a steel armor plate face that varies from 10 inches thick at the center to 4 inches thick at the left and right edges. The target/track combination will allow horizontal impacts at regulatory speeds of very large objects, such as a full-scale rail cask, or high-speed impacts of smaller packages. The load-spreading mechanism in the target is based upon the proven design that has been in use for over 20 years at Sandia's aerial cable facility. That target, with a weight of 2 million pounds, has successfully withstood impact forces of up to 25 million pounds. It is expected that the new target will be capable of withstanding impact forces of more than 70 million pounds. During construction various instrumentation was placed in the target so that the response of the target during severe impacts can be monitored. This paper will discuss the construction of the target and provide insights on the testing capabilities at the sled track with this new target.

33 ADVANCED PROPULSION SYSTEMS↗

Construction progress of the RHIC electron lenses

In polarized proton operation the RHIC performance is limited by the head-on beam-beam effect. To overcome this limitation two electron lenses are under construction. We give an overview of the construction progress. Guns, collectors and the warm electron beam transport solenoids with their power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of the gun, collector and some of the instrumentation. The infrastructure is being prepared for installation, and simulations continue to optimize the performance.

43 PARTICLE ACCELERATORS↗

The Construction of the Konrad Repository - Status and Perspective - 13034

Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

54 ENVIRONMENTAL SCIENCES↗

Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successes and Lessons Learned in the Design, Construction and Use of a Tool for Sampling the WR-1 Reactor Core - 1900z

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on an organically cooled, heavy water moderated nuclear reactor in the world, Whiteshell Reactor 1 (WR-1). WR-1 was safely shut down in 1985, de-fueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed In Situ Decommissioning of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, pressure tubes) was necessary to verify inventory estimates and neutron activation models produced circa 1992. The Fuel Channels of WR-1 (pressure tubes) were expected to be the most activated components of the reactor core, and to account for about 60% of the reactor core inventory. The interior surface of the fuel channel is also the most readily accessible surface within the reactor core. As such the decision was made to collect a sample of one of each of 3 Fuel Channel material types (Stainless Steel, Zr-2.5Nb, Ozhenite) for comparison to modelled estimates of neutron activation of various core materials. The expected dose rates from the samples were between 5 and 100 mSv (500-10,000 mrem) on contact based on a 200 mg sample. Sampling the Fuel Channels required verification the Fuel Channel was drained of organic coolant, removal of residual organic coolant from the Fuel Channel wall, removal of material from the interior surface of the Fuel Channel at the centerline of flux (∼25' below the operator position), and extraction of that material from the core. Several options for existing tooling and technologies, including hydraulic scrapers, and horizontal drill technologies, were looked at for their applicability to WR-1. While suitable approaches to higher radiation field sample collection, they were overly complex, costly and time consuming for the configuration at WR-1. In an effort to reduce costs, and to simplify the sampling process, a specialized and simple tool was developed to mechanically scrape a small sample of the interior wall of the Fuel Channels, collect the sample into a vial, and remove the sample from the core for analysis. The tool was designed, constructed, tested and implemented in the field entirely by Canadian Nuclear Laboratories Staff. The tool required no powered components, or electronic guidance or measurements; and was designed and constructed for a fraction of the cost of other commercially available technologies for sample collection within reactor cores. The samples were successfully collected without any injuries, contamination events or equipment failures. The tool remains operational in the event additional sampling is required. This paper provides additional details of the design, construction, testing and use of the tool and the successes and lessons learned during the various stages of design and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗