Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CHP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Regulatory Reform to Promote Clean Energy: The Potential of Output-Based Emissions Standards

Barriers to industrial energy-efficient technologies hinder their use. A number of EPA analyses and industrial experts have found that the utilization of input-based emissions standards (measured in parts-per-million or pounds/MMBtu) in the Clean Air Act creates a regulatory barrier to the installation and deployment of technologies that emit fewer criteria pollutants and use energy more efficiently. Changing emission management strategies to an output-based emissions standard (measured in tons of pollutant emitted) is a way to ameliorate some of these barriers. Combined heat and power (CHP) is one of the key technologies that would see increased industrial application if the emissions standards were modified. Many states have made this change since the EPA first approved it in 2000, although direction from the Federal government could speed implementation modifications. To analyze the national impact of accelerated state adoption of output-based standards on CHP technologies, this paper uses detailed National Energy Modeling System (NEMS) and spreadsheet analysis illustrating two phased-in adoption scenarios for output-based emissions standards in the industrial sector. Benefit/cost metrics are calculated from a private and public perspective, and also a social perspective that considers the criteria and carbon air pollution emissions. These scenarios are compared to the reference case of AEO 2010 and are quite favorable, with a social benefit-cost ratio of 16.0 for a five-year phase-in scenario. In addition, the appropriateness of the Federal role, applicability, technology readiness, and administrative feasibility are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

East Kansas Agri-Energy, LLC

This is a combined heat and power (CHP) project profile on a 1.6 MW CHP application at East Kansas Agri-Energy, LLC in Garnett, Kansas.

AMO↗

Crave Brothers Farm

This is a combined heat and power (CHP) project profile on a 633 kW biogas CHP application at Crave Brothers Farm in Waterloo, Wisconsin.

AMO↗

SC Johnson Waxdale Plant

This is a combined heat and power (CHP) project profile on a 6.4 MW CHP application at SC Johnson Waxdale Plant in Racine, Wisconsin.

AMO↗

One Market Plaza

This is a combined heat and power (CHP) project profile on a 1.5 MW CHP system at One Market Plaza in San Francisco, California.

Combined Heat and Power↗

Integrated Combined Heat and Power/Advanced Reciprocating Internal Combustion Engine System for Landfill Gas to Power Applications

Gas Technology Institute will collaborate with Integrated CHP Systems Corporation, West Virginia University, Vronay Engineering Services, KAR Engineering Associates, Pioneer Air Systems, and Energy Concepts Company to recover waste heat from reciprocating engines. The project will integrate waste heat recovery along with gas clean-up technology system improvements. This will address fuel quality issues that have hampered expanded use of opportunity fuels such as landfill gas, digester biogas, and coal mine methane. This will enable increased application of CHP using renewable and domestically derived opportunity fuels.

Fact Sheet↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Low-Temperature Geothermal Play Fairway Analysis for the Denver Basin: Preprint

This project is part of a national initiative to showcase the benefits of incorporating low-temperature geothermal resource assessment into the deployment of geothermal heating and cooling (GHC), combined heat and power (CHP), and geothermal direct use (GDU) technologies. The initiative was established to accelerate the country's decarbonization efforts by identifying potential for low-temperature geothermal resource utilization (< 150 Degrees Celsius, i.e., GHC, CHP, and GDU) in selected sedimentary basins with numerous population centers. The Play Fairway Analysis (PFA) methodologies in this study were adapted from previous PFA investigations of sedimentary basin geothermal play types (SBGPTs) that evaluated the potential for low-temperature resources (< 150 Degrees Celsius). Workflows, relevant datasets, python code, common and composite geological criteria maps are utilized to develop low-temperature geothermal resource favorability maps for the Denver Basin, a sedimentary basin spanning Colorado, Nebraska, and Wyoming. The replication of these methodologies in other SBGPTs can evaluate potential for low-temperature resources. To facilitate future assessment of low-temperature geothermal resources in SBGPTs, this project provides PFA workflows, data, tools, and favorability maps that will ultimately support the utilization of low-temperature geothermal resources in sedimentary basins.

Denver Basin↗

Low-Temperature Geothermal Play Fairway Analysis for the Denver Basin

This project is part of a national initiative to showcase the benefits of incorporating low-temperature geothermal resource assessment into the deployment of geothermal heating, combined heat and power (CHP), and geothermal direct-use (GDU) technologies. The initiative was established to accelerate the country's decarbonization efforts by identifying potential for low-temperature geothermal resource utilization (<150 degrees C, e.g., CHP and GDU) in selected sedimentary basins with numerous population centers. The play fairway analysis (PFA) methodologies in this study were adapted from previous PFA investigations of sedimentary basin geothermal play types (SBGPTs) that evaluated the potential for low-temperature resources (<150 degrees C). Workflows, relevant datasets, a new Python library, and common and composite geological criteria maps are utilized to develop low-temperature geothermal resource favorability maps for the Denver Basin, a sedimentary basin spanning Colorado, Nebraska, and Wyoming. The replication of these methodologies in other SBGPTs can evaluate potential for low-temperature resources. To facilitate future assessment of low-temperature geothermal resources in SBGPTs, this project provides PFA workflows, data, tools, and favorability maps that will ultimately support the utilization of low-temperature geothermal resources in sedimentary basins.

combined heat and power↗

Investment and Upgrade in Distributed Generation under Uncertainty

The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only efficiency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attraction of on-site generation. Nevertheless, a microgrid contemplatingthe installation of gas-fired DG has to be aware of the uncertainty in the natural gas price. Treatment of uncertainty via real options increases the value of the investment opportunity, which then delays the adoption decision as the opportunity cost of exercising the investment option increases as well. In this paper, we take the perspective of a microgrid that can proceed in a sequential manner with DG capacity and HX investment in order to reduce its exposure to risk from natural gas price volatility. In particular, with the availability of the HX, the microgrid faces a tradeoff between reducing its exposure to the natural gas price and maximising its cost savings. By varying the volatility parameter, we find that the microgrid prefers a direct investment strategy for low levels of volatility and a sequential one for higher levels of volatility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Greenhouse Gas Abatement with Distributed Generation in California's Commercial Buildings

Lawrence Berkeley National Laboratory (LBL) is working with the California Energy Commission (CEC) to determine the role of distributed generation (DG) in greenhouse gas reductions. The impact of DG on large industrial sites is well known, and mostly, the potentials are already harvested. In contrast, little is known about the impact of DG on commercial buildings with peak electric loads ranging from 100 kW to 5 MW. We examine how DG with combined heat and power (CHP) may be implemented within the context of a cost minimizing microgrid that is able to adopt and operate various smart energy technologies, such as thermal and photovoltaic (PV) on-site generation, heat exchangers, solar thermal collectors, absorption chillers, and storage systems. We use a mixed-integer linear program (MILP) that has the minimization of a site's annual energy costs as objective. Using 138 representative commercial sites in California (CA) with existing tariff rates and technology data, we find the greenhouse gas reduction potential for California's commercial sector. This paper shows results from the ongoing research project and finished work from a two year U.S. Department of Energy research project. To show the impact of the different technologies on CO2 emissions, several sensitivity runs for different climate zones within CA with different technology performance expectations for 2020 were performed. The considered sites can contribute between 1 Mt/a and 1.8 Mt/a to the California Air Resources Board (CARB) goal of 6.7Mt/a CO2 abatement potential in 2020. Also, with lower PV and storage costs as well as consideration of a CO2 pricing scheme, our results indicate that PV and electric storage adoption can compete rather than supplement each other when the tariff structure and costs of electricity supply have been taken into consideration. To satisfy the site's objective of minimizing energy costs, the batteries will be charged also by CHP systems during off-peak and mid-peak hours and not only by PV during sunny on-peak hours.

14 SOLAR ENERGY↗

State-Led Combined Heat and Power Initiatives

This issue brief examines how portfolio standards, financial incentives, and deployment activities can be implemented to encourage CHP's use and provides several examples of ongoing policies and programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2022 Combined Heat and Power/District Energy System Portfolio Meeting (Summary Report)

The U.S. Department of Energy’s (DOE’s) Advanced Manufacturing Office held the 2022 Combined Heat and Power & District Energy System Portfolio Meeting on June 7–9, 2022. The meeting brought together approximately 50 researchers from industry, national laboratories, and research institutes. The purpose of the meeting was for DOE to understand the performance of the projects being sponsored through the CHP program and the status of the technology development, which informs future program planning. This report summarizes the presentations that took place at this event.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant

This work considers the possibilities of an air-based Brayton cycle to provide the power, heating and cooling needs of fast-food restaurants. A model of the cycle based on conventional turbomachinery loss coefficients is formulated. The heating, cooling and power capabilities of the cycle are extracted from simulation results. Power and thermal loads for restaurants in Knoxville, TN and in International Falls, MN, are considered. It is found that the cycle can meet the loads by setting speed and mass flow-rate apportionment between the power and cooling functional sections. The associated energy costs appear elevated when compared to the cost of operating individual components or a more conventional, absorption-based CHP system. Lastly, a first-order estimate of capital investments is provided. Suggestions for future work whereby the operational costs could be reduced are given in the conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The anode supported internal cathode tubular solid oxide fuel cell: Novel production of a cell geometry for combined heat and power applications

An effective strategy for generating combined heat and power (CHP) systems is to use the combustion of hydrocarbons to provide fuel reforming and heat production for solid oxide fuel cell (SOFC) operation. Though tubular SOFCs (tSOFCs) are well suited to the thermal cycling associated with combustion systems, they have a geometric limitation which requires significant alteration to the combustion chamber. These alterations can be eliminated by producing an anode supported internal cathode-tSOFC (IC-tSOFC) which can be directly integrated into the chamber with minimal alterations. Novel methods used to produce IC-tSOFCs are discussed in this work. Scanning electron microscopy (SEM) and performance characterization are used to analyze fabricated cells. Finally, with a peak power density of 369 mW∙cm –2 , and an open circuit voltage (OCV) of 0.98 V, it is confirmed that novel production methods for IC-tSOFCs have been successful.

08 HYDROGEN↗

Independent Analysis of Real-Time, Measured Performance Data From Microcogenerative Fuel Cell Systems Installed in Buildings

Pacific Northwest National Laboratory (PNNL) is working with industry to independently monitor up to 15 distinct 5 kW-electric (kWe) combined heat and power (CHP) high temperature (HT) proton exchange membrane (PEM) fuel cell systems (FCSs) installed in light commercial buildings. This research paper discusses an evaluation of the first six months of measured performance data acquired at a 1 s sampling rate from real-time monitoring equipment attached to the FCSs at building sites. Engineering performance parameters are independently evaluated. Based on an analysis of the first few months of measured operating data, FCS performance is consistent with manufacturer-stated performance. Initial data indicate that the FCSs have relatively stable performance and a long-term average production of about 4.57 kWe of power. This value is consistent with, but slightly below, the manufacturer's stated rated electric power output of 5 kWe. The measured system net electric efficiency has averaged 33.7%, based on the higher heating value (HHV) of natural gas fuel. This value, also, is consistent with, but slightly below, the manufacturer's stated rated electric efficiency of 36%. The FCSs provide low-grade hot water to the building at a measured average temperature of about 48.4 degrees C, lower than the manufacturer's stated maximum hot water delivery temperature of 65 degrees C. The uptime of the systems is also evaluated. System availability can be defined as the quotient of total operating time compared to time since commissioning. The average values for system availability vary between 96.1 and 97.3%, depending on the FCS evaluated in the field. Performance at rated value for electrical efficiency (PRVeff) can be defined as the quotient of the system time operating at or above the rated electric efficiency and the time since commissioning. The PRVeff varies between 5.6% and 31.6%, depending on the FCS field unit evaluated. Performance at rated value for electrical power (PRVp) can be defined as the quotient of the system time operating at or above the rated electric power and the time since commissioning. PRVp varies between 6.5% and 16.2%. Performance at rated value for electrical efficiency and power (PRVt) can be defined as the quotient of the system time operating at or above both the rated electric efficiency and the electric power output compared to the time since commissioning. PRVt varies between 0.2% and 1.4%. Optimization to determine the manufacturer rating required to achieve PRVt greater than 80% has been performed based on the collected data. For example, for FCS Unit 130 to achieve a PRVt of 95%, it would have to be down-rated to an electrical power output of 3.2 kWe and an electrical efficiency of 29%. The use of PRV as an assessment metric for FCSs has been developed and reported for the first time in this paper. For FCS Unit 130, a maximum decline in electric power output of approximately 18% was observed over a 500 h period in Jan. 2012.

fuel cell, combined heat and power, CHP, PEM, prot↗

Design-Point Techno-Economics of Brayton Cycle PTES for Combined Heat and Power

Pumped thermal energy storage (PTES) systems are grid batteries that use heat pumps to create both hot and cold thermal energy stores when there is excess electricity and then use a power cycle to convert the thermal energy into electricity when there is demand for electricity. In normal operation, Joule-Brayton PTES discharges low-grade heat at temperatures useful for thermal energy consumers like district and industrial heating. Furthermore, PTES designs, like conventional combined heat and power (CHP) technology, can be modified to sacrifice some round-trip efficiency RTE to increase the temperature of heat rejection. This paper uses design-point performance and cost models that provide a detailed understanding of the efficiency and cost trade-offs of rejecting heat at various temperatures in ideal-gas Brayton PTES configurations. First, we keep the heat rejection in its nominal location in the PTES system: in the discharge cycle after the low-pressure exit of the recuperator before the cold-storage heat exchanger. Next, we move the heat rejection to the discharge turbine exit. We define design-point metrics that isolate both the cost and performance penalty associated with the hotter heat rejection and attribute it exclusively to the heat economic metrics. Finally, we estimate the performance of electric heater technology to generate heat at equivalent temperatures. We find that the levelized cost of heat, including the cost of thermal energy storage (TES) buffering the PTES and heat off-taker, compares favorable versus electric technologies and is less than the cost of natural gas for low temperature scenarios and competitive with the cost of natural gas in some regions of the contiguous United States in high temperature scenarios.

CHP↗

Biogas and Fuel Cells Workshop Summary Report: Proceedings from the Biogas and Fuel Cells Workshop

The National Renewable Energy Laboratory (NREL), in association with the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), held a Biogas and Fuel Cells Workshop on June 11–13, 2012, in Golden, Colorado, to discuss biogas and waste-to energy technologies for fuel cell applications. The meeting was spearheaded by the Fuel Cell Technologies Program in coordination with the Biomass Program. The overall objective was to identify opportunities for coupling renewable biomethane with highly efficient fuel cells to produce electricity; heat; combined heat and power (CHP); or combined heat, hydrogen and power (referred to as CHHP or “trigeneration”) for stationary or motive applications. The workshop focused on biogas sourced from wastewater treatment plants (WWTPs), landfills, and industrial facilities that generate or process large amounts of organic waste, including large biofuel production facilities (biorefineries).

08 HYDROGEN↗