ECLSS Universal Waste Management System (UWMS) Metal Materials Compatibility Study - Elgiloy: Electrochemical and Crevice Corrosion Evaluation

Electrochemical evaluations were conducted on samples of Elgiloy in support of the materials compatibility program for the Environmental Control and Life Support System (ECLSS). Results were compared alongside three previously tested metals: Titanium 6Al-4V, Inconel 625, and Hastelloy C276. Titanium exhibited the best results of all the metals, indicating superior corrosive nobility and galvanic protection properties. Elgiloy demonstrated anti-corrosion behavior which appeared to be superior to the two nickel-chromium alloys. For this current effort, the results have clearly shown that Elgiloy possesses excellent corrosion protection properties and is galvanically compatible with the other three metals in the subject test media.

Lee, R. E.↗

Pedestal Hazard Abatement and Soil Removal Construction Completion Report for Launch Complex 34, Solid Waste Management Unit CC054, Cape Canaveral Space Force Station, Florida

This Construction Completion Report summarizes the activities associated with implementation of an interim measure (IM) for hazard abatement of the Launch Pedestal and soil removal at Launch Complex 34 (LC34), Cape Canaveral Space Force Station, Florida. The purpose of the hazard abatement IM was to mitigate any continuing source of contamination associated with residual paint on the Launch Pedestal that contained polychlorinated biphenyls (PCBs). Sampling determined that residual PCB concerns were limited to the steel elements on the top-side of the Pedestal, which included the torus ring, feed pipe, down pipes, pipe straps and shields, remaining steel cover plates and bolts, and railing support steel. The IM also mitigated the potential spread of contamination to surrounding areas by removing fallen metal fragments from the concrete launch pad, as well as soil from trenches on the launch pad where PCB-containing paint chips may have accumulated prior to or during Pedestal hazard abatement activities.

Complex 34↗

Request for Discontinuation of Long-Term Monitoring Orsino Storage Yard Solid Waste Management Unit 004 Kennedy Space Center, Florida

This report presents the site history, groundwater sampling results, and recommendations from the 2021 Industrial Area (IA) LTM activities at ORSY. ORSY has been used as a staging facility for electrical equipment since 1966 (EG&G 1991). Initial investigations conducted between 1986 and 1992 focused on polychlorinated biphenyls (PCBs) in soil. A series of soil excavation interim measures (IMs) were conducted to remove soils containing total PCB concentrations of greater than 25 milligrams per kilogram (mg/kg). A Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed in several phases at ORSY from 1998 through 2005, with PCBs in soil and volatile organic compounds (VOCs) in groundwater identified as contaminants of concern.

Jennifer Lynn Joyal↗

Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet↗

Monitoring Well Installation Completion Report for Ransom Road Landfill, Vertical Processing Facility, and Environmental Health Facility, Solid Waste Management Units: 003, 077, and 079

The intended purpose of the Monitoring Well Installation project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by installing new monitoring wells. The wells are installed in accordance with the Brevard County Health Department and St. Johns River Water Management Districts rules and guidelines.

Well Installation↗

Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗

Modeling Stress-Induced Pore Water Pressures in The Vadose Zone Beneath a Composite-Lined Landfill - 20029

A finite-element model was developed to evaluate mechanisms contributing to positive pore pressures measured with sealed pressure transducers in the geological buffer beneath the Environmental Management Waste Management Facility, a composite-lined mixed waste disposal facility operated by the US Department of Energy. The geological buffer is a 3-m-thick engineered fine-textured layer directly beneath the Environmental Management Waste Management Facility's composite liner, and above the groundwater table. The model accounts for changes in pore water pressure resulting from (i) loading imposed by waste placed on the overlying liner, (ii) moistening of the geological buffer due to equilibration with the underlying geological materials, and (iii) fluctuations in the elevation of the underlying groundwater table. Pore water pressures predicted by the model are in good agreement with pore water pressures measured in the field. The predictions confirm that positive pore water pressures recorded by the sealed pressure transducers in the geological buffer are excess pore water pressures induced by the vertical normal stress imposed by waste placed on the liner, and are not due to a rise in the groundwater table. Simulations also showed that two additional years of filling would further increase the pore water pressure without any change in elevation of the groundwater table. The geological buffer remained unsaturated during the simulation, with a B-coefficient (parameter indicative of the degree of saturation) similar to that computed from the field-measured pore water pressures and waste filling records. Larger increases in pore water pressure were observed when the geological buffer was assumed to have higher initial saturation, as was observed in the field data. Incorporating seasonal fluctuations in the groundwater table beneath the geological buffer in the model resulted in predictions of small seasonal oscillation in the pore water pressure at the measurement location, similar to seasonal oscillations observed in the field. Predictions made with the model indicate that the dissipation of the excess pore water pressures will occur over decades due to the low hydraulic conductivity of the geological buffer material. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2019-20 Waste Streams - 20491

The Waste Information Management System (WIMS) 2019-20 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Station environmental control and life support system distribution and loop closure studies

The NASA Space Station's environmental control and life support system (ECLSS) encompasses functional elements concerned with temperature and humidity control, atmosphere control and supply, atmosphere revitalization, fire detection and suppression, water recovery and management, waste management, and EVA support. Attention is presently given to functional and physical module distributions of the ECLSS among these elements, with a view to resource requirements and safety implications. A strategy of physical distribution coupled with functional centralization is for the air revitalization and water reclamation systems. Also discussed is the degree of loop closure desirable in the initial operational capability status Space Station's oxygen and water reclamation loops.

Humphries, William R.↗