Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Imaging Station Multi-Foil Target

The Axis II Downstream Transport (DST) of the Dual Axis Radiographic Hydrodynamic Testing (DARHT) Facility is the final subassembly of the particle accelerator whose primary objective is to focus the 4-pulse beam as it enters the Target Region. Before the beam reaches the Target Region, it passes through two imaging stations located in the DST. At Imaging Station E (ISE) and Imaging Station C (ISC), diagnostics are conducted and experimenters study beam physics using specialized targets. Different targets are used depending on the objective of the study. The desire to conduct specific experiments has driven a need for a multi-foil target. This new design has been engineered to allow for new capabilities, and diagnostics to be studied at ISC. To accommodate new parameters, three different configurations have been conceived. Although each of the three designs differ from each other, their function and purpose remain consistent. Each target is engineered to secure a variable amount of target foils at variable spacing while Imaging Station experiments are conducted. Beam diagnostics and data from the targets are analyzed through various sized viewports on the imaging stations. The objective of this technical note is to document the purpose and functionality of the targets. Design considerations, assembly instructions, and maintenance recommendations are also discussed. Additionally, each target and its respective advantages and disadvantages are covered in detail.

43 PARTICLE ACCELERATORS↗

Metocean Reference Station Best Practices: MORS-1 Case Study

The goal of a Metocean Reference Station should be to aid both near-term development of the offshore wind energy industry as well as long-term climate and energy research. Capitalizing on existing shared-use facilities wherever possible, reference stations should provide data valued by industry users as well as research users in a cost-effective way. Cost-effectiveness is a critical component of developing a reference site, as the real value of the site's data collection efforts is the length of the time series it is able to sustain. This report seeks to lay out the best practices toward developing and maintaining metocean reference stations in the United States. The best practices described here focus on suitable platforms, sensor integration, and long-term operations of the reference station itself, as best practices of operations for individual sensors for the research community or validation enterprises focused on industrial use of metocean data are well described in the literature. This work focuses on potential stations in the United States because the market for reference data and validation facilities is less well defined in the United States, given the young age of the rapidly emerging offshore wind energy industry here.

17 WIND ENERGY↗

Innovating High Throughput Hydrogen Stations: Cooperative Research and Development Final Report, CRADA Number CRD-18-00773

Hydrogen stations today serve the emerging market of light duty fuel cell vehicles, primarily in California with over 30 public retail locations. There has been a steady increase in the number of stations open and hydrogen dispensed, especially in the last two years. From 2015 to 2016, the annual amount of hydrogen dispensed increased from 27,400 kg to 109,200 kg, a nearly fourfold increase in just one year. One station dispensed nearly 12,000 kg in the second quarter of 2017. Despite the significant progress, gaps exist between current infrastructure capabilities and future requirements. For example, fuel cell vehicle applications such as buses, medium-duty, and heavy-duty trucks will gain market share and this must be considered as future customers at hydrogen stations. The expected number of light duty fuel cell vehicles in California alone are expected to grow from approximately 4,000 to over 13,000 by 2020, and 37,000 by 2023. To serve the multiple mobile fuel cell technologies and increased demand, hydrogen stations will have to increase output, decrease cost, and improve reliability. To address these challenges, the project team will demonstrate a hydrogen-focused integrated renewable energy production, storage, and transportation fuel distribution/retailing system. The proposed R&D tasks address key challenges related to light duty station/component reliability and development and validation of high flow rate system models for new applications like medium and heavy-duty truck fueling.

08 HYDROGEN↗

LATERAL-RANGE AND HYPERSONIC LIFT-DRAG-RATIO REQUIREMENTS FOR EFFICIENT FERRY SERVICE FROM A NEAR-EARTH MANNED SPACE STATION

The operation of any long-term manned space station will require some type of ferry vehicle to transport men and equipment to and from the station with regularity and reliability. Such a vehicle, designed for entry at near-orbital speeds, could also be useful in the return from any deeper space mission if either an earth-orbit rendezvous terminal maneuver or a maneuver combining atmospheric braking and a near-earth parking orbit is used. This study was undertaken to determine the class of vehicle which could be most efficiently used as a ferry vehicle between a near-earth space station and the earth. One measure of this efficiency is the ability of the vehicle to reach pre-chosen landing sites with some prescribed frequency. In considering this frequency of return it is necessary to consider not only the normal mode of operation in which only infrequent returns are scheduled at desirable times, but also operation under various degrees of emergency, which dictate quick or even immediate return to earth. In extreme emergencies, when immediate return to earth is necessary, choice of landing site becomes impractical. In most cases, however, although it might be required to abandon the station quickly, the ferry vehicle could remain in orbit for some time before initiating reentry in order to land at a prechosen site. The allowable delay time in orbit would be determined primarily by the capabilities of the ferry life-support system. This paper will examine the geometry of the ferry ranging problem, that is, the lateral ranges required to reach chosen landing sites from various near-earth orbits, and will investigate and compare several means of achieving these ranges. The particular case considered is that of returning from a space station which is in a circular orbit at an altitude of 200 statute miles, but the results obtained are not sensitive to orbit altitude for orbits within a few hundred miles of the surface. From this orbit, the vehicle will retro and reenter at very close to satellite velocity. The downrange problem can be handled by proper timing of the retrofiring , and the desired lateral range can be achieved by aerodynamics, space propulsion to change orbit plane, atmospheric propulsion, or combinations of these methods. The relative cost in terms of weight of using these different methods to achieve lateral range will be discussed.

Hypersonic vehicle↗

Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

Source record↗

NASA directory of observation station locations, volume 1

Geodetic information is presented for NASA tracking stations and observation stations in the NASA geodetic satellites program. A geodetic data sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums, and on selected world geodetic systems when available information permits.

Source record↗

Modular space station detailed preliminary design. Volume 1: Sections 1 through 4.4

Detailed configuration and subsystems preliminary design data are presented for the modular space station concept. Each module comprising the initial space station is described in terms of its external and internal configuration, its functional responsibilities to the initial cluster, and its orbital build up sequence. Descriptions of the subsequent build up to the growth space station are also presented. Analytical and design techniques, tradeoff considerations, and depth of design detail are discussed for each subsystem. The subsystems include the following: structural/mechanical; crew habitability and protection; experiment support; electrical power; environmental control/life support; guidance, navigation, and control; propulsion; communications; data management; and onboard checkout subsystems. The interfaces between the station and other major elements of the program are summarized. The rational for a zero-gravity station, in lieu of one with artificial-gravity capability, is also summarized.

Source record↗

A shuttle and space station manipulator system for assembly, docking, maintenance cargo handling and spacecraft retrieval (preliminary design). Volume 1: Management summary

A preliminary design is established for a general purpose manipulator system which can be used interchangeably on the shuttle and station and can be transferred back and forth between them. Control of the manipulator is accomplished by hard wiring from internal control stations in the shuttle or station. A variety of shuttle and station manipulator operations are considered including servicing the Large Space Telescope; however, emphasis is placed on unloading modules from the shuttle and assembling the space station. Simulation studies on foveal stereoscopic viewing and manipulator supervisory computer control have been accomplished to investigate the feasibility of their use in the manipulator system. The basic manipulator system consists of a single 18.3 m long, 7 degree of freedom (DOF), electrically acutated main boom with an auxiliary 3 DOF electrically actuated, extendible 18.3 m maximum length, lighting, and viewing boom. A 3 DOF orientor assembly is located at the tip of the viewing boom to provide camera pan, tilt, and roll.

Source record↗

Modular space station Phase B extension preliminary performance specification. Volume 2: Project

The four systems of the modular space station project are described, and the interfaces between this project and the shuttle project, the tracking and data relay satellite project, and an arbitrarily defined experiment project are defined. The experiment project was synthesized from internal experiments, detached research and application modules, and attached research and application modules to derive a set of interface requirements which will support multiple combinations of these elements expected during the modular space station mission. The modular space station project element defines a 6-man orbital program capable of growth to a 12-man orbital program capability. The modular space station project element specification defines the modular space station system, the premission operations support system, the mission operations support system, and the cargo module system and their interfaces.

Source record↗

Earth's gravity field to the eighteenth degree and geocentric coordinates for 104 stations from satellite and terrestrial data

Geodetic parameters describing the earth's gravity field and the positions of satellite-tracking stations in a geocentric reference frame were computed. These parameters were estimated by means of a combination of five different types of data: routine and simultaneous satellite observations, observations of deep-space probes, measurements of terrestrial gravity, and surface-triangulation data. The combination gives better parameters than does any subset of data types. The dynamic solution used precision-reduced Baker-Nunn observations and laser range data of 25 satellites. Data from the 49-station National Oceanic and Atmospheric Administration BC-4 network, the 19-station Smithsonian Astrophysical Observatory Baker-Nunn network, and independent camera stations were employed in the geometrical solution. Data from the tracking of deep-space probes were converted to relative longitudes and distances to the earth's axis of rotation of the tracking stations. Surface-gravity data in the form of 550-km squares were derived from 19,328 1 deg X 1 deg mean gravity anomalies.

Gaposchkin, E. M.↗

ATS-F ground station integration

The ATS ground stations were described, including a system description, operational frequencies and bandwidth, and a discussion of individual subsystems. Each station configuration is described as well as its floor plan. The station performance, as tested by the GSI, is displayed in chart form providing a summary of the more important parameters tested. This chart provides a listing of test data, by site, for comparison purposes. Also included is a description of the ATS-6 experiments, the equipment, and interfaces required to perform these experiments. The ADP subsystem and its role in the experiments is also described. A description of each program task and a summary of the activities performed were then given. These efforts were accomplished at the Rosman II Ground Station, located near Rosman N.C., the Mojave Ground Station, located near Barstow Ca., and the GSI Contractors plant located near Baltimore, Md.

Source record↗

Space power demonstration stations

NASA major planning decisions from 1955 to date are summarized and new concepts connected with the advent of the Space Transportation Systems (STS) are set forth. The future Shuttle utilizations are considered, from 'manned booster' function for space transportation to such operations as deployment of modules and stations and assembly of large structures in space. The permanent occupancy of space will be a major goal of the space systems development in the 1980's with the following main phases: (1) achievement of easy access to earth orbit by means of the Shuttle and Spacelab; (2) achievement of permanent occupancy (Space Stations); (3) self-sufficiency of man in space. New techniques of space operation will become possible, using much larger, complicated satellites and simplified ground stations. Orbital assembly of large stations, using a permanent base in orbit, will enable practical utilization of space systems for everyday needs. Particular attention is given to the space solar power concept, involving the location in space of large satellite systems. Results of the studies on Manned Orbital Systems Concept (MOSC) and some future possibilities of Space Stations are analyzed.

Freitag, R. F.↗

Estimate of procession and polar motion errors from planetary encounter station location solutions

Jet Propulsion Laboratory Deep Space Station (DSS) location solutions based on two JPL planetary ephemerides, DE 84 and DE 96, at eight planetary encounters were used to obtain weighted least squares estimates of precession and polar motion errors. The solution for precession error in right ascension yields a value of 0.3 X 10 to the minus 5 power plus or minus 0.8 X 10 to the minus 6 power deg/year. This maps to a right ascension error of 1.3 X 10 to the minus 5 power plus or minus 0.4 X 10 to the minus 5 power deg at the first Voyager 1979 Jupiter encounter if the current JPL DSS location set is used. Solutions for precession and polar motion using station locations based on DE 84 agree well with the solution using station locations referenced to DE 96. The precession solution removes the apparent drift in station longitude and spin axis distance estimates, while the encounter polar motion solutions consistently decrease the scatter in station spin axis distance estimates.

Pease, G. E.↗

Central station market development strategies for photovoltaics

Federal market development strategies designed to accelerate the market penetration of central station applications of photovoltaic energy system are analyzed. Since no specific goals were set for the commercialization of central station applications, strategic principles are explored which, when coupled with specific objectives for central stations, can produce a market development implementation plan. The study includes (1) background information on the National Photovoltaic Program, photovoltaic technology, and central stations; (2) a brief market assessment; (3) a discussion of the viewpoints of the electric utility industry with respect to solar energy; (4) a discussion of commercialization issues; and (5) strategy principles. It is recommended that a set of specific goals and objectives be defined for the photovoltaic central station program, and that these goals and objectives evolve into an implementation plan that identifies the appropriate federal role.

Source record↗

Current NASA space station planning

Design considerations, trials, and actions both taken and necessary in the future which lead to the establishment of a space station by NASA are reviewed. Human performance on board Skylab demonstrated the feasibility and benefits of continuous operation of a space station. The manned orbital systems concept (MOSC) program, keeping in close contact with potential users, resulted in station requirements which included support for 720 day missions, up to four specialists per payload, 8-10 kW power, a 230 x 200 n mi altitude orbit, orbit change capability of 28.5 deg, all attitude orientation, and stability to within 1,100,000 g. Although the concept will not be funded, it provides a guide for incremental growth of a manned station from previously unmanned science platforms. Initiation of hardware development is projected for 1984-85. The agencies, both domestic and international, and missions for which the station will be built, are discussed.

Culbertson, P. E.↗

Requirements for a space station

Near-term requirements which will guide the design of a manned space station in near-earth orbit are considered. A primary focus will be establishing a base for astronomical observations which demand long term integration times. Earth observation systems such as the thematic mappers and SAR can be utilized by a free flyer in sunsynchronous orbit. Biological experiments can be carried out only with pressurized modules, ultimately large enough for humans habitation. At first, expendables would be ferried up from earth, while over time the space station would become a closed-loop system. An orbital transfer vehicle is necessary for the repair of satellites stationed in higher energy orbits. The operations of the station would include checking out communications satellites before boost into GEO. Finally, the station would be the final staging point for interplanetary and/or asteroid intercept missions.

Herman, D. H.↗

Targeting space station technologies

NASA's Space Station Technology Steering Committee has undertaken the definition of the level of technology that is desirable for use in the initial design and operation of an evolutionary, long service life space station, as well as the longer term technology required for the improvement of capabilities. The technology should initially become available in 1986, in order to support a space station launch as early as 1990. Toward this end, the committee seeks to assess technology forecasts based on existing research and testing capacity, and then plan and monitor a program which will move current technology to the requisite level of sophistication and reliability. The Space Shuttle is assumed to be the vehicle for space station delivery, assembly, and support on a 90-day initial cycle. Space station tasks will be military, commercial, and scientific, including on-orbit satellite servicing.

Olstad, W. B.↗

Space-station crew-safety requirements

Baseline rescue and survival concepts for future space station crews are described. Preliminary studies are being carried out to identify potential threats to crew safety and means to counteract the dangers. Significant factors being considered include the type of threat, the warning time, the number of crewmembers, strategies for protection of the crew (including life-support measures redundancy), and the dependence of space station crews on ground personnel. Attention is being given to the impact of safety devices on the space station geometry and cost, as well as the equipment necessary to maintain the crew in a psychological status positive enough to cope with emergencies. Typical threats would be fire, crewmember illness or injury, and abandonment of the station. A Shuttle launch could take up to 12 days, while equipping the space station with an emergency return capsule would permit return on the same day as the capsule was occupied.

Witcofski, R. D.↗