Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The large ultraviolet optical infrared surveyor (LUVOIR) study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale within the context of NASA’s flagships cost and schedule performances to date. While NASA’s flagships perform exquisitely once on orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA’s future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship’s lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA’s current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity. This paper briefly comments on the motivations for NASA’s flagships and on the science motivations for a LUVOIR-like mission. We argue the incentives for improving NASA’s flagships development cost and schedule performance. We review the specific additional challenges of NASA’s flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagships and other large government projects lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA’s flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA’s future flagship’s cost and schedule performance.

Crooke, Julie A.↗

A Scheduling Algorithm Compatible with a Distributed Management of Arrivals in the National Airspace System

The current system used by the FAA to schedule arrivals is the Traffic Based Flow Manager (TBFM). It is a centralized system that gives an operator (airline) no influence over scheduled times of arrival assigned to its flights. Future systems for managing arrival scheduling are proposed as distributed systems. Such a system is called upon to give operators influence to schedule and negotiate resources for their flights, and to resolve other technical challenges, such as eliminating a single point of failure. A distributed system for managing diverse air traffic will need the capability of computing a schedule for the given arriving flights in a way that complies with the operational constraints. This paper contributes an algorithm that computes such a schedule. Although developed as part of an effort toward a distributed system, the algorithm itself is neither inherently distributed nor inherently centralized and can be used in either type of system.

Sadovsky, A.↗

Dynamic Scheduling: Target of Opportunity Observations of Gravitational Wave Events

The simultaneous detection of electromagnetic and gravitational waves from the coalescence of two neutron stars (GW170817 and GRB170817A) has ushered in a new era of ‘multimessenger’ astronomy, with electromagnetic detections spanning from gamma to radio. This great opportunity for new scientific investigations raises the issue of how the available multimessenger tools can best be integrated to constitute a powerful method to study the transient Universe in particular. To facilitate the classification of possible optical counterparts to gravitational wave events, it is important to optimize the scheduling of observations and the filtering of transients, both key elements of the follow-up process. In this work, we describe the existing workflow whereby telescope networks such as GRANDMA and GROWTH are currently scheduled; we then present modifications we have developed for the scheduling process specifically, so as to face the relevant challenges that have appeared during the latest observing run of Advanced LIGO and Advanced Virgo. We address issues with scheduling more than one epoch for multiple fields within a skymap, especially for large and disjointed localizations. This is done in two ways: by optimizing the maximum number of fields that can be scheduled and by splitting up the lobes within the skymap by right ascension to be scheduled individually. In addition, we implement the ability to take previously observed fields into consideration when rescheduling. We show the improvements that these modifications produce in making the search for optical counterparts more efficient, and we point to areas needing further improvement.

Gravitational waves↗

The First Year of KOKEE12M-WETTZ13S VGOS Intensive Scheduling: Status and Efforts Towards Improvement

The KOKEE12M-WETTZ13S (K2-Ws) Intensive series began on January 4, 2021. Evaluation of the first year of schedules has shown that the series is performing reasonably weel, but the schedules could be improved. For example, the number of scheduled observations in a typical 2021 K2-Ws session is approximately half that of the first few MACGO12M-WETTZ13S Intensive sessions, and scheduling fewer observations negatively impats UT1 results. Also, preliminary analysis of the scheduled and achieve SNRs of the K2-Ws observations and the SNRs' ratios shows examples where the achieved SNRs are either too high, indicating long observations that could have been replaced by a greater number of shorter observations, or too low, indicating a lack of robustness that could lead to observation loss. In this poster, we describe key aspects of how the K2-Ws Intensives have been scheduled in 2021. Then we discuss the areas of concern and the status of efforts to make improvements in these areas.

Karen Baver↗

Locality-Aware Scheduling for Scalable Heterogeneous Environments

Heterogeneous computing promise boost performance of scientific applications by allowing massively parallel execution of computational tasks. However, manually managing extremely heterogeneous, multi-device systems is complicated and may result in sub-optimal performance. Specifically, data management is an extremely challenging problem on multi-device systems. In this work, we introduce two locality-aware schedulers for the Minos Computing Library (MCL), an asynchronous, task-based programming model and runtime for extremely heterogeneous systems. The first scheduler implements a pure locality-aware algorithm to maximize data reuse, though it might incur in ”hot-spots” that limit system utilization. The second scheduler mitigates this drawback by dynamically targeting between locality-awareness and system utilization based on the current workload and available computing devices. Our results show that locality-awareness greatly benefit applications that exhibit data reuse, providing up to 6.9x and 7.9x over the original MCL scheduler and equivalent OpenCL implementations, respectively. Moreover, our schedulers introduce negligible overhead compared with the original MCL scheduler and achieve similar performance for applications that don’t benefit from data locality.

Architecture, co-design, Task-based programming mo↗

Compressing micro-operations in scheduler entries in a processor

An electronic device includes a processor having a micro-operation queue, multiple scheduler entries, and scheduler compression logic. When a pair of micro-operations in the micro-operation queue is compressible in accordance with one or more compressibility rules, the scheduler compression logic acquires the pair of micro-operations from the micro-operation queue and stores information from both micro-operations of the pair of micro-operations into different portions in a single scheduler entry. In this way, the scheduler compression logic compresses the pair of micro-operations into the single scheduler entry.

Boyer, Michael W.↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Three practical workflow schedulers for easy maximum parallelism

Runtime scheduling and workflow systems are an increasingly popular algorithmic component in HPC because they allow full system utilization with relaxed synchronization requirements. There are so many special-purpose tools for task scheduling, one might wonder why more are needed. Use cases seen on the Summit supercomputer needed better integration with MPI and greater flexibility in job launch configurations. Preparation, execution, and analysis of computational chemistry simulations at the scale of tens of thousands of processors revealed three distinct workflow patterns. A separate job scheduler was implemented for each one using extremely simple and robust designs: file-based, task-list based, and bulk-synchronous. Comparing to existing methods shows unique benefits of this work, including simplicity of design, suitability for HPC centers, short startup time, and well-understood per-task overhead. All three new tools have been shown to scale to full utilization of Summit, and have been made publicly available with tests and documentation. This work presents a complete characterization of the minimum effective task granularity for efficient scheduler usage scenarios. Here, these schedulers have the same bottlenecks, and hence similar task granularities as those reported for existing tools following comparable paradigms.

97 MATHEMATICS AND COMPUTING↗

A Bi-Level Formulation And Solution Method For The Integration Of Process Design And Scheduling

Design and operation decisions of manufacturing plants can often be expressed within a hierarchical structure, where optimal decisions at lower operating level provide constraints for the decision raking at a higher decision level. In this work, we are addressing the case of a hierarchical design and scheduling optimization problem. The integration of design and scheduling decisions can play a big role in designing economically profitable plants and improving their operational performance. This problem can be expressed as a bi-level problem, where design related decisions occur at the upper level and operational scheduling decisions at the lower level. Since discrete decisions are involved in both optimization levels, the resulting formulation typically corresponds to bi-level mixed-integer programming problems (B-MIP). The solution of B-MIP problems is very challenging, and typically requires the use of global optimization techniques, with many algorithms not able to guarantee feasibility. To overcome the challenges in solving this class of problems we propose the use of a multi-parametric based algorithm for the solution of bi-level mixed-integer linear and quadratic programming problems, capable of providing the exact and global solution. The main idea of this approach is to treat the lower scheduling problem as a multi-parametric programming problem in which the design decisions are considered as parameters. Here, the resulting parametric solutions can then be substituted into the upper level design problem, which can be solved as a set of single-level deterministic programming problems. Through the developed formulation and algorithm we are able to supply the decision makers with the exact solution of the integrated design and scheduling problem.

42 ENGINEERING↗

An efficient MILP framework for integrating nonlinear process dynamics and control in optimal production scheduling calculations

The emphasis currently placed on enterprise-wide decision making and optimization has led to an increased need for methods of integrating nonlinear process dynamics and control information in scheduling calculations. The inevitable high dimensionality and nonlinearity of first-principles dynamic process models makes incorporating them in scheduling calculations challenging. In this work, we describe a general framework for deriving data-driven surrogate models of the closed-loop process dynamics. Focusing on Hammerstein–Wiener and finite step response (FSR) model forms, we show that these models can be (exactly) linearized and embedded in production scheduling calculations. The resulting scheduling problems are mixed-integer linear programs with a special structure, which we exploit in a novel and efficient solution strategy. A polymerization reactor case study is utilized to demonstrate the merits of this method. Finally, our framework compares favorably to existing approaches that embed dynamics in scheduling calculations, showing considerable reductions in computational effort.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An exploration of online-simulation-driven portfolio scheduling in Workflow Management Systems

Workflow Management Systems used to automate the execution of scientific workflow applications on parallel and distributed computing platforms must make scheduling decisions at runtime. A large number of workflow scheduling algorithms have been proposed in the literature, but often these algorithms are evaluated based on simplifying assumptions that may not hold in practice. Furthermore, published algorithm evaluation and/or comparison results are necessarily only for a subset of all possible scenarios, and thus may not include scenarios relevant to particular use-cases. Consequently, it is difficult for Workflow Management Systems (WMSs) developers to decide which scheduling algorithm should be implemented. To obviate this difficulty, one possible approach is to implement a portfolio of scheduling algorithms and select the most effective algorithm at runtime. One method for performing this selection is to run an online simulation for each algorithm in the portfolio. The algorithm that leads to the best performance, in simulation, is selected for future use. The above simulation-driven portfolio scheduling (SDPS) approach has been proposed in a few parallel and distributed computing contexts. The main objective of this work is to evaluate the feasibility and potential merit of SDPS if implemented in WMSs. Here we perform this evaluation using simulated WMS executions, where the simulations are instantiated from real-world platform and workflow configurations. Our main finding is that SDPS is on par with or outperforms an approach in which a single algorithm is used, where this algorithm is the one that performs best on average across all our experimental scenarios. Furthermore, we find that SDPS remains an attractive proposition even in the presence of high levels of simulation error and for simulators with relatively low levels of sophistication. In many of our experimental scenarios we find that mitigating simulation error at runtime can further improve performance. Finally, we show that simulation overhead can be made sufficiently low for SDPS to be feasible in practice.

97 MATHEMATICS AND COMPUTING↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Hydropower Scheduling Toolchains: Comparing Experiences in Brazil, Norway, and USA and Implications for Synergistic Research

While hydropower scheduling is a well-defined problem, there are institutional differences that need to be identified to promote constructive and synergistic research. We study how established toolchains of computer models are organized to assist operational hydropower scheduling in Brazil, Norway, and the United States’ Colorado River System (CRS). These three systems have vast hydropower resources, with numerous, geographically widespread, and complex reservoir systems. Although the underlying objective of hydropower scheduling is essentially the same, the systems are operated in different market contexts and with different alternative uses of water, where the stakeholders’ objectives clearly differ. This in turn leads to different approaches when it comes to the scope, organization, and use of models for operational hydropower scheduling and the information flow between the models. Here, we describe these hydropower scheduling toolchains, identify the similarities and differences, and shed light on the original ideas that motivated their creation. We then discuss the need to improve and extend the current toolchains and the opportunities to synergistic research that embrace those contextual differences.

13 HYDRO ENERGY↗

Link Scheduling in Satellite Networks via Machine Learning Over Riemannian Manifolds

Low Earth Orbit (LEO) satellites play a crucial role in enhancing global connectivity, serving a complementary solution to existing terrestrial systems. In wireless networks, scheduling is a vital process that allocates time-frequency resources to users for interference management. However, LEO satellite networks face significant challenges in scheduling their links towards ground users due to the satellites’ mobility and overlapping coverage. This paper addresses the dynamic link scheduling problem in LEO satellite networks by considering spatio-temporal correlations introduced by the satellites’ movements. The first step in the proposed solution involves modeling the network over Riemannian manifolds, thanks to their representation as symmetric positive definite matrices. We introduce two machine learning (ML)-based link scheduling techniques that model the dynamic evolution of satellite positions and link conditions over time and space. To accurately predict satellite link states, we present a recurrent neural network (RNN) over Riemannian manifolds, which captures spatio-temporal characteristics over time. Furthermore, we introduce a separate model, the convolutional neural network (CNN) over Riemannian manifolds, which captures geometric relationships between satellites and users by extracting spatial features from the network topology across all links. Simulation results demonstrate that both RNN and CNN over Riemannian manifolds deliver comparable performance to the fractional programming-based link scheduling (FPLinQ) benchmark. Remarkably, unlike other ML-based models that require extensive training data, both models only need 30 training samples to achieve over 99% of the sum rate while maintaining similar computational complexity relative to the benchmark.

42 ENGINEERING↗

Approximate Scheduling of DERs with Discrete Complex Injections

Rapid penetration of renewable energy based Distributed Energy Resources (DER) has the potential to exacerbate the challenges inherent in grid frequency and voltage regulation. However, their real time controllability can be leveraged to not only mitigate such challenges, but improve the economics and quality of grid operations. A plethora of DER scheduling algorithms have been developed for fast and efficient scheduling of these resources. These algorithms schedule the complex - real and reactive power injected into (or drawn from) the grid by the DERs under various cost objective functions and grid constraints. However, a vast majority of such algorithms assume the feasible range of power injections to be continuous. In reality, the control options available for several DERs form a discrete space. This implies that the feasible range of power injections also forms a discrete space. This makes DER scheduling an NP-hard problem. Integer/Mixed Integer program based algorithms, which guarantee optimality in the objective value, have been developed. But these are prohibitively expensive in terms of computational time requirements. On the other hand, fast heuristic based solutions have also been developed. But as they do not provide any guarantee on the optimality of the objective, or on satisfying the constraints, they are unreliable for grid operations. Recent works have developed approximation algorithms which offer the best of both the approaches above: (near) optimality and low computational complexity, both of which are governed by a user defined accuracy parameter ϵ. In this work, we significantly improve upon such existing works by developing an approximation algorithm which schedules DERs with complex injections (as opposed to only real injection) and whose runtime is polynomial (as opposed to exponential) in 1/ϵ. We provide theoretical analysis and support them with experimental results to validate the guarantees provided by our approximation algorithm.

14 SOLAR ENERGY↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Objective Scheduling for the Cluster II Constellation

This paper describes the application of the MUSE multiobjecctive scheduling framework to the Cluster II WBD scheduling domain. Cluster II is an ESA four-spacecraft constellation designed to study the plasma environment of the Earth and it's magnetosphere. One of the instruments on each of the four spacecraft is the Wide Band Data (WBD) plasma wave experiment. We have applied the MUSE evolutionary algorithm to the scheduling problem represented by this instrument, and the result has been adopted and utilized by the WBD schedulers for nearly a year. This paper describes the WBD scheduling problem, its representation in MUSE, and some of the visualization elements that provide insight into objective value tradeoffs.

observatory scheduilng↗

Scheduler Design Criteria: Requirements and Considerations

This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

NASA-KAIA/KARI research collaboration↗