Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

LAWPS Technology Maturation Program and Scaled Testing - 17408

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 18488

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of National Laboratory and Low-Activity Waste Pretreatment System Technology Service Providers - 16435

The National Laboratories are a critical partner and provide expertise in numerous aspects of the successful execution of the Direct-Feed Low Activity Waste Program. The National Laboratories are maturing the technologies of the Low-Activity Waste Pretreatment System consistent with DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets', expectations. The National Laboratories continue to mature waste forms, i.e., glass and secondary waste grout, for formulations and predictions of long-term performance as inputs to performance assessments. The working processes with the National Laboratories have been developed in procurements, communications, and reporting to support the necessary delivery-based technology support. The relationship continues to evolve from planning and technology development to support of ongoing operations and integration of multiple highly coordinated facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1C, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Proposed Approach for Prioritizing Maintenance at NASA Centers

The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.

Dunn, Steven C.↗

SolarSTARTS: Solar-Assisted State-Aware and ResilienT infrastructure System

This final technical report provides a description and results of the design, development, testing, and validation of the Automated Resilience Management System (ARMS) solution, which integrates different systems to collect, store and process relevant information from the power distribution system to automatically manage the operation of multiple energy assets to enhance the resilience of the power grid against high-impact physical incidents (e.g., hurricanes) and cyber threats. The developed solution comprises a suite of novel AI-based algorithms designed to first detect, locate, and classify anomalies by collecting and analyzing data from multiple monitoring and control devices

14 SOLAR ENERGY↗

Understanding Impacts of Data Integrity Attacks on Transactive Control Systems

With the rapid growth of internet-connected smart devices capable of exchanging energy price information and adaptively controlling energy consumption of connected loads, the role of transactive control is expected to become more prominent in the modern grid. Transactive control systems integrate the wholesale and retail energy markets, and enable active participation of end users, thereby playing a key role in managing the rising number of distributed assets in the smart grid. The use of internet for the communication of data between the controllers at the building, distribution, and transmission levels makes the system susceptible to cyber-attacks. A skilled adversary can potentially manipulate the exchanged data with the intention of inflicting damage to the system. In this paper, four categories of metrics are put forth for evaluating the performance of the system when under data integrity attacks. A model for scaling-based data integrity attack has been described, and co-simulations have been performed on a 240 bus WECC transmission system model with detailed modeling of distribution systems at specific buses. Our results show that scaling-based data integrity attacks can have non-trivial impacts on the operational, financial, and comfort aspects of the transactive control system.

Smart grid, transactive control system, Buildings-↗

Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: 1. No Action, 2. Modify Existing DOE Facilities – capabilities distributed among multiple locations, 3. Modify Existing DOE Facilities – capabilities consolidated at a few locations, 4. Construct New Facility, 5. Commercial Partnership, and 6. International Partnerships. Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by a new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.

42 ENGINEERING↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Electrical Fault Detection, Power Quality, Distributed Energy Resource Use Cases, and Cyber Event Applications with the Cyber Grid Guard System Using Distributed Ledger Technology

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation and are associated with distributed energy resources (DERs). The integrity and confidentiality of data from IEDs is crucial, and distributed ledger technology (DLT) could improve the resilience of microgrids by helping to make these data more secure. The most popular applications using blockchain technology for electrical utilities is in the field is based on energy trading. However, the dynamism of the penetration of customer owned DERs and the deployment of sensors with IEDs have led to the identification of new applications using DLT that are focused on other areas, such as monitoring, operation and management of the grid and its assets. In addition, the majority of studies on electrical grid applications with blockchain were validated with software simulations. Although general monitoring of power systems for using DLT could be evaluated in operational electric grids, other DLT research applications such as defense against cyber-attacks and/or electrical fault detection are not likely to be performed in a real infrastructure because of possible risks to the network/equipment security. This report summarizes the application of power system applications using distributed ledger technology (DLT), providing a secure DLT framework for collecting data from IEDs like power meters and protective relays inside and outside of an electrical substation and/or between two different electrical utilities. In this study, the use case scenarios were created and assessed for different power system application by using DLT. The electrical fault detection for faulted phases (1), power quality monitoring of phase voltage magnitudes, frequency levels and load power factor (2), DERs use case monitoring (3), and cyber-event applications (4) were performed in a test bed with a Cyber-Grid Guard (CGG) system using DLT. It had a real-time simulator with power meters and protective relays in-the-loop. The first section of this report presents a literature review of power system applications using blockchain at research level. The second section shows the theory and equations used on this report. The third section shows the description of the test bed, equipment, architecture, and electrical grid diagrams. The fourth section shows the experimental models and use case scenarios that were performed for the electrical fault detection, power quality, DERs use case, and cyber event applications with the CGG system using DLT. The fifth section shows the results collected from the tests based on comparing the time stamped events of the analog signals from the IEDs, DLT computer and real time simulator. The sixth section performed the discussion of the results for the use case scenarios. Finally, section seven presents the conclusions for this report were presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Haughton-Mars Project Expedition 2005

The 2005 expedition to the Haughton-Mars Project (HMP) research station on Devon Island was part of a NASA-funded project on Space Logistics. A team of nine r&searchers from MIT went to the Canadian Arctic to participate in the annual I-IMP field campaign from July 8 to August 12, 2005. We investigated the applicability of the HMP research station as an analogue for planetary macro- and micro-logistics to the Moon and Mars, and began collecting data for modeling purposes. We also tested new technologies and procedures to enhance the ability of humans and robots to jointly explore remote environments. The expedition had four main objectives. We briefly summarize our key findings in each of these areas. 1. Classes of Supply: First, we wanted to understand what supply items existed at the HMP research station in support of planetary science and exploration research at and around the Haughton Crater. We also wanted to quantify the total amount of imported mass at HMP and compare this with predictions from existing parametric lunar base demand models. 2. Macro-Logistics Transportation Network: Our second objective was to understand the nodes, transportation routes, vehicles, capacities and crew and cargo mass flow rates required to support the HMP logistics network. 3. Agent and Asset Tracking: Since the current inventory management system on ISS relies heavily on barcodes and manual tracking, we wanted to test new automated technologies and procedures such as radio frequency identification RFID) to support exploration logistics. 4. Micro-Logistics (EVA): Finally, we wanted to understand the micro-logistical requirements of conducting both short (<1 day) and long traverses in the Mars-analog terrain on Devon Island. Micro-logistics involves the movement of surface vehicles, people and supplies from base to various exploration sites over short distances (<100 km).

deWeck, Olivier↗

Gateway Implementation of Cybersecurity Requirements

Cyber threats are a constant present-day reality for any type of business -- Space exploration is not excluded from these threats either. The Gateway Program is one of NASA’s latest initiatives that extend space exploration beyond low earth orbit. Gateway allows for NASA to prove technologies and mature systems necessary to live and work on another celestial body before embarking on multi-year missions to Mars. The Gateway is a small, human-tended space station in orbit around the Moon. With the increased autonomy, distance and criticality of systems, cybersecurity is one of the critical subsystems that touches and integrates with most if not all subsystems of the Gateway. Building a gateway to the lunar orbit is no simple task. In this presentation, we outline an approach that the Gateway team adopted in creating a cyber safe and robust vehicle to support operations and assure protection of the critical functions. Gateway Program is required to implement National Institute of Standards and Technology (NIST) guidelines to adhere to the Federal Information Security Modernization Act (FISMA). NIST provides a framework for managing and controlling cybersecurity risks by defining cybersecurity controls and methodologies for implementation. The NIST framework is based upon the system, data within the system, integrations with external systems, and risk assessments to determine impacts for each of those systems. The goals and objectives are to identify appropriate security controls that fulfill and map to the NIST 800-53 framework. The implementation process involves developing an organizational understanding to manage cybersecurity risk to systems, people, assets, data, and capabilities. NIST Security controls are interpreted and defined within the Gateway vehicle requirements subsystems specifications. This paper details the approach, implementation, and challenges faced during the development and design phases to address cyber threats during the Gateway vehicle operations.

Svetlana Hanson↗

Gateway Implementation of Cybersecurity Requirements

Cybersecurity threats are a constant present-day reality for any type of business -- Space exploration is not excluded from these threats either. The Gateway Program is one of NASA’s latest initiatives that extend space exploration beyond low earth orbit. Gateway allows for NASA to prove technologies and mature systems necessary to live and work on another celestial body before embarking on multi-year missions to Mars. The Gateway is a small, human-tended space station in orbit around the Moon. With the increased autonomy, distance and criticality of systems, cybersecurity is a critical discipline that touches and integrates with most if not all subsystems of the Gateway. Building a gateway to the lunar orbit is no simple task. In this presentation, we outline an approach that the Gateway team adopted in creating a cyber safe and robust vehicle to support operations and assure protection of the critical functions. Gateway Program is required to implement National Institute of Standards and Technology (NIST) guidelines to adhere to the Federal Information Security Modernization Act (FISMA). NIST provides a framework for managing and controlling cybersecurity risks by defining cybersecurity controls and methodologies for implementation. The NIST framework is based upon the system, data within the system, integrations with external systems, and risk assessments to determine impacts for each of those systems. The goals and objectives are to identify appropriate security controls that fulfil and map to the NIST 800-53 framework. The implementation process involves developing an organizational understanding to manage cybersecurity risk to systems, people, assets, data, and capabilities. NIST Security controls are interpreted and defined within the Gateway vehicle requirements subsystems specifications. This paper details the approach, implementation, and challenges faced during the development and design phases to address cyber threats during the Gateway vehicle operations.

Cybersecurity↗

Integration of National Laboratory and Low-Activity Waste Pre-Treatment System Technology Service Providers - 16435

The National Laboratories are a critical partner and provide expertise in numerous aspects of the successful execution of the Direct-Feed Low Activity Waste Program. The National Laboratories are maturing the technologies of the Low-Activity Waste Pre-Treatment System (LAWPS) consistent with DOE Order 413.3B “Program and Project Management for the Acquisition of Capital Assets” expectations. The National Laboratories continue to mature waste forms, i.e. glass and secondary waste grout, for formulations and predictions of long-term performance as inputs to performance assessments. The working processes with the National Laboratories have been developed in procurements, communications, and reporting to support the necessary delivery-based technology support. The relationship continues to evolve from planning and technology development to support of ongoing operations and integration of multiple highly coordinated facilities.

Low-Activity Waste↗

Cost-Saving Strategies to Improve County Economic and Energy Resilience: A Resilient Counties Forum - Cultivating and Protecting Energy Assests Panel

The Resilient Counties Forum is a FREE opportunity for county leaders to gain a better understanding of how they can help meet county disaster management, energy cultivation and protection, resource recycling and infrastructure financing goals. At the Forum, county leaders and the private sector will discuss successful resilience strategies, and create action plans for how county leaders might address certain issues in their counties. The morning session will include presentations featuring county examples of best practices in the following topic areas: Managing Disasters, Cultivating and Protecting Energy Assets, Infrastructure Financing and Resource Recycling.

14 SOLAR ENERGY↗

The container database? life-cycle management of container inventories at the Hanford site - 15131

Since 2011 the Department of Energy (DOE) Richland Operations Office (DOE-RL) and their contractor CH2M HILL Plateau Remediation Company (CH2M HILL) have worked together to develop a database that provides life-cycle management and control of all CH2M HILL-managed Department of Transportation (DOT) Type A and Industrial Packaging (IP) container assets at the Hanford Site. This powerful tool provides CH2M HILL with the capability to centrally manage container procurement specifications; maintenance requirements; certificates of conformance; certification and test reports; as-built drawings; and information on container status, location, and ownership; and any special characteristics of container assets. The database was originally developed to provide ready access to Type A and IP container supplier and manufacturer Certificates of Conformance (CoCs) and related certification documentation to support onsite shipments in compliance with the Hanford Site Wide Transportation Safety Document (TSD), DOE/RL-2001-0036, as well as regulatory or other requirements. The information is accessed through active links to these documents within the database itself. The database has grown to include links to external supplementary information to support onsite shipments, such as links to authorized tie downs for each package type, approved packaging and transportation commodities, and approved shipping authorizations, and packaging management procedures and checklists. The database is a living databank that is easily tailored to meet user- and site-specific needs as they are identified. It is currently being expanded to include the inventories of all Hanford contractors, as well as other packaging assets, such as specialty drums and packaging commodities. Each upgrade brings efficiencies and cost savings, not only in container inventory management, but also in the areas of work control, waste packaging, waste transportation, and regulatory compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal Portfolio Management in a Modified Constant Elasticity of Variance Model

We investigate the optimal management of a portfolio consisting of a risk asset and a risk-free bond. The asset dynamics is specified by the M-CEV model. Assuming that the investor has a power utility function, we derive an explicit analytical portfolio-management formula that contains confluent hypergeometric functions. The asymptotic form of the proposed portfolio management strategy is obtained, as well as approximate formulas consisting only of elementary functions. We additionally present an application of our results in the context of algorithmic statistical-arbitrage strategies.

97 MATHEMATICS AND COMPUTING↗