Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Servicer system demonstration plan and capability development

An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

Source record↗

An expert system for planning and scheduling in a telerobotic environment

A knowledge based approach to assigning tasks to multi-agents working cooperatively in jobs that require a telerobot in the loop was developed. The generality of the approach allows for such a concept to be applied in a nonteleoperational domain. The planning architecture known as the task oriented planner (TOP) uses the principle of flow mechanism and the concept of planning by deliberation to preserve and use knowledge about a particular task. The TOP is an open ended architecture developed with a NEXPERT expert system shell and its knowledge organization allows for indirect consultation at various levels of task abstraction. Considering that a telerobot operates in a hostile and nonstructured environment, task scheduling should respond to environmental changes. A general heuristic was developed for scheduling jobs with the TOP system. The technique is not to optimize a given scheduling criterion as in classical job and/or flow shop problems. For a teleoperation job schedule, criteria are situation dependent. A criterion selection is fuzzily embedded in the task-skill matrix computation. However, goal achievement with minimum expected risk to the human operator is emphasized.

Ntuen, Celestine A.↗

Progress in knowledge representation research

Brief descriptions are given of research being carried out in the field of knowledge representation. Dynamic simulation and modelling of planning systems with real-time sensor inputs; development of domain-independent knowledge representation tools which can be used in the development of application-specific expert and planning systems; and development of a space-borne very high speed integrated circuit processor are among the projects discussed.

Lum, Henry↗

Apollo guidance, navigation and control: Guidance system operations plan for manned CM earth orbital and lunar missions using Program COLOSSUS 3. Section 3: Digital autopilots (revision 14)

Digital autopilots for the manned command module earth orbital and lunar missions using program COLOSSUS 3 are discussed. Subjects presented are: (1) reaction control system digital autopilot, (2) thrust vector control autopilot, (3) entry autopilot and mission control programs, (4) takeover of Saturn steering, and (5) coasting flight attitude maneuver routine.

Source record↗

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE↗

Connecting Minds: AI Use Cases to Bridge Power Systems and Large Language Models for Practical Applications

Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From hybrid systems to universal plans via domain compilation

While universal plans tell a system how to reach a goal regardless of what state it is in, such plans are typically too large to represent. Hybrid systems execute plans where each action is implemented to robustly produce effects if the world does not stray outside the action's control envelopes.

embedded real-time planning↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mission planning for space based satellite surveillance experiments with the MSX

The Midcourse Space Experiment is a BMDO-sponsored scientific satellite set for launch within the year. The satellite will collect phenomenology data on missile targets, plumes, earth limb backgrounds and deep space backgrounds in the LWIR, visible and ultra-violet spectral bands. It will also conduct functional demonstrations for space-based space surveillance. The Space-Based Visible sensor, built by Lincoln Laboratory, Massachusetts Institute of Technology, is the primary sensor on board the MSX for demonstration of space surveillance. The SBV Processing, Operations and Control Center (SPOCC) is the mission planning and commanding center for all space surveillance experiments using the SBV and other MSX instruments. The guiding principle in the SPOCC Mission Planning System was that all routine functions be automated. Manual analyst input should be minimal. Major concepts are: (I) A high level language, called SLED, for user interface to the system; (2) A group of independent software processes which would generally be run in a pipe-line mode for experiment commanding but can be run independently for analyst assessment; (3) An integrated experiment cost computation function that permits assessment of the feasibility of the experiment. This paper will report on the design, implementation and testing of the Mission Planning System.

Sridharan, R.↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

Inspection and Verification of Domain Models with PlanWorks and Aver

When developing a domain model, it seems natural to bring the traditional informal tools of inspection and verification, debuggers and automated test suites, to bear upon the problems that will inevitably arise. Debuggers that allow inspection of registers and memory and stepwise execution have been a staple of software development of all sorts from the very beginning. Automated testing has repeatedly proven its considerable worth, to the extent that an entire design philosophy (Test Driven Development) has been developed around the writing of tests. Unfortunately, while not entirely without their uses, the limitations of these tools and the nature of the complexity of models and the underlying planning systems make the diagnosis of certain classes of problems and the verification of their solutions difficult or impossible. Debuggers provide a good local view of executing code, allowing a fine-grained look at algorithms and data. This view is, however, usually only at the level of the current scope in the implementation language, and the data-inspection capabilities of most debuggers usually consist of on-line print statements. More modem graphical debuggers offer a sort of tree view of data structures, but even this is too low-level and is often inappropriate for the kinds of structures created by planning systems. For instance, god or constraint networks are at best awkward when visualized as trees. Any any non-structural link between data structures, as through a lookup table, isn't captured at all. Further, while debuggers have powerful breakpointing facilities that are suitable for finding specific algorithmic errors, they have little use in the diagnosis of modeling errors.

Bedrax-Weiss, Tania↗

Intelligent Tools for Planning Knowledge base Development and Verification

A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

errors↗

Guidance system operations plan for manned CM earth orbital missions using program Skylark 1. Section 2: Data links

A computer program to define the digital uplink and downlink for use in manned command module orbital missions is presented. The subjects discussed are: (1) digital uplink to command module, (2) CMC digital downlink, (3) downlist formats, (4) description of telemetered qualities, (5) flagbits, and (6) effects of Fresh Start (V36) and Hardware Restart on flagword and channel bits.

Hamilton, M. H.↗

Apollo guidance, navigation and control: Guidance system operations plans for manned LM earth orbital and lunar missions using Program COLOSSUS 3. Section 7: Erasable memory programs

Erasable-memory programs (EMPs) designed for the guidance computers used in the command (CMC) and lunar modules (LGC) are described. CMC programs are designated COLOSSUS 3, and the associated EMPs are identified by a three-digit number beginning with 5. LGC programs are designated LUMINARY 1E, and the associated EMPs are identified, with one exception, by a three-digit number beginning with 1. The exception is EMP 99. The EMPs vary in complexity from a simple flagbit setting to a long and intricate logical structure. They all, however, cause the computer to behave in a way not intended in the original design of the programs; they accomplish this off-nominal behavior by some alteration of erasable memory to interface with existing fixed-memory programs to effect a desired result.

Hamilton, M. H.↗