Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

DRAFT: Accident Tolerant Fuels Draft Implementation Plan

The ATF Implementation Plan integrates DOE’s objectives and goals with the national laboratory’s expertise and infrastructure in support of the technology development by three industry partners. DOE’s plan is to develop advanced LWR fuels with enhanced accident tolerance in response to the Congressional request and to install a lead fuel assembly containing accident tolerant fuel technology in a U.S. commercial nuclear power plant by 2022. DOE has three contracts in place with each of the principle US commercial nuclear fuel vendors in support of ATF research and development, AREVA Services LLC, General Electric, and Westinghouse LLC. The purpose of the ATF Implementation Plan is to describe the technology development and progress required to insert one (or possible two) concepts as a LFR or LFA in a commercial LWR by 2022. In particular, this document shows the integration between the functional documents guiding ATF development and provides a rough order of magnitude estimate of the required budget from FY2016 through FY2022. It is expected that after FY2022, the needed budget request would significantly decrease as works transitions from Phase 2 to Phase 3, corresponding to a decrease in DOE project responsibility and an increase in industry responsibility and associated funding support.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Energy Savings Performance Contracting for Small Projects

Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. ESPC can help public-sector planners use tomorrow’s energy savings to fund today's facility and infrastructure upgrades. This resource highlights strategies and case studies for implementing ESPC in smaller towns, rural counties, and small school districts to complete energy upgrades and maximize energy and cost savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

APS Science 2009.

It is my pleasure to introduce the 2009 annual report of the Advanced Photon Source. This was a very good year for us. We operated with high reliability and availability, despite growing problems with obsolete systems, and our users produced a record output of publications. The number of user experiments increased by 14% from 2008 to more than 3600. We congratulate the recipients of the 2009 Nobel Prize in Chemistry-Venkatraman Ramakrishnan (Cambridge Institute for Medical Research), Thomas Steitz (Yale University), and Ada Yonath (Weizmann Institute) - who did a substantial amount of this work at APS beamlines. Thanks to the efforts of our users and staff, and the ongoing counsel of the APS Scientific Advisory Committee, we made major progress in advancing our planning for the upgrade of the APS (APS-U), producing a proposal that was positively reviewed. We hope to get formal approval in 2010 to begin the upgrade. With advocacy from our users and the support of our sponsor, the Office of Basic Energy Sciences in the Department of Energy (DOE) Office of Science, our operating budgets have grown to the level needed to more adequately staff our beamlines. We were also extremely fortunate to have received $7.9 M in American Recovery and Reinvestment Act ('stimulus') funding to acquire new detectors and improve several of our beamlines. The success of the new Linac Coherent Light Source at Stanford, the world's first x-ray free-electron laser, made us particularly proud since the undulators were designed and built by the APS. Among other highlights, we note that more than one-quarter of the 46 Energy Frontier Research Centers, funded competitively across the U.S. in 2009 by the DOE, included the Advanced Photon Source in their proposed work, which shows that synchrotron radiation, and the APS in particular, are central to energy research. While APS research covers everything from fundamental to applied science (reflected by the highlights in this report), the challenge of sustainable energy provides an opportunity for expanded involvement with industrial research. We were privileged to recruit several outstanding new leaders at the APS. Linda Young, from Argonne's Chemical Sciences Division, became the new Director of the X-ray Science Division (XSD). Chris Jacobsen (from Stony Brook University) has been added to Linda's team as an XSD Associate Division Director, joining George Srajer. Alexander (Sasha) Zholents (formerly of Berkeley Lab) became Director of the Accelerator Systems Division. Sasha is the inventor of the short-pulse x-ray scheme that we plan to implement in the APS-U to obtain very high average brightness, broadband, 1-ps x-ray pulses. Walter Lowe (formerly of Howard University) has taken a new position as senior advisor for outreach and development of the user community. Walter's role is to increase the diversity of the user community (with diversity read broadly to include users, institutions, and technical disciplines that are underrepresented at APS). Walter is also leading an effort to increase access for industrial users. I am confident that we have in place a great team to help our users and the APS take fullest advantage of the APS-U opportunity. In planning with users for the proposed APS-U, we focused on the need to study 'real materials under real conditions in real time' on spatial and temporal scales unavailable today. Only by studying materials as they are made-or as they perform-in difficult environments can we solve the grand challenge of higher-performance, sustainable materials for energy and health. The proposed APS-U will improve the brightness of penetrating x-rays produced by the APS over 100 times, and support our efforts in developing state-of-the-art instruments to address these challenges.

43 PARTICLE ACCELERATORS↗

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.↗

Final Report for Phase I Northern California CO2 Reduction Project

On June 8, 2009, the U. S. Department of Energy's National Energy Technology Laboratory released a Funding Opportunity Announcement (DE-FOA 0000015) with the title, Recovery Act: Carbon Capture and Sequestration from Industrial Sources and Innovative Concepts for Beneficial CO{sub 2} Use. C6 Resources (C6), an affiliate of Shell Oil Company, responded with a proposal for Technology Area 1: Large-scale industrial carbon capture and sequestration (CCS) projects from industrial sources. As DOE Federally Funded Research and Development Center (FFRDC) Contractors, Lawrence Livermore National Laboratory (LBNL) and Lawrence Berkeley National Laboratory (LLNL) proposed to collaborate with C6 and perform technical tasks, which C6 included in the C6 proposal, titled the Northern California CO{sub 2} Reduction Project. The proposal was accepted for Phase I funding and C6 received DOE Award DEFE0002042. LLNL and LBNL each received Phase I funding of $200,000, directly from DOE. The essential task of Phase I was to prepare a proposal for Phase II, which would be a five-year, detailed technical proposal, budget, and schedule for a complete carbon capture, transportation, and geologic storage project, with the objective of starting the injection of 1 million tons per year of industrial CO2 by the end of FY2015. LLNL and LBNL developed technical proposals (and DOE Field Work Proposals [FWPs]) for many aspects of the geologic testing and CO{sub 2} monitoring that were included in the C6 Phase II proposal, which C6 submitted by the deadline of April 16, 2010. This document is the Final Report for LLNL's Phase I efforts and is presented in two parts. Part 1 is the complete text of the technical proposal provided to C6 by LLNL and LBNL for inclusion in the C6 Phase II proposal. Because of space limitations, however, C6 may not have included all of this information in their proposal. In addition to developing the proposal presented below, LLNL's Bill Foxall and Laura Chiarmonte, in collaboration with LBNL, undertook preliminary technical work evaluating the potential for induced seismicity in Solano County. Part 2 presents technical work preformed during Phase I in the development of a preliminary Certification Framework: Leakage Risk Assessment for CO{sub 2} Injection at the Montezuma Hills Site, Solano County, California, co-authored by LLNL and LBNL collaborators.

58 GEOSCIENCES↗

FINAL SCIENTIFIC REPORT Southwest United States of America – Distributed Technology Training Consortia (SWUSA-DTTC) Contract Number: DE-EE0006339

The Southwest United States of America – Distributed Technology Training Consortia (SWUSA-DTTC) leveraged the highest concentration of renewable resources in the U.S. as well as operation of the leading independent microgrid installations and other distributed technologies to collect and analyze real-time data streams, advance power system simulations and analysis, identify educational and training gaps and develop solutions-focused curricula. The SWUSA-DTTC consortium posed a unique collaboration between universities and utilities to ensure that classes were focused on subjects and topics of interest to the utilities and ones that had practical benefit related to the preparedness for accommodating high penetration of solar and other distributed energy technologies. This approach to have a close collaboration and shared effort to develop the course content and curriculum is unique and a significant departure from conventional course development. This coursework and training was intended to endure over a long time horizon (10-20 year time frame), and include professionals over the entire Southwest region and the rest of the US, and even outreach into foreign countries. Project Objectives In order to support the increase in power systems research, development, and analytical capacity, the SWUSA-DTTC brought together respected professors in Power Systems education, student/professor research and development, and valuable industry and utility experience. Through this program, the partnered universities created and/or modified existing curricula available to students and professionals in the form of university courses, short courses, videos, consortia-led training, and online materials. During this time, the supporting vendors and utilities provided the SWUSA-DTTC with technical advisory roles as well as providing input and feedback in terms of utility and related energy industry needs. The goals were to create power and energy systems training, curricula, and workforce preparedness through the inclusion of data collection and analysis, power systems expertise, and application-specific training activities which build on fundamental principles, modeling and simulation tools, field-immersed training and methods of performance validation. The outcome of the program was to result in better prepared and greater number of graduates ready to contribute to the field of power systems which depend upon the safe, reliable and efficient generation sources which make up an increasingly diverse mix of renewable power. Additionally, the program was to deliver critical training modules which are intended to support mid-career professionals and be woven into utility training programs used all over the country. Discontinuation Summary On September 29, 2014, Electricore received notice of discontinuation of federal funding under subject Award DE-EE0006339. DOE’s notice of discontinuation was the first indication provided to Electricore that the work completed against Task 1 - Program Planning and Evaluation during Budget Period 1 was inadequate. Significantly, the discontinuation was based in large part on the erroneous assertion that many of the tasks were incomplete as indicated in the Continuation Application. However, the Continuation Application was submitted July 29, 2014, while the period of performance for this last quarter in Budget Period 1 did not end until September 30, 2014. Accordingly, the performance for this last quarter in Budget Period 1 will be reported in the upcoming Quarterly Report which is not due until October 30, 2014. Nevertheless, in response to DOE’s letter and in further support of Electricore’s Continuation Application, we are providing a detailed status demonstrating adherence to all program requirements for each Task 1, Budget Period 1 SOPO activity and milestones in response to the DOE review.

14 SOLAR ENERGY↗

Fault Geomechanics and Carbon Dioxide Leakage Applied to Geological Storage: FY07 Quarterly and Summary Reports

Safe and permanent storage of carbon dioxide in geologic reservoirs is critical to geologic sequestration. The objective of this study is to quantify the conditions under which a general (simulated) fault network and a specific (field case) fault network will fail and leak carbon dioxide out of a reservoir. Faults present a potential fast-path for CO{sub 2} leakage from reservoirs to the surface. They also represent potential induced seismicity hazards. It is important to have improved quantitative understandings of the processes that trigger activity on faults and the risks they present. Fortunately, the conditions under which leakage along faults is induced can be predicted and quantified given the fault geometry, reservoir pressure, an in-situ stress tensor. We proposed to expand the current capabilities of fault threshold characterization and apply that capability to a site where is CO{sub 2} injection is active or planned. Specifically, we proposed to use a combination of discrete/explicit and continuum/implicit codes to provide constrain the conditions of fault failure. After minor enhancements of LLNL's existing codes (e.g., LDEC), we would create a 3D synthetic model of a common configuration (e.g., a faulted dome). During these steps, we will identify a field site where the necessary information is available and where the operators are willing to share the necessary information. We would then execute an analysis specific to the field case. The primary products by quarter are: 1Q--Identification of likely field case; 2Q--Functioning prototype fault model; 3Q--Execution of fault-slip/migration calculation for synthetic case; and 4Q--Begin simulation of fault-slip/migration calculation for field system. It is worth noting that due to the continuing resolution, we did not receive any funds until 3Q, and did not receive >65% of the support until 4Q. That said, we were still able to meet all of our milestones for FY07 on time and on budget.

58 GEOSCIENCES↗

Smashing the Stovepipe: Leveraging the GMSEC Open Architecture and Advanced IT Automation to Rapidly Prototype, Develop and Deploy Next-Generation Multi-Mission Ground Systems

Satellite/Payload Ground Systems - Typically highly-customized to a specific mission's use cases - Utilize hundreds (or thousands!) of specialized point-to-point interfaces for data flows / file transfers Documentation and tracking of these complex interfaces requires extensive time to develop and extremely high staffing costs Implementation and testing of these interfaces are even more cost-prohibitive, and documentation often lags behind implementation resulting in inconsistencies down the road With expanding threat vectors, IT Security, Information Assurance and Operational Security have become key Ground System architecture drivers New Federal security-related directives are generated on a daily basis, imposing new requirements on current / existing ground systems - These mandated activities and data calls typically carry little or no additional funding for implementation As a result, Ground System Sustaining Engineering groups and Information Technology staff continually struggle to keep up with the rolling tide of security Advancing security concerns and shrinking budgets are pushing these large stove-piped ground systems to begin sharing resources - I.e. Operational / SysAdmin staff, IT security baselines, architecture decisions or even networks / hosting infrastructure Refactoring these existing ground systems into multi-mission assets proves extremely challenging due to what is typically very tight coupling between legacy components As a result, many "Multi-Mission" ops. environments end up simply sharing compute resources and networks due to the difficulty of refactoring into true multi-mission systems Utilizing continuous integration / rapid system deployment technologies in conjunction with an open architecture messaging approach allows System Engineers and Architects to worry less about the low-level details of interfaces between components and configuration of systems GMSEC messaging is inherently designed to support multi-mission requirements, and allows components to aggregate data across multiple homogeneous or heterogeneous satellites or payloads - The highly-successful Goddard Science and Planetary Operations Control Center (SPOCC) utilizes GMSEC as the hub for it's automation and situational awareness capability Shifts focus towards getting GS to a final configuration-managed baseline, as well as multi-mission / big-picture capabilities that help increase situational awareness, promote cross-mission sharing and establish enhanced fleet management capabilities across all levels of the enterprise.

GMSEC↗

DOE Better Buildings Neighborhood Program, Energy Smart Colorado: Resort Communities Retrofit Program

Energy Smart Colorado is an energy efficiency program established in 2011 in the central mountain region of Colorado. The program was funded through a grant of $4.9 million, awarded in August 2010 by the U.S. Department of Energy’s Better Buildings Program. As primary grant recipient, Eagle County coordinated program activities, managed the budget, and reported results. Eagle County staff worked closely with local community education and outreach partner Eagle Valley Alliance for Sustainability (now Walking Mountains Science Center) to engage residents in the program. Sub-recipients Pitkin County and Gunnison County assigned local implementation of the program in their regions to their respective community efficiency organizations, Community Office for Resource Efficiency (CORE) in Pitkin County, and Office for Resource Efficiency (ORE) in Gunnison County. Utility partners contributed $166,600 to support Home Energy Assessments for their customers. Program staff opened Energy Resource Centers, engaged a network of qualified contractors, developed a work-flow, an enrollment website, a loan program, and a data management system to track results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Negative Ion Drift TPC Development for High-Resolution Tracking (Final Technical Report)

Together with our Japanese (Kobe) and US collaborators (Hawaii and Wellesley), we proposed work on negative-ion time projection chambers (NITPC) with the recently discovered NI gas, SF 6 . The 1-year proposal requested $\$$37,699 at UNM to extend our work on studying the properties of SF 6 and to perform R&D on a novel TPC readout scheme that employs timing alone to reconstruct short tracks in 2-dimensions. The proposal was approved but the budget reduced to $\$$8K, thereby reducing the scope of the project. We chose to focus our efforts on R&D of the novel TPC readout (the “tilted GEM” readout) and used our funds for materials and supplies and machine shop time at UNM. Support for manpower, such as an engineer, graduate student and the PI were not included. Here we provide a fuller motivation for this R&D (which was not possible in the very short proposal) and describe the accomplishments over the ~1.5 year of the grant (including a NCE).

47 OTHER INSTRUMENTATION↗

NCSP Outlook and Interest for Collaboration on HST Experiments [Slides]

The majority of the NCSP budget goes to Integral Experiments. The goal is to produce needed integral data for criticality safety needs in DOE, largely resulting in ICSBEP benchmarks. NCSP has a well defined process for allocating funding through proposals and expert review. NCSP is a fairly small program and funding is prioritized for experiments that would address DOE criticality safety needs. The majority of the currently identified DOE criticality safety needs are HEU and Pu systems. NCSP has a formal mechanism to ensure quality and benefit through the phase gates and approvals within the CED process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An update on the Department of Energy's photovoltaic program

Funding for the terrestrial photovoltaic's program is $78 million in 1994. This is more than double the minimum level reached in 1989 and runs counter to the general trend of decreasing budgets for Department of Energy (DOE) programs. During the past five years, the program has expanded its mission from research and development to also address manufacturing technology and commercialization assistance. These new activities are directed toward revitalizing the market to reinstate the rapid rate of sales growth needed to attract investment. The program is approaching balance among efforts in each of the three areas. This translates to a reduction in some of the R & D activities of most relevance to the space power community. On the other hand, some of the advancements in manufacturing may finally bring thin-film technologies to reality for space arrays. This talk will describe the status and direction of DOE program with an eye toward highlighting its impact on technology of interest for space.

Benner, John P.↗

Aerospace Safety Advisory Panel

This Annual Report of the Aerospace Safety Advisory Panel (ASAP) presents results of activities during calendar year 2001. The year was marked by significant achievements in the Space Shuttle and International Space Station (ISS) programs and encouraging accomplishments by the Aerospace Technology Enterprise. Unfortunately, there were also disquieting mishaps with the X-43, a LearJet, and a wind tunnel. Each mishap was analyzed in an orderly process to ascertain causes and derive lessons learned. Both these accomplishments and the responses to the mishaps led the Panel to conclude that safety and risk management is currently being well served within NASA. NASA's operations evidence high levels of safety consciousness and sincere efforts to place safety foremost. Nevertheless, the Panel's safety concerns have never been greater. This dichotomy has arisen because the focus of most NASA programs has been directed toward program survival rather than effective life cycle planning. Last year's Annual Report focused on the need for NASA to adopt a realistically long planning horizon for the aging Space Shuttle so that safety would not erode. NASA's response to the report concurred with this finding. Nevertheless, there has been a greater emphasis on current operations to the apparent detriment of long-term planning. Budget cutbacks and shifts in priorities have severely limited the resources available to the Space Shuttle and ISS for application to risk-reduction and life-extension efforts. As a result, funds originally intended for long-term safety-related activities have been used for operations. Thus, while safety continues to be well served at present, the basis for future safety has eroded. Section II of this report develops this theme in more detail and presents several important, overarching findings and recommendations that apply to many if not all of NASA's programs. Section III of the report presents other significant findings, recommendations and supporting material applicable to specific program areas. Appendix A presents a list of Panel members. Appendix B contains the reaction of the ASAP to NASA's response to the calendar year 2000 findings and recommendations. In accordance with a practice started last year, this Appendix includes brief narratives as well as classifications of the responses as 'open,' 'closed,' or 'continuing.' Appendix C details the Panel's activities during the reporting period.

Source record↗

Passive Measurement of CO2 Column from an Airborne Platform

We are in the third and final year of our IIP funding to develop a sensor for very precise determination of the CO2 Column. Global measurements of this sort from a satellite platform are needed to improve our understanding of the global carbon budget. In previous reports to this meeting we have described the method by which this system operates and presented data taken during ground based tests of the instrument. Work in the final year has concentrated on building the flight hardened version of the instrument that will be used in our field trials on the Dryden DC-8. The flight unit represents an integration of three channels into a single instrument. These three channels are the CO2 channel, the oxygen pressure sensing channel, and the oxygen temperature sensing channel. Integration of the three channels into a single unit significantly decreases the size of the instrument. The flight unit also employs more rugged optical mounts and integrated optical shielding. Light enters the instrument from below first striking the right angled mirror shown extending over the edge of the platform. The light is then focused through a pinhole to define the instrument field of view, chopped and recollimated. Dichroic mirrors are used to separate the CO2 wavelength from the O2 wavelength and that light is further divided by a 50-50 beamsplitter between the 2 oxygen channels - the pressure channel and the temperature channel. The six white boxes contain the detectors for each of the three channels. The detectors on the left in the photo serve the reference channels and the detectors on the right are for the Fabry-Perots. CO2 is measured by the pair of detectors farthest from the viewer. Pressure via O2 is detected by the central pair of detectors. The closest pair is used to determine temperature via O2.

Heaps, William S.↗

Increased Science Instrumentation Funding Strengthens Mars Program

As the strategic knowledge gaps mature for the exploration of Mars, Mars sample return (MSR), and Phobos/Deimos missions, one approach that becomes more probable involves smaller science instrumentation and integrated science suites. Recent technological advances provide the foundation for a significant evolution of instrumentation; however, the funding support is currently too small to fully utilize these advances. We propose that an increase in funding for instrumentation development occur in the near-term so that these foundational technologies can be applied. These instruments would directly address the significant knowledge gaps for humans to Mars orbit, humans to the Martian surface, and humans to Phobos/ Deimos. They would also address the topics covered by the Decadal Survey and the Mars scientific goals, objectives, investigations and priorities as stated by the MEPAG. We argue that an increase of science instrumentation funding would be of great benefit to the Mars program as well as the potential for human exploration of the Mars system. If the total non-Earth-related planetary science instrumentation budget were increased 100% it would not add an appreciable amount to the overall NASA budget and would provide the real potential for future breakthroughs. If such an approach were implemented in the near-term, NASA would benefit greatly in terms of science knowledge of the Mars, Phobos/Deimos system, exploration risk mitigation, technology development, and public interest.

Graham, Lee D.↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

Packaging and Transportation Support at LANL CTMA 2012

Operations Support Packaging and Transportation (OS-PT) supports LANL in various functions. Some highlights of the past year have been with the work relating to environmental remediation, type B packaging, non-DOT compliant transfers, and special permit training. The TA-21 remediation project was part of the ARRA funding that LANL received. The $212 million in funding was used to demolish 24 buildings at TA-21, excavate the lab's oldest waste disposal site, and install 16 groundwater monitoring wells. The project was completed ahead of schedule and under budget. More than 300 tons of metal was recycled and all the soil excavated from MDA-B was replaced with clean fill. OS-PT supported this projected by transporting more than 7 million pounds of waste to TA-54 Area G with an addendum to their TSD. Because of the public access on the transfer route, Los Alamos County restricted the transfer to happen from 2:00 AM to 4:00 AM. OS-PT conducted 8 transfers in support of this project. Some concerns included the contaminated trailers at receipt facilities when transferring filled Super Sacks. Future Super Sacks were over packed into new IP-2 Super Sacks before shipping. OS-PT is also supporting the remediation of TA-54 Area G. LANL has an agreement with the State of New Mexico to remove all TRU waste currently stored above ground from at Area G. OS-PT supports this initiative with transfers of TRU waste under LANL's TSD and support of TRU shipments to WIPP. Another project supported by our organization is gas cylinder/dewar recycling and remediation. We are focusing on reducing risk associated with unneeded gasses at LANL. To minimized excessive ordering, to save money and time, and to minimize hazards OS-PT is supporting a gas recycling program. This program will allow programmatic organization across LANL to share unused/unneeded gasses. Instead of old dewars being disposed of, OS-PT has began identifying these dewars and sending them for refurbishment. To date, this effort has saved LANL $450K and estimated saving for future efforts will be more than $1.5 million. Some Projects that are happening here at LANL are offsite source recovery, weapon component transfers, and isotope science production. There are specific packages that help support these projects for the shipment of related materials. OS-PT provides support to these packages to ensure they are and will be available to continue this support. The Areva 435-B Overpack will help the Offsite Source Recovery Project recover high activity gamma sources from various locations across the globe. The Safety Analysis for Packaging is scheduled for initial completion June of 2012. The DPP-1 package is designed to replace the Model FL, which was designed by Rocky Flats and began service in 1990. LANL has collaborated on package design with LLNL, Pantex, Y-12, and KCP. LANL is supporting LLNL on component fixture development. Testing to 10 CFR 71 is to be completed in the Fall of 2012 and scheduled for NA-174 approval in 2014. The SAFESHIELD package helps supports LANL's Isotope production projects. This package can transfer highly irradiated materials from LANL's accelerator to material processing facilities. LANL worked to renew the SAFESHEILD's Certification for 5 more years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗