Distributionally-robust chance constrained and interval optimization for integrated electricity and natural gas systems optimal power flow with wind uncertainties
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
It had become a standard practice to constrain the particle’s tune footprint while designing the ring lattice so that the particle tunes fit between harmful resonances that limit ring dynamic aperture (DA). This approach, known as “tune confinement”, puts tight limits on the magnitude of the tune shifts with amplitude and with momentum. The latter requires labor-intensive optimization of the off-energy dynamic aperture and control over the corresponding tune footprint for the large energy deviations and is a prerequisite to achieving reasonable lifetime if it is dominated by the Touschek scattering. As nonlinearities of the modern ring lattices are much enhanced as compared with the previous generation of synchrotron light sources, it is becoming more and more difficult to keep the off-momentum tune footprint confined. While one could reach reasonable on-energy DA suitable for injection into the machine, the off-energy DA optimization is much more complex and needs to satisfy more constraints so to reach large energy acceptance and secure decent lifetime at the high ring current. In certain cases when the lattice solution with the confined off-energy tune footprint cannot be found, one may ask whether crossing of a resonance stopband from off-momentum particle will lead to loss of this particle. Intuitively, if the particle crosses the stopband quickly, one may expect that the betatron oscillation amplitude will not increase substantially thereby keeping the particle within the machine acceptance. At the same time the tight tolerances of the modern lattice elements as designed and produced afford much narrower resonance stopbands being compared with the machines built decades ago. Under these circumstances the question above may be asked as what are the conditions for operating a ring with a large chromatic tune footprint, which crosses resonances, while not observing particle losses. In this paper we try to answer the questions above by studying the model of a particle with large initial momentum deviation (as, for example, driven by the Touschek scattering event), which crosses stopband of a half-integer resonance while executing synchrotron oscillations in the highly chromatic ring lattice.
The ability to localize and map the distribution of gamma-ray emitting radionuclides in 3D has applications ranging from medical imaging to nuclear security. In the case of radiological source search and nuclear contamination remediation, the deployment of freely moving detection systems such as hand- held instruments or ground/aerial-based vehicles are critical in overcoming the inverse square law and complex shielding scenarios. Using contextual sensors, these systems can simultaneously generate 3D maps of the surrounding environment and track the position and orientation of the gamma-ray sensitive detectors in that environment. The fusion of contextual scene data and gamma-ray detector data to facilitate real-time 3D gamma-ray image reconstruction has been demonstrated with mobile HPGe and CdZnTe-based Compton cameras for gamma-ray energies ranging from a few hundred keV to several MeV. Here we apply this approach for lower energy (50-400 keV) gamma-rays, using a hand-held CdZnTe-based omnidirectional imaging system and an active coded mask imaging modality. Here, we present our approach to real-time reconstruction using a scene data constrained GPU- accelerated list-mode MLEM algorithm and show results from several measurements in the lab and in the field.
New domestic, renewable energy resources must be considered to increase energy security in the U.S. Ethanol production through second-generation (cellulosic) feedstocks will help the U.S. meet the legislative Renewable Fuel Standard, which mandates 36 billion gallons of renewable fuels by 2022. Yet, conversion of cropland to meet the cellulosic feedstock production goals may have unforeseen environmental consequences. Here, using Soil Water Assessment Tool (SWAT) outputs and National Agricultural Statistics Service (USDA NASS) economic data, we conducted a spatial optimization of bioenergy feedstock introduction into the Arkansas White-Red River Basin based on water quality and economic objectives, subject to constraints on total land conversion. Results displayed tradeoffs between bioenergy yield for three crops (switchgrass, sorghum and poplar) and land rent objectives. Optimal solutions tended to prioritize conversion of land in eastern AWR subbasins where yield and water quality objective improvements were greatest. A small number of subbasins contributed to basin-wide water quality improvements, whereas subbasins contributing to economic benefits were more spatially dispersed, indicating that water quality responses are more likely to constrain feedstock placement. Biomass production targets can be met vianumerous spatial arrangements, whereas marginal improvement in water quality objectives can best be achieved by selectively siting perennial feedstocks in the eastern half of the region.
Smart Grid situational awareness is provided by Energy Management Systems. A core process of these systems is State Estimation. The great majority of state estimators model the Smart Grid through a set of nonlinear algebraic equations, named the measurement model. Problem formulation considers the Gauss solution. Several model improvements have been presented regarding the Gauss solution, aiming between others to provide measurement noise robustness to the state estimation process. While considerable effort has been focused on such developments, state estimation is still constrained by the implicit modelling error, and thus inevitably vulnerable to cyber-threats. In this work, a state estimation bi-level formal model is presented towards Smart Grids enhanced situational awareness considering the concepts of synthetic measurements and innovation. Comparative test results with the state-of-the-art on the IEEE 14-bus system are presented highlighting improved situational awareness to bad data. Easy-to-implement model, without hard-to-derive parameters, built-on the classic weighted least squares solution, highlight potential aspects for real-life implementation.
Rapid innovations in satellite and airborne remote sensing capabilities holds the promise of collecting high-resolution imagery with daily, even hourly cadence across the entire planet. Availability of such earth observation data streams at varying spatial and temporal scales, coupled with astonishing progress in AI and transformational advances in high performance computing bring into view the possibility of mapping and interpreting the surface of our planet at unprecedented detail. The implications of such capability for science, technology, policy, and security are far reaching. Moreover, even at a modest 5m resolution, 100 trillion pixels will describe the surface of the Earth every day. Consequently, monitoring the pulse of our planet will entail collecting, refining, analyzing, and curating those 100 trillion pixels within a 24-hour period. That is a challenge with unknown solutions as of today’s advances and therefore serves as a key motivation for this workshop. The GEOINT and AI communities have a unique opportunity to enable detailed monitoring the pulse of our planet and obtain new insights into how humans occupy, interact with, and alter the surface of the Earth over time. From a science and technology standpoint, this is a modern-day moonshot that presents numerous challenges particularly related to scaling the analysis to every pixel covering the planet. The challenge of making sense of all these pixels in a timely fashion include image processing at scale, selective analysis of only the pixels that matter, generalizing AI models across heterogeneous locations, computing on hardware that is memory constrained, and deploying automated feature extraction on edge devices. The designing of capable GeoAI workflows and data pipelines will require interdisciplinary efforts and partnerships. The Trillion Pixel Challenge for GeoAI workshop was is promoted as a first community effort to discuss priority research and development directions and to establish the partnerships and collaborations needed to make progress on critical scientific and operational applications from local to regional to planet scale.
Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)
Historically, scientific computing efforts have demonstrated the clear need for, and effective use of, supercomputing with traditional time-stepped simulations. Nevertheless, there are several areas in the mission spaces of the U.S. Department of Energy and other agencies waiting to tap advanced computing research using a different, discrete event style of modeling, simulation, and analysis. These span a wide spectrum of applications including energy grid resilience, urban planning and policy, transportation science, building technologies, emergency response and planning, environmental impact analysis, computational epidemiology, Internet communications, cyber security, and cyber-physical systems, to name only a few. Even within traditional scientific applications, the role of discrete event modes of execution is increasing in the form of new event-based mathematical solvers such as quantized state integration methods and discrete-continuous hybrid system solvers. Co-design of advanced supercomputing hardware systems is another area that exploits discrete event simulation at its core for effective analyses. Complex systems, entity behaviors and interconnections play a significant role in all these applications, which are mapped to large-scale models with discrete event formulations. To make advancements in all the aforementioned scientific areas, many technical aspects need to be more thoroughly studied and deeply understood in parallel discrete event simulation (PDES). The unique dynamics inherent in a discrete event modeling approach, by their very nature, intersect and influence the entire stack of the computing system, including (a) the unique nature of the instruction sets exercised in PDES workloads without a predominance of high-precision floating point operations, (b) virtual time-constrained multi-threaded execution of many logical processes per processor, (c) extremely variable and difficult to predict network traffic characteristics, (d) interfaces and inter-dependencies with machine learning and artificial intelligence codes at higher software layers, and (e) highly challenging load balancing needs, especially in effectively accounting for accelerated/extremely heterogeneous computing in current and future high-performance computing systems. Efficient and accurate parallel execution of PDES workloads is also dominated by challenges in dealing with their asynchronous concurrency fundamentally present at the model level. Conservative synchronization, optimistic/speculative synchronization, and their hybrid schemes open new questions in fundamental computer science with respect to reversibility of computation and prediction (lookahead) of behaviors inherent within model codes. On the implementation front, there are relatively few scalable, general-purpose parallel discrete event simulators in the world, and even fewer have been studied on emerging hardware platforms. To enable scientific advances using PDES, the research needs in computer science must also be pursued and met in the intersection of the algorithmic and hardware-aware aspects of scalable PDES engines. This report is aimed at capturing a computer science-oriented view of this important area of research in PDES, presenting a sample of important applications with their inherent discrete event technology elements. Needs are outlined in core areas of parallel discrete event research as well as cross-cutting directions in computer science research that positively impact scientific advancements across several important application areas. A selection of priority research opportunities in advanced computing for PDES is identified to serve as reference for key research topics and their order of importance for scientific advancements.
The deep, wide-area (∼800–900 arcmin{sup 2}) near-infrared/WFC3/IR + Spitzer/IRAC observations over the CANDELS fields have been a remarkable resource for constraining the bright end of high-redshift UV luminosity functions. However, the lack of Hubble Space Telescope (HST) 1.05 μm observations over the CANDELS fields has made it difficult to identify z ∼ 9–10 sources robustly, since such data are needed to confirm the presence of an abrupt Lyman break at 1.2 μm. Here, we report on the successful identification of many such z ∼ 9–10 sources from a new HST program (z9-CANDELS) that targets the highest-probability z ∼ 9–10 galaxy candidates with observations at 1.05 μm, to search for a robust Lyman-break at 1.2 μm. The potential z ∼ 9–10 candidates were preselected from the full HST, Spitzer/IRAC S-CANDELS observations, and the deepest-available ground-based optical+near-infrared observations (CFHTLS-DEEP+HUGS+UltraVISTA+ZFOURGE). We identified 15 credible z ∼ 9–10 galaxies over the CANDELS fields. Nine of these galaxies lie at z ∼ 9 and five are new identifications. Our targeted follow-up strategy has proven to be very efficient in making use of scarce HST time to secure a reliable sample of z ∼ 9–10 galaxies. Through extensive simulations, we replicate the selection process for our sample (both the preselection and follow-up) and use it to improve current estimates for the volume density of bright z ∼ 9 and z ∼ 10 galaxies. The volume densities we find are 5{sub −2}{sup +3}× and 8{sub −3}{sup +9}× lower, respectively, than those found at z ∼ 8. When compared with the best-fit evolution (i.e., d log{sub 10} ρ{sub UV}/dz=−0.29±0.02) in the UV luminosity densities from z ∼ 8 to z ∼ 4 integrated to 0.3L{sub z=3}{sup ∗} (−20 mag), these luminosity densities are 2.6{sub −0.9}{sup +1.5}× and 2.2{sub −1.1}{sup +2.0}× lower, respectively, than the extrapolated trends. Our new results are broadly consistent with the “accelerated evolution” scenario at z > 8, consistent with that seen in many models.
We present new observations from Z-Spec, a broadband 185-305 GHz spectrometer, of five submillimeter bright lensed sources selected from the Herschel-Astrophysical Terahertz Large Area Survey science demonstration phase catalog. We construct a redshift-finding algorithm using combinations of the signal to noise of all the lines falling in the Z-Spec bandpass to determine redshifts with high confidence, even in cases where the signal to noise in individual lines is low. We measure the dust continuum in all sources and secure CO redshifts for four out of five (z {approx} 1.5-3). In one source, SDP.17, we tentatively identify two independent redshifts and a water line, confirmed at z = 2.308. Our sources have properties characteristic of dusty starburst galaxies, with magnification-corrected star formation rates of 10{sup 2-3} M{sub Sun} yr{sup -1}. Lower limits for the dust masses ({approx} a few 10{sup 8} M{sub Sun }) and spatial extents ({approx}1 kpc equivalent radius) are derived from the continuum spectral energy distributions, corresponding to dust temperatures between 54 and 69 K. In the local thermodynamic equilibrium (LTE) approximation, we derive relatively low CO excitation temperatures ({approx}< 100 K) and optical depths ({tau} {approx}< 1). Performing a non-LTE excitation analysis using RADEX, we find that the CO lines measured by Z-Spec (from J = 4 {yields} 3 to 10 {yields} 9, depending on the galaxy) localize the best solutions to either a high-temperature/low-density region or a low/temperature/high-density region near the LTE solution, with the optical depth varying accordingly. Observations of additional CO lines, CO(1-0) in particular, are needed to constrain the non-LTE models.
The Modular Autonomous Research System (MARS) was developed to address the pressing need for faster, more reliable, and more adaptable scientific discovery. Traditional experimentation is limited by manual labor, long cycle times, and fragmented data streams, which constrain the ability to explore complex chemical and materials design spaces. To overcome these limitations, we created an integrated, modular platform that combines laboratory robotics, diverse measurement instruments, and a central data infrastructure with artificial intelligence–driven decision-making. The system links liquid handling robots, robotic arms, and optical plate readers into a closed loop where experiments are executed automatically, data is analyzed in real time, and subsequent experimental conditions are adaptively chosen to maximize information gain. Over the course of the project, MARS was validated on two primary test cases—spectroscopic metal–ligand binding assays and peptide-directed mineralization—which highlighted the system’s ability to handle uncertainty and variability in experimental measurements. To further demonstrate modularity and extensibility, we also established additional testbeds in electrochemistry for catalyst discovery and electrolyte formulation for advanced batteries. The results show that MARS can reliably conduct autonomous campaigns with minimal human intervention, adapt to distinct scientific domains, and provide a scalable model for future self-driving laboratories. This work establishes new capabilities for modular, uncertainty-aware automation and directly supports the need for advanced, data-driven research platforms capable of accelerating discovery across a wide range of scientific and national security missions.
Title: Idaho National Laboratory’s Mobile Hot Cell Transportation: Engineering Solutions for Global Disused Sealed Radioactive Sources. Abstract: The Mobile Hot Cell (MHC), currently under development by Idaho National Laboratory (INL) for the Off-Site Source Recovery Project (OSRP), is designed to help international partners meet the unique challenges of end-of-life radioactive material management. The MHC will provide a critical resource for countries that require assistance securing and disposing of Disused Sealed Radioactive Sources (DSRS) and orphaned sources in challenging environments, allowing these sources to be secured against misuse and nefarious activities. The MHC is a rapidly deployable system for conditioning and preparing end-of-life radioactive sources for transportation or storage. It is designed to handle sources of up to 1,000 Ci Co-60 equivalent while maintaining full radiological and biological containment. It will be deployable within 48 hours of an alert, making it ideal for emergency situations. The MHC features an operational suite for control, support racks for electronics, pneumatics, and welding systems, and a modular robust steel structure providing radiological shielding and internal robotic support. This design allows configurations for multiple device types to be conditioned and the ability to safely manage routine issues such as leaking or damaged sources. The MHC has been designed with the transportation challenges of rapid deployment to difficult environments in mind. The system weighs approximately 150,000 pounds, with individual systems breaking down into pieces not exceeding 20,000 pounds. Components are to be transportable on standard 20ft ISO containers, with shielding shells on 20ft flat racks. It is estimated that a total of eight containers and flat racks will be required. The use of 20ft containers, as opposed to 40ft containers, minimizes the impact on less developed road infrastructures, enabling the MHC to be positioned in constrained environments such as hospital parking lots. The system’s modularity also allows for deployment using smaller equipment, such as a 10-ton boom truck or forklift, which is crucial given the potential logistical challenges in different countries. This transportation strategy, evaluated in collaboration with Utah State University, ensures the MHC can be deployed via ground, rail, sea, or air, addressing the primary concern of international transport logistics.
This document describes Dawn use, scheduling, and governance concerns. Users started running full-machine science runs in early April 2009 during the initial open shakedown period. Scheduling Dawn while in the Open Computing Facility (OCF) was controlled and coordinated via phone calls, emails, and a small number of controlled banks. With Dawn moving to the Secure Computing Facility (SCF) in fall of 2009, a more detailed scheduling and governance model is required. The three major objectives are: (1) Ensure Dawn resources are allocated on a program priority-driven basis; (2) Utilize Dawn resources on the job mixes for which they were intended; and (3) Minimize idle cycles through use of partitions, banks and proper job mix. The SCF workload for Dawn will be inherently different than Purple or BG/L, and therefore needs a different approach. Dawn's primary function is to permit adequate access for tri-lab code development in preparation for Sequoia, and in particular for weapons multi-physics codes in support of UQ. A second purpose is to provide time allocations for large-scale science runs and for UQ suite calculations to advance SSP program priorities. This proposed governance model will be the basis for initial time allocation of Dawn computing resources for the science and UQ workloads that merit priority on this class of resource, either because they cannot be reasonably attempted on any other resources due to size of problem, or because of the unavailability of sizable allocations on other ASC capability or capacity platforms. This proposed model intends to make the most effective use of Dawn as possible, but without being overly constrained by more formal proposal processes such as those now used for Purple CCCs.
A current area of research interest in national security is to effectively and efficiently determine the contents of the many shipping containers that enter ports in the United States. This interest comes as a result of the 9/11 Commission Act passed by Congress in 2007 that requires 100% of inbound cargo to be scanned by 2012. It appears that this requirement will be achieved by 2012, but as of February of 2009 eighty percent of the 11.5 million inbound cargo containers were being scanned. The systems used today in all major U.S. ports to determine the presence of radioactive material within cargo containers are Radiation Portal Monitors (RPM). These devices generally exist in the form of a gate or series of gates that the containers can be driven through and scanned. The monitors are effective for determining the presence of radiation, but offer little more information about the particular source. This simple pass-fail system leads to many false alarms as many everyday items emit radiation including smoke detectors due to the Americium-241 source contained inside, bananas, milk, cocoa powder and lean beef due to the trace amounts of Potassium-40, and fire brick and kitty litter due to their high clay content which often contains traces of uranium and thorium. In addition, if an illuminating source is imposed on the boundary of the container, the contents of the container may become activated. These materials include steel, aluminum and many agricultural products. Current portal monitors also have not proven to be that effective at identifying natural or highly enriched uranium (HEU). In fact, the best available Advanced Spectroscopic Portal Monitors (ASP) are only capable of identifying bare HEU 70-88% of the time and masked HEU and depleted uranium (DU) only 53 percent of the time. Therefore, a better algorithm that uses more information collected from better detectors about the specific material distribution within the container is desired. The work reported here explores the inverse problem of optical tomography applied to heterogeneous domains. The neutral particle transport equation was used as the forward model for how neutral particles stream through and interact within these heterogeneous domains. A constrained optimization technique that uses Newtons method served as the basis of the inverse problem. Optical tomography aims at reconstructing the material properties using (a) illuminating sources and (b) detector readings. However, accurate simulations for radiation transport require that the particle (gamma and/or neutron) energy be appropriate discretize in the multigroup approximation. This, in turns, yields optical tomography problems where the number of unknowns grows (1) about quadratically with respect to the number of energy groups, G, (notably to reconstruct the scattering matrix) and (2) linearly with respect to the number of unknown material regions. As pointed out, a promising approach could rely on algorithms to appropriately select a material type per material zone rather than G2 values. This approach, though promising, still requires further investigation: (a) when switching from cross-section values unknowns to material type indices (discrete integer unknowns), integer programming techniques are needed since derivative information is no longer available; and (b) the issue of selecting the initial material zoning remains. The work reported here proposes an approach to solve the latter item, whereby a material zoning is proposed using one-group or few-groups transport approximations. The capabilities and limitations of the presented method were explored; they are briefly summarized next and later described in fuller details in the Appendices. The major factors that influenced the ability of the optimization method to reconstruct the cross sections of these domains included the locations of the sources used to illuminate the domains, the number of separate experiments used in the reconstruction, the locations where measurements were collected, the optical thickness of the domain, the amount of signal noise and signal bias applied to the measurements and the initial guess for the cross section distribution. All of these factors were explored for problems with and without scattering. Increasing the number of source and measurement locations and experiments generally was more successful at reconstructing optically thicker domains while producing less error in the image. The maximum optical thickness that could be reconstructed with this method was ten mean free paths for pure absorber and two mean free paths for scattering problems. Applying signal noise and signal bias to the measured fluxes produced more error in the produced image. Generally, Newtons method was more successful at reconstructing domains from an initial guess for the cross sections that was greater in magnitude than their true values than from an initial guess that was lower in magnitude.
With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output must be delicately managed, often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Because the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution network where the main goal is to keep the voltage magnitudes within their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.
With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output has to be delicately managed; often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Since the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution networks where main goal is to keep the voltage magnitudes with their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.
Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.
In the Northeastern United States, natural gas supply constraints have led to periods when gas shortages have caused up to a quarter of all unscheduled power plant outages. Dual fuel oil/gas generators or local gas storage might mitigate gas supply shortages. We use historical power plant operational and availability data to develop a supply curve of the costs required for generators to mitigate fuel shortage failures in New England. Based on 2012–2018 data, we find that the historical fuel shortages at approximately 2 GW worth of gas-fired capacity could be mitigated using on-site fuel storage. For comparison, New England’s average reserve margin was 1.7–2.8 GW over our sample period. Oil dual fuel plants would recoup their investment if compensated with a reliability adder of $\$ 3-7$/MWh during their normal operations, while $\$ 7-16$/MWh would incentivize using onsite, compressed natural gas storage. We estimate that the capital expenses associated with the fuel storage options would be less expensive than installing battery backup for resource adequacy at current battery prices.