Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Enhanced Distributed Solar Photovoltaic Deployment via Barrier Mitigation or Removal in the Western Interconnection (Final Technical Report)

In 2017, the Western Electricity Coordinating Council (WECC) 2026 Common Case projected that distributed solar PV deployment in the Western U.S. would meet or exceed 16,106 MW of installed capacity by 2026. Of this total, 12,218 MW was projected to be deployed in California and another 3,888 MW was projected to be deployed across Arizona, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. However, WIEB recognized that barriers to distributed solar PV deployment could cause the region to fall short of these projections. WIEB identified three types of perceived barriers that might interfere with the deployment of distributed solar PV generation in the West, including: (1) interconnection barriers; (2) utility rate-design barriers; and (3) reliability barriers.

14 SOLAR ENERGY↗

Improving the Cyber and Physical Security Posture of the Electric Sector (Final Report)

Cooperative electric utilities represent an integral part of the larger electric grid and are part of the nation’s critical infrastructure. The National Rural Electric Cooperative Association (NRECA) has a unique relationship with approximately 900 cooperatively owned and operated electric utilities and engaged in a program with the Department of Energy (DOE) to promote a culture of cybersecurity and resiliency within the electric cooperative community. The Rural Cooperative Cybersecurity Capabilities (RC3) Program, funded under a Cooperative Agreement with DOE (Project DE-OE-0000807), focused on improving the cybersecurity and resiliency capabilities of small and mid-sized electric distribution cooperatives. This segment of electric utilities faces many challenges, but also embraces a culture of cooperation that presents opportunities. A customized approach is needed to reach these utilities – one that emphasizes collaboration, more focused and personalized training, use of trusted and familiar experts that can be deployed as needed, software security services that require limited in-house cybersecurity expertise, and shared resource models that enable access to more expensive cybersecurity options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 8: Searching for Life Beyond Earth

The search for life beyond Earth necessitates a rigorous and comprehensive examination of biosignatures, the types of observable imprints that life produces. These imprints and our ability to detect them with advanced instrumentation hold the key to our understanding of the presence and abundance of life in the universe. Biosignatures are the chemical or physical features associated with past or present life and may include the distribution of elements and molecules, alone or in combination, as well as changes in structural components or physical processes that would be distinct from an abiotic background. The scientific and technical strategies used to search for life on other planets include those that can be conducted in situ to planetary bodies and those that could be observed remotely. Here this chapter discusses numerous strategies that can be employed to look for biosignatures directly on other planetary bodies using robotic exploration including those that have been deployed to other planetary bodies, are currently being developed for flight, or will become a critical technology on future missions. Search strategies for remote observations using current and planned ground-based and space-based telescopes are also described. Evidence from spectral absorption, emission, or transmission features can be used to search for remote biosignatures and technosignatures. Improving our understanding of biosignatures, their production, transformation, and preservation on Earth can enhance our search efforts to detect life on other planets.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Electric Sector Water Use Under Alternative Electricity Futures

Increasing competition for water resources in the United States could create future challenges for allocating and using thermal cooling water in the U.S. electric power sector. While thermal power plant retirements and the growth of wind and solar technologies can reduce national aggregate power sector cooling water use, local water constraints and growing demand for agricultural or municipal supply could create greater needs for higher-cost alternative water supplies such as groundwater or recycled wastewater. For some regions, these incentives could change future electricity planning and operational decisions. These relationships and impacts are studied here using the National Renewable Energy Laboratory (NREL) Regional Energy Deployment System (ReEDS), a national electric sector planning model that has recently been upgraded to include a highly detailed representation of thermal cooling water demand and supply. Thermal power technologies are differentiated by both cooling technology and water source type to track and constrain thermal cooling water use in a way that incorporates both physical and legal water considerations in the United States. This capability is exercised under a range of electricity sector futures with alternative technology costs, fuel prices, and water constraints to illustrate ways that U.S. electric sector water use could evolve under uncertain future electric sector drivers. In exploring changes to regional generation and transmission planning and operation, water requirements, and cost, we highlight the environmental and economic impacts of future power sector water decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation

As modern power systems are experiencing exceptional changes with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system could obtain high system resilience by not relying on the bulk power system restoration, which requires significant human intervention and procedure. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and the technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by- phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and startup behaviors as well as network dynamics. In addition, active involvement of grid- following distributed energy resources is also studied to facilitate the black-start process. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, we demonstrate that a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start, using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Performance Evaluation of Hierarchical Controls for Advanced Distribution Management System-Centered Grid Operations: Preprint

This paper presents a hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation using an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge voltage control devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results show proper functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues (e.g., instability) for field deployment.

ADMS↗

SDOM (Storage Deployment Optimization Model) [SWR-21-73]

SDOM is designed to accurately represent the operation of energy storage across different timescales, including long-duration and seasonal applications, and the spatiotemporal diversity and complementarity among VRE sources. SDOM uses an hourly temporal resolution, a fine spatial resolution for VRE sources, and a 1-year optimization window. SDOM assumes that all builds of VRE are accompanied by sufficient additional transmission capacity to allow full utilization of these additional resources. Nuclear, hydropower, and other renewable generation (e.g., biomass and geothermal energy sources) are fixed based on operational data (time series) for a given year; thus, SDOM minimizes total system cost using conventional generators as balancing units and using VRE and storage technologies to achieve a user-defined carbon-free or renewable energy target. The total system cost includes capital costs, fixed operation-and-maintenance (FO&M) costs, variable operation-and-maintenance (VO&M) costs, and fuel cost for power generation and storage technologies.

Guerra Fernandez, Omar Jose↗

Dynamic Transmission Line Switching Amid Wildfire-Prone Weather Under Decision-Dependent Uncertainty

During dry and windy seasons, environmental conditions significantly increase the risk of wildfires, exposing power grids to disruptions caused by transmission line failures. Wildfire propagation exacerbates grid vulnerability, potentially leading to prolonged power outages. To address this challenge, we propose a multistage optimization model that dynamically adjusts transmission grid topology in response to wildfire propagation, aiming to develop an optimal response policy. By accounting for decision-dependent uncertainty, where line survival probabilities depend on usage, we employ distributionally robust optimization to model uncertainty in line survival distributions. We adapt the stochastic nested decomposition algorithm and derive a deterministic upper bound for its finite convergence. To enhance computational efficiency, we exploit the Lagrangian dual problem structure for a faster generation of Lagrangian cuts. Using realistic data from the California transmission grid, we demonstrate the superior performance of dynamic response policies against two-stage alternatives through a comprehensive case study. In addition, after solving the multistage formulation, we construct easy-to-implement policies that significantly reduce computational burden while maintaining good performance in real-time deployment. History: Accepted by Russell Bent, Area Editor for Network Optimization: Algorithms and Applications. Funding: This work was supported by the U.S. Department of Energy, Office of Electricity [Grant DE-AC02-05CH11231]. The work of R. Jiang was supported in part by the U.S. National Science Foundation, Division of Electrical, Communications and Cyber Systems [Grant ECCS-1845980] and the U.S. Air Force Office of Scientific Research [Grant FA9550-23-1-0323]. Supplemental Material: The software that supports the findings of this study is available within the paper and its Supplemental Information ( https://pubsonline.informs.org/doi/suppl/10.1287/ijoc.2025.1210 ) as well as from the IJOC GitHub software repository ( https://github.com/INFORMSJoC/2025.1210 ). The complete IJOC Software and Data Repository is available at https://informsjoc.github.io/ .

Estrada-Garcia, Juan-Alberto↗

The Energy Transition: Advanced Nuclear Needed but Address Climate Vulnerabilities Now

The term “Energy Transition” is an attempt to capture an elaborate set of activities related to the modernization and decarbonization of energy grids. Performed concurrently and often in an ad hoc manner across local, state, regional and national boundaries, it is bringing chaos to what should arguably be one of the most conservatively managed of all critical infrastructure sectors. What’s more, with climate change producing an increasing tempo of extreme events, confidence in the intended resilient and redundant structure of the electric grids is likely to ebb. Even without these climate induced stressors, the nation’s electric grid was built for an earlier century. In addition to a drive towards greater efficiency via digitization and a continuing price decline in distributed energy resources (DERs), one could argue that climate change concerns are the primary driver of the energy transition. Non-CO2 emitting generation sources like wind and solar have become an important part of the overall generation fleet, albeit ones that cannot be counted upon to provide dispatchable power. Current projections indicate deployment of even larger percentages of DERs in coming years. Until far better storage capabilities arrive, the variability of wind and solar, inconsistent performance of traditional thermal generation plants, and energy delivery failures associated with natural gas pipelines will reinforce mounting reliability concerns. This pertains to both electric transmission and distribution. The recent shuttering of nuclear power plants in Germany, Japan, the US and elsewhere are also putting more downward pressure on dispatchable generation. Russia’s attack on Ukraine has roiled energy markets worldwide and forced some countries to return to coal as a primary fuel. In view circumstances such as these, it is essential that significant changes be made to policies and planning criteria, and to the standards and code on which they are based. Given the accelerating pace of extreme weather events, this needs to occur as soon as possible.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Model-Adaptive Relaying Applied to Microgrid Protection

In microgrids, the short-circuit current magnitude is significantly limited by more than an order of magnitude due to the relatively small inverter-based resources. Commercially available protective devices for distribution cannot reliably protect a microgrid due to their dependence on the magnitude of the fault current. Moreover, overcurrent relays typically cannot function properly for a microgrid because they are incapable of detecting faults and/or performing the coordination between the relays in inverter-based microgrids operated in the islanded mode. This paper proposes a model-adaptive relay designed to adjust the relay curves based on the available generation and the network topology. The proposed method runs a real-time model of the microgrid, which gathers information from the network to calculate the available short-circuit current in the specified node. The fault current from the model is then used for the adaptive algorithm to calculate the relay settings, considering coordination with the downstream fuses and upstream reclosers. This work presents the validation of the proposed method in Hardware-in-the-Loop, in a hardware testbed as well as field deployed in a real microgrid in East-Tennessee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standard Operating Procedure for Optimal Deployment of Meteorological Instrumentation Within the Solar Radiation Research Laboratory (BMS and RMS SOP)

The objective of the National Renewable Energy Laboratory's (NREL's) Solar Radiation Research Laboratory (SRRL) is to collect and use high-quality solar radiation data sets for research leading to the widespread adoption of solar technologies. To appropriately populate and track the diverse array of instruments at the NREL-SRRL, NREL has established a Standard Operating Procedure (SOP) for optimal instrument deployment within the SRRL for both the Baseline Measurement System (BMS) and the Research Measurement System (RMS). Using best practices methodologies, the NREL-SRRL maintains a varied and extensive array of solar monitoring equipment to test, evaluate, and characterize the solar sensors used by federal and international agencies as well as the solar industry to determine the solar resource. The SOP provides the industry with guidance for solar resource assessment and is used for procedures in the long-term continuous monitoring of legacy instruments alongside state-of-the-art instruments. Based on the SOP, instruments are annually evaluated for continued deployment. Instruments that do not meet the SOP criteria are decommissioned, and new instruments that meet the criteria are deployed. Streamlining and optimizing the use of this facility ensures that the lab continues to be a world-leading solar calibration and measurement facility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This fact sheet provides an overview of the results and outcomes from the Communities LEAP technical assistance process.

Communities Leap↗

Reliability Barriers to Enhanced Solar PV Deployment: Selected Research Findings - State Outreach Technical Sessions

This presentation provides summaries of three reports selected from a body of work that examines potential reliability challenges related to planning future power systems with higher solar photovoltaic (PV) penetrations in the western United States. The three topics covered are 1) Power system flexibility requirements and supply; 2) Resource adequacy and the capacity credit of solar; 3) Simulating distributed energy resource responses to transmission system-level faults considering IEEE 1547 performance categories on three major WECC transmission paths. The full reports and related resources are available at the project website, https://www.westernenergyboard.org/western-interstate-energy-board/barrier-mitigation-to-enhanced-distributed-solar-photovoltaic/. This presentation is targeted toward a technical audience. A companion policy presentation provides higher-level summaries of the same material.

distributed energy resource↗

Network upgrade exploiting multi band: S- or E-band?

Nowadays, the fiber spectrum is only partially exploited, i.e., mainly in the C-band and more recently in the C + L-band, where the fiber attenuation profile experiences the minimum. Thus, fiber communications technology—amplifiers, switching, transceivers, etc.—and networking solutions are mature for those spectrum bands. However, the continuous increase in traffic means that capacity saturation of the current infrastructure is looming. Taking advantage of the unused portions of the spectrum (e.g., the S- and E-bands) may be an efficient solution to accommodate an increase in traffic without installing new fibers. Research is thus investigating multi-band transmission and networking to evaluate and enable such network upgrades. Some issues need to be solved or taken into account, from the enabling technology (e.g., amplifiers in the S- or E-band are still under development) to physical layer effects previously neglected, such as stimulated Raman scattering (SRS). SRS affects wideband transmission, potentially degrading active channels. The contribution of this paper is the investigation of network upgrades for C + L-band systems. In particular, upgrades exploiting the E- and S-bands are compared taking into account each band capacity and the effects of SRS on both new and already deployed channels (in both the C- and L-bands). A detailed analysis of the physical layer is provided also in the presence of guard bands between previously exploited bands and the bands used for upgrade. By leveraging the physical layer assessment, a networking analysis is carried out to evaluate the supported traffic increase and also the signal quality degradation due to SRS on active channels. Overall, the results suggest that upgrades to the E- and S-bands support a comparable increase in traffic. However, the exploitation of the E-band with 14 THz of guard band between the C- and E-bands may avoid detrimental effects to already active channels in the C + L-band, suggesting this upgrade strategy can be the most effective of the two.

47 OTHER INSTRUMENTATION↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗