Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Experiments and Modeling to Support Field Test Design

Disposition of heat-generating nuclear waste (HGNW) remains a continuing technical and sociopolitical challenge. We define HGNW as the combination of both heat generating defense high level waste (DHLW) and civilian spent nuclear fuel (SNF). Numerous concepts for HGNW management have been proposed and examined internationally, including an extensive focus on geologic disposal (c.f. Brunnengräber et al., 2013). One type of proposed geologic material is salt, so chosen because of its viscoplastic deformation that causes self-repair of damage or deformation induced in the salt by waste emplacement activities (Hansen and Leigh, 2011). Salt as a repository material has been tested at several sites around the world, notably the Morsleben facility in Germany (c.f. Fahland and Heusermann, 2013; Wollrath et al., 2014; Fahland et al., 2015) and at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, NM. Evaluating the technical feasibility of a HGNW repository in salt is an ongoing process involving experiments and numerical modeling of many processes at many facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing socially and economically generative, resilient PV-energy systems for low- and moderate-income communities: Applications for Puerto Rico (Final Technical Report)

The nexus of energy and poverty is one of the most significant long-term challenges facing the energy and electricity sectors, with negative feedback loops between energy-related costs, risks, and insecurities, on the one hand, and diverse other social and economic insecurities, on the other, helping to undermine health, wellbeing, and resilience in low- and moderate-income communities around the US and the world (Biswas et al. 2022). The transition of energy systems to clean energy alternatives offers a potential opportunity to redesign future energy arrangements in ways that, instead, create beneficial social value for communities, reverses the energy-poverty nexus, and enhances community wellbeing (Biswas et al. 2020; Miller et al. 2018). The promise of clean energy transitions to address the energy-poverty nexus is especially significant when designed using principles of just energy transitions. To leverage just clean energy transitions to accomplish a reversal of the energy-poverty nexus requires improvement in three capabilities: (1) Understanding and mapping the community-scale dynamics and variability of the energy-poverty nexus, which vary considerably from community to community; (2) Evaluating the technical, social, and economic potential for different clean energy system designs to deliver social value to specific communities; and (3) Working collaboratively with communities to imagine and design clean energy systems solutions that meet their needs, fit their capabilities and contexts, and deliver multiple forms of community-desired social value/benefits that help reverse key facets of the energy-poverty nexus. This project developed a portfolio of novel tools, methodological approaches, and collaborative partnerships with four communities in Puerto Rico that further the objective of building these three capabilities.

14 SOLAR ENERGY↗

Pilot Testing of WRI'S Novel Mercury Control Technology by Pre-Combustion Thermal Treatment of Coal

The challenges to the coal-fired power industry continue to focus on the emission control technologies, such as mercury, and plant efficiency improvements. An alternate approach to post-combustion control of mercury, while improving plant efficiency deals with Western Research Institute's (WRI)'s patented pre-combustion mercury removal and coal upgrading technology. WRI was awarded under the DOE's Phase III Mercury program, to evaluate the effectiveness of WRI's novel thermal pretreatment process to achieve >50% mercury removal, and at costs of <$30,000/lb of Hg removed. WRI has teamed with Etaa Energy, Energy and Environmental Research Center (EERC), Foster Wheeler North America Corp. (FWNA), and Washington Division of URS (WD-URS), and with project co-sponsors including Electric Power Research Institute (EPRI), Southern Company, Basin Electric Power Cooperative (BEPC), Montana-Dakota Utilities (MDU), North Dakota Industrial Commission (NDIC), Detroit Edison (DTE), and SaskPower to undertake this evaluation. The technical objectives of the project were structured in two phases: Phase I--coal selection and characterization, and bench-and PDU-scale WRI process testing and; and Phase II--pilot-scale pc combustion testing, design of an integrated boiler commercial configuration, its impacts on the boiler performance and the economics of the technology related to market applications. This report covers the results of the Phase I testing. The conclusion of the Phase I testing was that the WRI process is a technically viable technology for (1) removing essentially all of the moisture from low rank coals, thereby raising the heating value of the coal by about 30% for subbituminous coals and up to 40% for lignite coals, and (2) for removing volatile trace mercury species (up to 89%) from the coal prior to combustion. The results established that the process meets the goals of DOE of removing <50% of the mercury from the coals by pre-combustion methods. As such, further testing, demonstration and economic analysis as described in the Phase II effort is warranted and should be pursued.

01 COAL, LIGNITE, AND PEAT↗

Performance Evaluation of an Occupancy-Based HVAC Control System in an Office Building

As new algorithms incorporate occupancy count information into more sophisticated HVAC control, these technologies offer great potential for reductions in energy costs while enhancing flexibility. This study presents results from a two-year field evaluation of an occupancy-based HVAC control system installed in an office building. Two wings on each of the building’s 2–11 floors were equipped with occupancy counters to learn occupancy patterns. In combination with proprietary machine learning algorithms and thermal modeling, the occupancy data were leveraged to implement optimized start, early closure, and adjustments to fan operation at the air handling unit (AHU) level. This study conducted a holistic evaluation of technical performance, cost-effectiveness analysis, and user satisfaction. Results show the platform reduced weekday AHU run times by 2 h and 35 min per AHU per day during the pandemic time period. Simulation shows that 6.1% annual whole-building savings can be achieved when the building is fully occupied. The results are compared with prior studies, and potential drivers are discussed for future opportunities. The assessment results shed light on the expected in-the-field performance for researchers and industry stakeholders and enabled practical considerations as the technology strives to move beyond research-grade pilot trials into product-grade deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Offshore Wind Farm Turbine and Energy Storage Optimization

Abstract This paper evaluates the technical and economic feasibility of repurposing decommissioned offshore oil and gas platforms as electrical substations for offshore wind projects in the U.S. Gulf of America, a region characterized by relatively low and highly variable wind speeds, extensive legacy offshore infrastructure, and exposure to merchant electricity markets. A unified techno-economic framework is developed using the Repurposing Offshore Infrastructure for Continued Energy (ROICE) Economic Model (REM) to integrate Gulfspecific wind resource assessment, commercial wind turbine performance, offshore infrastructure cost modeling, and wholesale electricity market exposure. Gulf wind speed data are vertically extrapolated to turbine hub height and combined with manufacturer power curves to compute annual energy production and capacity factors across a broad portfolio of commercial turbines, enabling identification of turbine designs best suited for low-wind offshore environments. Hourly electricity price data from the Midcontinent Independent System Operator (MISO) day-ahead market are incorporated to characterize revenue potential, price volatility, and the temporal alignment between wind generation and market conditions. In addition, a conceptual framework for offshore battery energy storage system (BESS) integration is developed to support future investigation of market-responsive energy shifting at repurposed platforms. Results from the turbine evaluation demonstrate that machines with lower cut-in wind speeds and earlier ‘rated-power’ characteristics significantly outperform larger, industry-standard offshore turbines for the same net power under Gulf wind conditions, underscoring the need for region-specific technology selection. Market analysis further reveals substantial price variability and limited intrinsic alignment between wind production and high-price periods, motivating consideration of operational flexibility mechanisms. While storage optimization is not implemented in this study, the REM framework establishes a transparent and replicable foundation for co-evaluating turbine selection, infrastructure constraints, and market exposure, providing a practical pathway for assessing the potential role of repurposed offshore platforms in enabling economically viable offshore wind development in the Gulf of America.

02 PETROLEUM↗

Status on the Component Models Developed in the Modelica Framework: High-Temperature Steam Electrolysis Plant & Gas Turbine Power Plant

This report has been prepared as part of an effort to design and build a modeling and simulation (M&S) framework to assess the economic viability of a nuclear-renewable hybrid energy system (N-R HES). In order to facilitate dynamic M&S of such an integrated system, research groups in multiple national laboratories have been developing various subsystems as dynamic physics-based components using the Modelica programming language. In fiscal year (FY) 2015, Idaho National Laboratory (INL) performed a dynamic analysis of two region-specific N-R HES configurations, including the gas-to-liquid (natural gas to Fischer-Tropsch synthetic fuel) and brackish water reverse osmosis desalination plants as industrial processes. In FY 2016, INL has developed two additional subsystems in the Modelica framework: a high-temperature steam electrolysis (HTSE) plant and a gas turbine power plant (GTPP). HTSE has been proposed as a high priority industrial process to be integrated with a light water reactor (LWR) in an N-R HES. This integrated energy system would be capable of dynamically apportioning thermal and electrical energy (1) to provide responsive generation to the power grid and (2) to produce alternative industrial products (i.e., hydrogen and oxygen) without generating any greenhouse gases. A dynamic performance analysis of the LWR/HTSE integration case was carried out to evaluate the technical feasibility (load-following capability) and safety of such a system operating under highly variable conditions requiring flexible output. To support the dynamic analysis, the detailed dynamic model and control design of the HTSE process, which employs solid oxide electrolysis cells, have been developed to predict the process behavior over a large range of operating conditions. As first-generation N-R HES technology will be based on LWRs, which provide thermal energy at a relatively low temperature, complementary temperature-boosting technology was suggested for integration with the HTSE process that requires higher temperature input. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES. A natural-gas fired GTPP has been proposed as a secondary energy supply to be included in an N-R HES. This auxiliary generator could be used to cover rapid dynamics in grid demand that cannot be met by the remainder of the N-R HES. To evaluate the operability and controllability of the proposed process during transients between load (demand) levels, the dynamic model and control design were developed. Special attention was given to the design of feedback controllers to regulate the power frequency, and exhaust gas and turbine firing temperatures. Several case studies were performed to investigate the system responses to the major disturbance (power load demand) in such a control system. The simulation results show that the performance of the proposed control strategies was satisfactory under each test when the GTPP experienced high rapid variations in the load.

08 HYDROGEN↗

Evaluation of Dry Sorbent Injection Technology for Pre-Combustion CO{sub 2} Capture

This document summarizes the work performed on Cooperative Agreement DE-FE0000465, “Evaluation of Dry Sorbent Technology for Pre-Combustion CO{sub 2} Capture,” during the period of performance of January 1, 2010 through September 30, 2013. This project involves the development of a novel technology that combines a dry sorbent-based carbon capture process with the water-gas-shift reaction for separating CO{sub 2} from syngas. The project objectives were to model, develop, synthesize and screen sorbents for CO{sub 2} capture from gasified coal streams. The project was funded by the DOE National Energy Technology Laboratory with URS as the prime contractor. Illinois Clean Coal Institute and The University of Illinois Urbana-Champaign were project co-funders. The objectives of this project were to identify and evaluate sorbent materials and concepts that were suitable for capturing carbon dioxide (CO{sub 2}) from warm/hot water-gas-shift (WGS) systems under conditions that minimize energy penalties and provide continuous gas flow to advanced synthesis gas combustion and processing systems. Objectives included identifying and evaluating sorbents that efficiently capture CO{sub 2} from a gas stream containing CO{sub 2}, carbon monoxide (CO), and hydrogen (H{sub 2}) at temperatures as high as 650 °C and pressures of 400-600 psi. After capturing the CO{sub 2}, the sorbents would ideally be regenerated using steam, or other condensable purge vapors. Results from the adsorption and regeneration testing were used to determine an optimal design scheme for a sorbent enhanced water gas shift (SEWGS) process and evaluate the technical and economic viability of the dry sorbent approach for CO{sub 2} capture. Project work included computational modeling, which was performed to identify key sorbent properties for the SEWGS process. Thermodynamic modeling was used to identify optimal physical properties for sorbents and helped down-select from the universe of possible sorbent materials to seven that were deemed thermodynamically viable for the process. Molecular modeling was used to guide sorbent synthesis through first principles simulations of adsorption and regeneration. Molecular dynamics simulations also modeled the impact of gas phase impurities common in gasified coal streams (e.g., H{sub 2}S) on the adsorption process. The role of inert dopants added for mechanical durability to active sorbent materials was also investigated through molecular simulations. Process simulations were conducted throughout the project to help determine the overall feasibility of the process and to help guide laboratory operating conditions. A large component of the program was the development of sorbent synthesis methods. Three different approaches were used: mechanical alloying (MA), flame spray pyrolysis (FSP), and ultrasonic spray pyrolysis (USP). Sorbents were characterized by a host of analytical techniques and screened for SEWGS performance using a thermogravimetric analyzer (TGA). A feedback loop from screening efforts to sorbent synthesis was established and used throughout the project lifetime. High temperature, high pressure reactor (HTPR) systems were constructed to test the sorbents at conditions mimicking the SEWGS process as identified through process modeling. These experiments were conducted at the laboratory scale to examine sorbents for their CO{sub 2} capacity, conversion of CO to CO{sub 2}, and impacts of adsorption and regeneration conditions, and syngas composition (including impurities and H2O:CO ratio). Results from the HTPR testing showed sorbents with as high as 0.4 g{sub CO{sub 2}}/g{sub sorbent} capacity with the ability to initially shift the WGS completely towards CO{sub 2}/H{sub 2}. A longer term experiment with a simple syngas matrix and N{sub 2}/steam regeneration stream showed a USP sorbent to be stable through 50 adsorption-regeneration cycles, though the sorbent tested had a somewhat diminished initial capacity. The program culminated in a technoeconomic assessment in which two different approaches were taken; one approach was intended to be technically conservative while the second required several key engineering challenges to be met in order to succeed. The project team is confident that, with the proper support, those challenges could be met. The second approach relies on a slipstream of H{sub 2} from the shifted syngas and O{sub 2} from an air separation unit (ASU) to be combusted in the presence of the sorbent for regeneration; termed a regenerating boiler. The approach also makes use of the heat of adsorption to generate >400 MW of turbine quality steam; total plant gross energy output as high as 1 GW was estimated for an IGCC with an initial gross energy output of 737 MW, without any additional coal usage. The regenerating boiler concept could benefit further from additional heat integration, but the results of this effort show a COE of $97.50 per MWh for a rational combination of operating parameters and sorbent lifetime as well as conservative estimates for steam turbines, gas turbine, and ASU. If the COE of CO{sub 2} transmission, storage and monitoring ($5.60 / MWh) is added to the base case for an IGCC ($81.30 / MWh for Case 5 from the DOE Bituminous Coal Report), the cost of CO{sub 2} capture for the regenerating boiler was only $10.60 / MWh; other regenerating boiler cases are as low $6.90 / MWh. The project met all agreed upon milestones and was completed within budget, more than 25% cost share provided by the project team. Results from the program showed that the SEWGS process has great promise, and with further study and evaluation could become a component of a comprehensive carbon capture program. SEWGS requires a paradigm shift in the traditional approach to carbon capture because the regenerating boiler concept is not a ‘back-end’ solution to CO{sub 2} mitigation. Rather, it is an integral part of the plant operations and is responsible for generating more electricity than the IGCC itself. Schemes could be envisioned where the H{sub 2} production is used exclusively to regenerate the sorbent, with any excess sold as a commodity, and the heat of adsorption serving as the primary driver for power generation. Further work with sorbent evaluation, process modeling and heat integration, and scale-up would be needed to more fully vet SEWGS, but the culmination of this program indicates that additional study is warranted.

20 FOSSIL-FUELED POWER PLANTS↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Telemetric Catheter-Based Pressure Sensor for Hemodynamic Monitoring: Experimental Experience

The purpose of this study was to evaluate the technical and animal experimental feasibility of a percutaneously implantable pulmonary arterial implant for permanent hemodynamic monitoring. Two systems for measuring pulmonary artery pressure (PAP) as well as pulmonary artery occlusion pressure (PAOP) were developed by modifying a commercially available pulmonary artery catheter (PAC). First, a cable-bound catheter-based system was designed by implementation of a capacitive absolute-pressure sensor in the catheter tip. This system was developed further into a completely implantable telemetric system. The devices were tested in an acute setting in a total of 10 sheep. The implant was placed with its tip in the descending pulmonary artery via the right jugular approach. Results were compared with conventional PAC positioned in the contralateral pulmonary artery using Pearson's correlation coefficients and Bland-Altman plots. Implantation of the monitoring systems was uneventful in 10 animals. Data from two fully functional cable-bound and telemetric pressure monitoring systems were available, with a total of 18,506 measurements. There was an excellent correlation between reference data and the data obtained with the implants (r = 0.9944). Bland-Altman plots indicated a very good agreement between the techniques. We report the development and successful initial test of an implantable catheter-based device for long-term measurement of PAP and PAOP. Both devices may be applicable for hemodynamic monitoring. Further long-term studies for assessing reliability and durability of the device are warranted.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Clinical Application of a New Indwelling Catheter with a Side-Hole and Spirally Arranged Shape-Memory Alloy for Hepatic Arterial Infusion Chemotherapy

A new indwelling catheter, G-spiral (GSP), was developed for hepatic arterial infusion chemotherapy (HAIC) by way of an implanted catheter-port system (CPS). Here we evaluated its physical properties and the outcomes of its clinical use. The GSP vessel-fixing power and its ability to follow a guidewire were determined with a vascular in vitro model, and Student t test was used to determine statistical significance (P < 0.05). A retrospective analysis was performed to evaluate the technical success rate and to identify the clinical complications associated with radiologic CPS implantation with GSP in 65 patients with unresectable hepatic tumors. The mean vessel-fixing power of the GSP (14.4 g) significantly differed from that of a GSP with a cut shape-memory alloy (3.3 g). The mean resistance to following the guidewire displayed by the GSP (88.5 g) was significantly less than that for a 5F W-spiral (106.3 g) or 4F Cobra-type angiographic catheter (117.8 g). The CPS was placed successfully in 64 of 65 cases (98.5%). Hepatic artery occlusion was observed in one case. Occlusion, cracking, and infection of CPS were observed in one, two, and one case, respectively. The GSP is a highly useful indwelling catheter that can be used for HAIC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Patients with Life-Threatening Arterial Renal Hemorrhage: CT Angiography and Catheter Angiography with Subsequent Superselective Embolization

The purpose of this study was to evaluate the technical and clinical success of superselective embolization in patients with life-threatening arterial renal hemorrhage undergoing preinterventional CT angiography. Forty-three patients with clinical signs of life-threatening arterial renal hemorrhage underwent CT angiography and catheter angiography. Superselective embolization was indicated in the case of a positive catheter angiography. Primary study goals were technical and clinical success of superselective embolization. Secondary study goals were CT angiographic and catheter angiographic image findings and clinical follow-up. The mean time interval between CT angiography and catheter angiography was 8.3 {+-} 10.3 h (range, 0.2-34.1 h). Arterial renal hemorrhage was identified with CT angiography in 42 of 43 patients (98%) and catheter angiography in 39 of 43 patients (91%) (overview angiography in 4 of 43 patients [9%], selective angiography in 16 of 43 patients [37%], and superselective angiography in 39 of 43 patients [91%]). Superselective embolization was performed in 39 of 43 patients (91%) and technically successful in 37 of 39 patients (95%). Therefore, coil embolization was performed in 13 of 37 patients (35%), liquid embolization in 9 of 37 patients (24%), particulate embolization in 1 of 37 patients (3%), and a combination in 14 of 37 patients (38%). Clinical failure occurred in 8 of 39 patients (21%) and procedure-related complications in 2 of 39 patients (5%). The 30-day mortality rate was 3%. Hemoglobin decreased significantly prior to intervention (P < 0.001) and increased significantly after intervention (P < 0.005). In conclusion, superselective embolization is effective, reliable, and safe in patients with life-threatening arterial renal hemorrhage. In contrast to overview and selective angiography, only superselective angiography allows reliable detection of arterial renal hemorrhage. Preinterventional CT angiography is excellent for detection and localization of arterial renal hemorrhage and appropriate for guidance of the embolization procedure.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Endovascular Treatment of Acute Arterial Hemorrhage in Trauma Patients Using Ethylene Vinyl Alcohol Copolymer (Onyx)

Purpose: This study was designed to determine the feasibility and efficacy of endovascular embolization with liquid embolic agent ethylene vinyl alcohol copolymer (Onyx) in patients with acute traumatic arterial bleeding. Methods: This is a retrospective review of 13 patients (9 men and 4 women; mean age 45 years) with severe trauma who underwent embolotherapy using Onyx from November 2003 to February 2009. Bleeding was located in the pelvis (5 patients), kidney (3 patients), mesenteric region (2 patients), retroperitoneal space (2 patients), neck (1 patient), and thigh (1 patient). In three cases (23.1%), Onyx was used in conjunction with coils. We evaluate the technical and clinical success, procedural and embolization time, occurrence of rebleeding, and embolotherapy-related complications, such as necrosis or migration of Onyx into nontarget vessels. Results: In all patients, embolotherapy was technically and clinically successful on the first attempt. Control of bleeding could be reached with a mean time of 19 (range, 4-63) min after correct placement of the microcatheter in the feeding artery. No recurrent bleeding was detected. No unintended necrosis or migration of Onyx into a nontarget region was observed. During the follow-up period, three patients (23.1%) died due to severe intracranial hemorrhage, cardiac arrest, and sepsis. Conclusions: Transcatheter embolization with new liquid embolic agent Onyx is technically feasible and effective in trauma patients with acute arterial hemorrhage.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Primary Infrarenal Aortic Stenting With or Without Iliac Stenting for Isolated and Aortoiliac Stenoses: Single-Centre Experience With Long-Term Follow-Up

The purpose of this study was to evaluate the technical success, complications, long-term clinical outcome, and patency after primary infrarenal aortic stenting for aortic and aortoiliac stenosis. Between January 1999 and January 2006, 22 consecutive patients underwent endovascular treatment because of infrarenal aortic stenosis with and without common iliac stenosis (10 men; mean age 64 {+-} 14 years). Eleven (11 of 22) patients had an isolated aortic stenosis, whereas 11 of 22 had aortic stenosis that extended into the common iliac arteries (CIAs). Thirteen patients were Rutherford classification type 3, and 9 patients were type 4. Statistical analysis included paired Student t test and Kaplan-Meier life table analysis; p < 0.05 was considered significant. Technical and initial clinical success was achieved in all patients. There were three (14 %) procedure-related complications, which included two access-point pseudoaneurysms and one non-flow-limiting left external iliac dissection. Patients were followed-up for a mean period of 88 months (range 60-132). Mean preprocedure ankle brachial pressure indexes (ABPI) were 0.60 {+-} -0.15 (right) and 0.61 {+-} -0.16 (left). After the procedure they were 0.86 {+-} -0.07 (right) and 0.90 {+-} -0.09 (left). The increase in ABPI was significant (p < 0.05), and this continued throughout follow-up. Four (18 %) patients had recurrence of symptoms during follow-up. These occurred at 36, 48, 48, and 50 months after the original procedure. All four patients were successfully treated with repeat angioplasty procedures. There was a significant difference in primary patency between isolated aortic stenosis (100 %) and aortoiliac stenosis (60 %) (p = 0.031). Cumulative follow-up was 1920 months yielding a reintervention rate of 0.025/events/year. Primary stenting of infrarenal stenosis is safe and successful with a low reintervention rate. It should be considered as first-line treatment for patients with infrarenal aortic stenotic disease.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Microwave Ablation of Pulmonary Malignancies Using a Novel High-energy Antenna System

To evaluate the technical success, safety, and imaging follow-up of malignant pulmonary nodules treated with a novel high-energy percutaneous microwave ablation (MWA) system. Between July 2010 and September 2011, a total of 23 patients, 12 men, mean age 68 (range 30-87) years with 29 pulmonary malignancies of median diameter 19 (range 8-57) mm, underwent computed tomography (CT)-guided MWA with a 16G microwave needle antenna enabling power up to 180 W. Technical success was defined as needle placement in the intended lesion without death or serious injury. Adequacy of ablation was assessed at 24 h on contrast-enhanced CT. Circumferential solid or ground glass opacification >5 mm was used to define an ideal ablation. Local tumor recurrence was assessed at 1, 3, and 6 months after ablation on contrast-enhanced CT. MWA was technically successful in 93 % (n = 27). Mean ablation duration was 3.6 (range 1-9) min. Ten patients (43 %) developed a pneumothorax as a result of the MWA; only 3 (13 %) required placement of a chest drain. Thirty-day mortality rate was 0 %. The mean hospital stay was 1.5 (range 1-7) days. A total of 22 lesions (75 %) were surrounded by {>=}5 mm ground glass or solid opacification after the procedure. At a median follow-up of 6 months, local recurrence was identified in 3 out of 26 lesions, giving a local control rate of 88 %. MWA using a high-power antenna of pulmonary malignancies is safe, technically achievable, and enables fast ablation times.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Transcatheter Embolisation of Proximal Type 1 Endoleaks Following Endovascular Aneurysm Sealing (EVAS) Using the Nellix Device: Technique and Outcomes

AimTo evaluate the technical success and mid-term outcomes following transcatheter embolisation of type 1a endoleak after Nellix endovascular aneurysm sealing (EVAS).Materials and MethodsSeven patients (5 men; mean age 83; range 79–90) underwent transcatheter embolisation between July 2013 and August 2014. The average time from EVAS to embolisation was 136 days (range 6–301) and from endoleak diagnosis to embolisation was 20 days (range 2–50). Embolisation was performed with coils and Onyx in six cases and Onyx only in one case. Technical success, imaging and clinical outcomes of embolisation were reviewed. Technical success was defined as elimination of the endoleak on completion angiography and first imaging follow-up. Clinical success was defined as unchanged or decreased aneurysm sac size on subsequent follow-up (average 8 months; range 103–471 days).ResultsAll cases were technically successful. One patient required a second endovascular procedure following Onyx reflux into the Nellix endograft and another patient required surgical closure of a brachial puncture site. All patients are endoleak free with stable sac size on the latest available follow-up imaging.ConclusionIf a type 1 endoleak occurs after EVAS, embolisation using Onyx with or without coils is feasible and effective with high technical success and freedom from endoleak recurrence at mid-term follow-up.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Malignant Hilar Biliary Obstruction: Treatment by Means of Placement of a Newly Designed Y-Shaped Branched Covered Stent

PurposeTo evaluate the technical feasibility and clinical efficacy of placement of a newly designed Y-shaped branched covered stent for palliative treatment of malignant hilar biliary obstruction.MethodsFrom June 2011 to September 2014, 34 consecutive patients with malignant hilar biliary obstruction underwent percutaneous placement of a Y-shaped branched covered stent for palliative treatment. Technical and clinical success, complications, cumulative patient survival, and stent patency were evaluated.ResultsStent placement was technically successful in all patients. All patients showed adequate biliary drainage on the follow-up cholangiogram. Mean serum bilirubin level (10.9 mg/dl) decreased significantly 1 week (5.7 mg/dl) and 1 month (2.6 mg/dl) after stent placement (p < 0.01). Complications associated with the procedure included hemobilia (n = 3) and biloma (n = 1). During the mean follow-up period of 225 (range 12–820) days, nine patients (26.5 %) developed stent occlusion caused by tumor overgrowth (n = 8) and sludge (n = 1). Two of them underwent coaxial placement of a second stent with good results. The median survival time was 281 days and median primary stent patency was 337 days. There were no significant differences in the patient survival and stent patency rates in relation to age, sex, or Bismuth type.ConclusionPercutaneous placement of the Y-shaped branched covered stent seems to be technically feasible and clinically effective for palliative treatment of malignant hilar biliary obstruction.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Stent Retriever Thrombectomy in Different Thrombus Locations of Anterior Cerebral Circulation

BackgroundMechanical thrombectomy (MT) is a safe and efficient treatment for acute ischemic stroke in patients with proximal anterior occlusion and large penumbra. We evaluated the technical and clinical success of MT in relation to the location of the occlusion (internal carotid artery, M1 and M2 segments of the middle cerebral artery).MethodsWe prospectively reviewed 130 patients of whom 105 met the inclusion criteria. Baseline clinical, procedural and imaging variables, technical outcome (TICI, thrombolysis in cerebral infarction), 24 h imaging outcome and three-month clinical outcome (mRS, modified Rankin Scale) were recorded. Differences between the groups were studied with statistical tests according to the type of the variable.ResultsThere were 37, 46 and 22 patients in the internal carotid artery (ICA), M1 and M2 groups, respectively. TICI 2b or 3 was achieved in 92 cases (88 %) with a non-significant trend towards a better recanalization outcome in the ICA and M1 groups. Overall, 57 of the 105 patients (55 %) experienced favorable clinical outcome (mRS ≤ 2) with no significant differences between the groups. Excellent outcome (mRS ≤ 1) was seen in 40 patients (39 %) and there proportionally more patients with excellent outcome in the ICA and M1 groups (ICA: 44 %, M1: 41 %, M2: 23 % of patients, p = 0.22).ConclusionsThere were no statistically significant differences in the technical or clinical outcomes between the different sites of occlusion (ICA, M1 or M2). There was a non-significant trend towards achieving excellent clinical outcome (3-month mRS ≤ 1) more often and better recanalization results in the two more proximal locations.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Endovascular Recanalization of Thromboangiitis Obliterans (Buerger’s Disease) in Twenty-Eight Consecutive Patients and Combined Antegrade–Retrograde Intervention in Eight Patients

Purpose: The aim of the study was to evaluate the technical success of the procedure and the clinical efficacy of treatment in patients with thromboangiitis obliterans (TAO) (Buerger’s disease) based on a change in the Rutherford classification. Materials and Methods: A total of 28 consecutive patients (26 males, 2 females, mean age 43.3 ± 5.32 years) underwent endovascular recanalization with a diagnosis of TAO, between April 2015 and July 2018. After unsuccessful attempts using the antegrade approach, retrograde approaches were used in 8 patients under ultrasound guidance. Clinical follow-up was routinely performed at 1-month, 3-month, 6-month, and 1-year intervals. Results: A total of 28 TAO patients underwent 40 procedures in 32 limbs. Technical success was achieved in 28 of the 32 limbs (87.5%). In total, 45 of 59 (76.2%) below the knee arteries were treated successfully. One major amputation was performed, providing a 96.8% rate for limb salvage both at 12 and 24 months. Amputation-free survival estimated by Kaplan–Meier analysis was 84% at 12 and 24 months. Primary patency rates at 12, 24, and 36 months were 84%, 78%, and 75%, respectively. Secondary patency rates were 87.5% both at 12 and 24 months. Conclusion: Endovascular treatment is a technically feasible and potentially effective treatment modality for Buerger’s disease. Combined antegrade and retrograde interventions in TAO patients may improve technical success and clinical recovery, especially in cases where the antegrade approach has failed.

62 RADIOLOGY AND NUCLEAR MEDICINE↗