Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy↗

Wisconsin SRF Electron Gun Commissioning

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

43 PARTICLE ACCELERATORS↗

Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

Spata, Michael F.↗

Commissioning and Early Operation Experience of the NSLS-II Storage Ring RF System

The National Synchrotron Light Source II (NSLS-II) is a 3 GeV electron X-ray user facility commissioned in 2014. The storage ring RF system, essential for replenishing energy loss per turn of the electrons, consists of digital low level RF controllers, 310 kW CW klystron transmitters, CESR-B type superconducting cavities, as well as a supporting cryogenic system. Here we will report on RF commissioning and early operation experience of the system for beam current up to 200mA.

43 PARTICLE ACCELERATORS↗

Commissioning Simulations for the APS Upgrade Lattice

A hybrid seven-bend-achromat lattice that features very strong focusing elements and a relatively small vacuum chamber has been proposed for the APS upgrade. Achieving design lattice parameters during commissioning will need to be accomplished quickly in order to minimize dark time for APS users. The paper will describe start-to-end simulation of the machine commissioning beginning from first-turn trajectory correction, progressing to orbit and lattice correction, and culminating in evaluation of the nonlinear performance of the corrected lattice

Sajaev, V.↗

Commissioning and First Results of the Electron Beam Profiler in the Main Injector at Fermilab

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. A device such as this is already in use at the Spallation Neutron Source at ORNL and a similar device has been installed in the Main Injector at Fermilab. Commissioning of the device is in progress with the goal of having it operational by the end of the year. The status of the commissioning and initial results will be presented

Thurman-Keup, R.↗

Commissioning and operation of the horizontal test apparatus at SNS

The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) has built, commissioned and operated a Horizontal Test Apparatus (HTA) vessel in the Radiofrequency Test Facility (RFTF) test cave. It can be operated at 4.5 K using the independent Cryogenic Test Facility (CTF). The HTA is designed to be a single cavity version of an SNS cryomodule with the ability to demount and replace the cavity. It provides the functionality for testing a single dressed SNS medium or high beta Superconducting Radiofrequency (SRF) cavity. The HTA is currently being used in support of R&D for in-situ plasma processing of the cavity's inner niobium surface. The design and commissioning of the HTA at 4.5 K will be presented as well as results from operating the HTA including cool-down, warm-up and steady state operations. Results from plasma processing a warm SCRF cavity in-between cold HTA tests will also be reported.

Kim, Sang-Ho↗

First Commissioning of a Cryogenic Distillation Column for Low Radioactivity Underground Argon

We report on the performance and commissioning of a cryogenic distillation column for low radioactivity underground argon at Fermi National Accelerator Laboratory. The distillation column is designed to accept a mixture of argon, helium, and nitrogen and return pure argon with a nitrogen contamination less than 10 ppm. In the first commissioning, we were able to run the distillation column in a continuous mode and produce argon that is 99.9% pure. After running in a batch mode, the argon purity was increased to 99.95%, with 500 ppm of nitrogen remaining. The efficiency of collecting the argon from the gas mixture was between 70% and 81%, at an argon production rate of 0.84-0.98 kg/day.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Topical Report: Kemper County IGCC Commissioning and Startup Report

The Kemper County IGCC plant was a lignite-fueled 2 x 1 Integrated Gasification Combined-Cycle (IGCC) facility that demonstrated the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company, KBR, Inc. (KBR), and the U.S. Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Ala. The plant is owned by Mississippi Power Company (MPC) and has a calculated nameplate capacity of 830 MW with a peak net output of 582 MW. As a result of advanced emissions control equipment, the facility is designed to produce marketable products of ammonia (NH 3 ), sulfuric acid (H 2 SO 4 ), and carbon dioxide (CO 2 ). The plant is designed to capture 65 percent of the carbon producing a CO 2 stream for use in enhanced oil recovery (EOR), making the plant carbon emissions comparable to those of a natural gas-fired combined cycle power plant. This report describes the unit commissioning activities from the end of construction through first coal operations to the gasifier. These activities include precommissioning planning, commissioning of major equipment, and operation of processes leading up to first coal feed.

01 COAL, LIGNITE, AND PEAT↗

Automated commissioning and inspection for PV systems

An electric system includes a local power controller and solar panel system that includes a plurality of solar modules on one or more branch circuits. A method for commissioning the electric system includes an installer using a commissioning device to send and receive information from a remote system and the local power controller performing an automatic self-test of the electric system. The results of the self-test may be packaged with photographs and measurements of the electric system and sent to a remote system where an inspector can inspect the electric system remotely. After receiving approval by the inspector, the local power controller may automatically activate each branch circuit of the electric system and thus enabling the electric system to generate electricity.

14 SOLAR ENERGY↗

Commissioning Trigger for the SpinQuest/E1039 Experiment

The SpinQuest experiment at Fermilab aims to measure the Sivers asymmetry for the light antiquarks in the nucleon using the Drell-Yan process. If the Sivers asymmetry is not zero, we will have found evidence for non-zero orbital angular momentum of light antiquarks. The commissioning of the SpinQuest experiment has two phases. First, we will trigger on cosmic ray muons to understand the performance of the SpinQuest detector which comprises hodoscopes, wire chambers, and proportional tubes. Second, we will use the 120 GeV Main Injector proton beam to test all the detectors more thoroughly and analyze the data to get prepared for physics running. This poster will present the structure of the commissioning trigger, the timing calibration, and the measured performance of the hodoscopes using cosmic rays.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

Commissioning & Characterization of Magnetized Gridded Thermionic Electron Source

Collaborative efforts to design and fabricate a magnetized gridded thermionic electron source have been conducted between Xelera and Jefferson Lab. Commissioning and characterization of an electron gun fabricated by Xelera was performed to benchmark the viability of future electron source designs and capabilities. The work involved simulation, installation, trouble-shooting, modifications of the design, commissioning, characterization, and magnetization of the electron beam produced. A specially designed cavity as well as novel diagnostic tools and methods were developed, implemented, and experimentally tested. Finally, the gun was used to demonstrate a previously unachieved current of magnetized electron beam from a gridded thermionic source of this uniquely compact size. This thesis addresses the following scientific and technological challenges: building a compact gridded thermionic electron source, producing high current magnetized electron beam, and demonstrating novel characterization measurements for magnetized beam.

Stefani, Mark↗

Monitoring Based Commissioning: Step-by-Step Approach to Implementation in Chiller Plants

Chilled water systems consume a significant portion of the energy in manufacturing, and inefficient operation could significantly influence utility bills and the environmental footprint of a facility. One way to ensure long-term energy-efficient plant operation is to ensure that chilled water system equipment, such as chillers, cooling towers, and pumps, are running at their best. Periodic operational assessments help to meet efficiency objectives for cooling plants. However, occasional set point and operational changes resulting from short-term fluctuations cause the plant operation to deviate from optimal. These changes accumulate over time, and operational efficiency deteriorates. Significant energy efficiency improvement potential in chilled water systems can be achieved by operational changes alone. Recent developments in information technology and the industrial internet of things data processing ability have overcome traditional problems and given rise to a new paradigm: monitoring-based commissioning (MBCx). Commissioning platforms and fault detection and diagnostics capabilities have evolved over time and presented more sophisticated abilities to efficiently control process cooling plants. The typical architectures of the MBCx process and a detailed approach to implement the process for chilled water systems are presented. A case study highlighting the energy-and cost-savings potential of MBCx systems is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Construction of the sPHENIX Detector and Status of Its Commissioning

sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗