Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The Mars Technology Program

Future Mars missions require new capabilities that currently are not available. The Mars Technology Program (MTP) is an integral part of the Mars Exploration Program (MEP). Its sole purpose is to assure that required technologies are developed in time to enable the baselined and future missions. The MTP is a NASA-wide technology development program managed by JPL. It is divided into a Focused Program and a Base Program. The Focused Program is tightly tied to the proposed Mars Program mission milestones. It involves time-critical deliverables that must be developed in time for infusion into the proposed Mars 2005, and, 2009 missions. In addition a technology demonstration mission by AFRL will test a LIDAR as part of a joint NASNAFRL experiment. This program bridges the gap between technology and projects by vertically integrating the technology work with pre-project development in a project-like environment with critical dates for technology infusion. A Base Technology Program attacks higher riskhigher payoff technologies not in the critical path of missions.

technology Mars exploration lander rover sample re↗

How We Can Constrain Aerosol Type Globally

In addition to aerosol number concentration, aerosol size and composition are essential attributes needed to adequately represent aerosol-cloud interactions (ACI) in models. As the nature of ACI varies enormously with environmental conditions, global-scale constraints on particle properties are indicated. And although advanced satellite remote-sensing instruments can provide categorical aerosol-type classification globally, detailed particle microphysical properties are unobtainable from space with currently available or planned technologies. For the foreseeable future, only in situ measurements can constrain particle properties at the level-of-detail required for ACI, as well as to reduce uncertainties in regional-to-global-scale direct aerosol radiative forcing (DARF). The limitation of in situ measurements for this application is sampling. However, there is a simplifying factor: for a given aerosol source, in a given season, particle microphysical properties tend to be repeatable, even if the amount varies from day-to-day and year-to-year, because the physical nature of the particles is determined primarily by the regional environment. So, if the PDFs of particle properties from major aerosol sources can be adequately characterized, they can be used to add the missing microphysical detail the better sampled satellite aerosol-type maps. This calls for Systematic Aircraft Measurements to Characterize Aerosol Air Masses (SAM-CAAM). We are defining a relatively modest and readily deployable, operational aircraft payload capable of measuring key aerosol absorption, scattering, and chemical properties in situ, and a program for characterizing statistically these properties for the major aerosol air mass types, at a level-of-detail unobtainable from space. It is aimed at: (1) enhancing satellite aerosol-type retrieval products with better aerosol climatology assumptions, and (2) improving the translation between satellite-retrieved aerosol optical properties and species-specific aerosol mass and size that are tracked in aerosol transport and climate models used to assess aerosol forcing and its anthropogenic components. This presentation will summarize where we stand on the development of the SAM-CAAM concept.

DARF↗

Artificial Intelligence: Powering Human Exploration of the Moon and Mars

Artificial Intelligence (AI) is a growing field of computa- tional science techniques designed to mimic functions per- formed by people. Advancements in autonomy will depend on a portfolio of AI technologies. Automated planning and scheduling is a venerable field of study in AI, and is needed for a variety of mission planning functions. Plan execution technology is less well studied, but important for auton- omy and robotics. Specialized forms of automated reason- ing and machine learning are key technologies to enable fault management. Over the past decade, the NASA Au- tonomous Systems and Operations (ASO) project has devel- oped and demonstrated numerous autonomy enabling tech- nologies employing AI techniques. Our work has employed AI in three distinct ways to enable autonomous mission op- erations capabilities. Crew Autonomy gives astronauts tools to assist in the performance of each of these mission oper-ations functions. Vehicle System Management uses AI tech- niques to turn the astronaut's spacecraft into a robot, allow- ing it to operate when astronauts are not present, or to reduce astronaut workload. AI technology also enables Autonomous Robots as crew assistants or proxies when the crew are not present. When these capabilities are used to enable astro- nauts to operate autonomously, they must be integrated with user interfaces, introducing numerous human factors con- siderations; when these capabilities are used to enable vehi- cle system management, they must be integrated with flight software, and run on embedded processors under the control of real-time operating systems.We first describe human spaceflight mission operations capabilities. The remainder of the paper will describe the ASO project, and the development and demonstration per- formed by ASO since 2011. We will describe the AI tech- niques behind each of these demonstrations, which include a variety of symbolic automated reasoning and machine learn- ing based approaches. Finally, we conclude with an assess- ment of future development needs for AI to enable NASA's future Exploration missions.

Mission Operations↗

NASA’s Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which company or companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

HLS↗

NASA's Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

Lisa Watson-Morgan↗

NASA’s Artemis Human Landing Systems: Enabling Lunar Exploration

On March 26, 2019, in keeping with Space Policy Directive-1, NASA was charged with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the transportation in deep space to carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. On April 30, 2020, NASA announced the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement: A Blue Origin-led team including Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. The companies began work in a multi-month base period during which NASA teams will work with the companies to streamline requirements, to establish standards and methods, to review required products and to share the NASA’s expertise in human spaceflight systems development. Following the base period, which ends in the spring of 2021, NASA will determine which company or companies will develop Artemis human landing systems for the initial demonstration missions, including the goal of landing on the Moon in 2024.This paper examines how the Human Landing System program is at the center of NASA’s Artemis lunar exploration program, designed to yield groundbreaking science, develop and utilize lunar surface resources and leverage the Moon as a proving ground for future Mars missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability.

Lisa Watson-Morgan↗

Design and Testing of Autonomous Distributed Space Systems

Distributed Space Systems (DSS) are an emerging class of mission designs that enable new scientific and commercial opportunities. In order to enable those new opportunities, these systems will need to have significantly expanded autonomous capabilities compared to their single-spacecraft predecessors. In this paper, we present Distributed Spacecraft Autonomy (DSA) project, a payload on NASA's Starling spacecraft experiment. We first describe a step-by-step process for characterizing what features are needed in an autonomous DSS, and show how this process applied to DSA. We then describe the Starling mission, a four-spacecraft swarm hosting multiple DSS payloads. We then describe DSA, which will mature in-space networking and autonomous planning technologies to measure topside ionosophere features using data from the Starling spacecraft's GPS receivers. We describe how DSA will coordinate observations of GPS satellites using Starling's underlying communications infrastructure combined with novel DSS technology. The flight validation of DSS technology will provide mature technology to enable future DSS missions.

Nicholas Cramer↗

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

Characterization of in-Space Propulsion Trade Space to Support Initial Human Mars Segment

The National Aeronautics and Space Administration’s Exploration Systems Development Mission Directorate has been developing architecture concepts for human missions to Mars in alignment with the agency’s Moon to Mars blueprint objectives. The focus of the Architecture Development Office has been to decompose the blueprint objectives into the characteristics and needs for both lunar and Mars missions and develop functional needs to enable an integrated end-to-end mission architecture. One of the key components of a human Mars mission is the in-space transportation system that delivers crew and cargo to Mars vicinity and return crew safely back to Earth. The Mars Architecture Team has been evaluating four in-space transportation options to satisfy this functional need: 1) Hybrid Nuclear Electric/ Chemical Propulsion, 2) Nuclear Thermal Propulsion, 3) Hybrid Solar Electric/ Chemical Propulsion, and 4) All-Chemical propulsion. To answer the question “which transportation option is best?” decision makers will need to understand the performance characteristics—and limitations—for each architecture in the context of their preferred metric. Each option could be considered “better” than the others, depending on whether the primary selection criteria is fast, cheap, maximum cross-government applicability, maximizes commercial capabilities, and/or any other desired metrics. The Mars Architecture Team has completed considerable analysis on the Hybrid Nuclear Electric/Chemical Propulsion concept over the past three years. The Space Nuclear Propulsion program has also conducted significant work on the Nuclear Thermal Propulsion concept. The Hybrid Solar Electric/Chemical Propulsion concept, derived from technology planned for the Gateway program, was originally configurated for minimum vehicle stack mass (and, hence, minimum Earth-launched mass/cost), leveraging a highly efficient propulsion system on a minimum energy Conjunction Class trajectory. Historically, All-Chemical concepts were considered impractical due to the enormous propellant mass required, even for minimum energy Conjunction Class/long stay mission opportunities. However, considering the emerging commercial heavy-lift capabilities, the concept must be reevaluated across a range of concepts that leverage reusable launch vehicle capabilities to reduce the cost of launching large quantities of transportation elements needed for missions of various duration. This paper aims to provide an overview of the in-space transportation assessment work that is on-going within NASA.

Mars↗

NASA's Next Generation Launch Technology Program - Strategy and Plans

The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.

Hueter, Uwe↗

Applied technology center business plan and market survey

Business plan and market survey for the Applied Technology Center (ATC), computer technology transfer and development non-profit corporation, is presented. The mission of the ATC is to stimulate innovation in state-of-the-art and leading edge computer based technology. The ATC encourages the practical utilization of late-breaking computer technologies by firms of all variety.

Hodgin, Robert F.↗

NASA ATP Force Measurement Technology Capability Strategic Plan

The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.

Rhew, Ray D.↗

Integrated propulsion technology demonstrator. Program plan

NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

Source record↗

A decision support system for technology R&D planning: connecting the dots from information to innovation

This paper describes an information technology innovation developed to assist decision makers faced with complex R&D tasks. The decision support system (DSS) was developed and applied to the analysis of a 10-year, 700 million dollar technology program for the exploration of Mars. The technologies were to enable a 4.8 billion dollar portfolio of exploration flight missions to Mars.

DSS↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗