Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

A cell-centered AMR-ALE framework for 3D multi-material hydrodynamics. Part I: Lagrangian and indirect Euler AMR algorithms

Many applications of physics and engineering involve wide ranges of time and spatial scales. The numerical simulation of localized small scales such as shock waves and material interfaces requires a large number of computational cells in these regions. For these applications, Lagrangian and Arbitrary-Lagrangian-Eulerian (ALE) related methods are engaging since the moving mesh feature naturally brings mesh cells on shock discontinuities and material interfaces are carefully captured. In addition, Adaptive-Mesh-Refinement (AMR) strategies aim to optimize computational resources by concentrating finer mesh cells only in areas of interest while using coarser cells elsewhere. A key but challenging AMR requirement consists in efficiently distributing the computational effort to achieve high accuracy without the prohibitive computational costs associated with uniformly fine grids. Here, in this document, the coupling of the p4est AMR library with a cell-centered Lagrangian scheme is presented with the goal to perform reliable 3D Lagrangian-AMR and indirect Euler-AMR multi-material simulations. In particular, it is shown that starting from a 3D indirect ALE code, the memory management and load balancing requirements can be delegated to an external library (here the p4est library) to unlock ALE-AMR capabilities. First, we present a strategy to transcribe the octant-based connectivity of the 3D AMR framework with that of an unstructured mesh of polygonal cells used in Lagrangian hydrodynamics. Then, we show how refinement and coarsening operations must be adapted to the particular Lagrangian framework to ensure the conservation of volume during those steps. Finally, several numerical test cases are presented that demonstrate the capabilities of the Lagrangian-AMR and indirect Euler-AMR algorithms.

3D cell-centered Lagrangian numerical scheme↗

An optimization framework for workplace charging strategies

The workplace charging (WPC) has been recently recognized as the most important secondary charging point next to residential charging for plug-in electric vehicles (PEVs). The current WPC practice is spontaneous and grants every PEV a designated charger, which may not be practical or economic when there are a large number of PEVs present at workplace. This study is the first research undertaken that develops an optimization framework for WPC strategies to satisfy all charging demand while explicitly addressing different eligible levels of charging technology and employees’ demographic distributions. The optimization model is to minimize the lifetime cost of equipment, installations, and operations, and is formulated as an integer program. We demonstrate the applicability of the model using numerical examples based on national average data. The results indicate that the proposed optimization model can reduce the total cost of running a WPC system by up to 70% compared to the current practice. The WPC strategies are sensitive to the time windows and installation costs, and dominated by the PEV population size. The WPC has also been identified as an alternative sustainable transportation program to the public transit subsidy programs for both economic and environmental advantages.

Optimization↗

WIYN IMAGING OF THE GLOBULAR CLUSTER SYSTEMS OF THE SPIRAL GALAXIES NGC 891 AND NGC 4013

We present results from a WIYN 3.5 m telescope imaging study of the globular cluster (GC) systems of the edge-on spiral galaxies NGC 891 and NGC 4013. We used the 10' x 10' Minimosaic Imager to observe the galaxies in BVR filters to projected radii of {approx}20 kpc from the galaxy centers. We combined the WIYN data with archival and published data from the WFPC2 and AdvancedCameraforSurveys on the Hubble Space Telescope (HST) to assess the contamination level of the WIYN GC candidate sample and to follow the GC systems further in toward the galaxies' centers. We constructed radial distributions for the GC systems using both the WIYN and HST data. The GC systems of NGC 891 and NGC 4013 extend to 9 {+-} 3 kpc and 14 {+-} 5 kpc, respectively, before falling off to undetectable levels in our images. We use the radial distributions to calculate global values for the total number (N{sub GC}) and specific frequencies (S{sub N} and T) of GCs. NGC 4013 has N{sub GC} = 140 {+-} 20, S{sub N} = 1.0 {+-} 0.2, and T = 1.9 {+-} 0.5; our N{sub GC} value is {approx}40% smaller than a previous determination from the literature. The HST data were especially useful for NGC 891 because the GC system is concentrated toward the plane of the galaxy and was only weakly detected in our WIYN images. Although NGC 891 is thought to resemble the Milky Way in terms of its overall properties, it has only half as many GCs, with N{sub GC}= 70 {+-} 20, S{sub N} = 0.3 {+-} 0.1, and T = 0.6 {+-} 0.3. We also calculate the galaxy-mass-normalized number of blue (metal-poor) GCs in NGC 891 and NGC 4013 and find that they fall along a general trend of increasing specific frequency of blue GCs with increasing galaxy mass. Given currently available resources, the optimal method for studying the global properties of extragalactic GC systems is to combine HST data with wide-field, ground-based imaging with good resolution. The results here demonstrate the advantage gained by using both methods when possible.

79 ASTRONOMY AND ASTROPHYSICS↗

High availability through full redundancy of the CMS detector controls system

The CMS detector control system (DCS) is responsible for controlling and monitoring the detector status and for the operation of all CMS sub detectors and infrastructure. This is required to ensure safe and efficient data taking so that high quality physics data can be recorded. The current system architecture is composed of more than 100 servers in order to provide the required processing resources. An optimization of the system software and hardware architecture is under development to ensure redundancy of all the controlled subsystems and to reduce any downtime due to hardware or software failures. The new optimized structure is based mainly on powerful and highly reliable blade servers and makes use of a fully redundant approach, guaranteeing high availability and reliability. The analysis of the requirements, the challenges, the improvements and the optimized system architecture as well as its specific hardware and software solutions are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mixed-precision iterative refinement using tensor cores on GPUs to accelerate solution of linear systems

Double-precision floating-point arithmetic (FP64) has been the de facto standard for engineering and scientific simulations for several decades. Problem complexity and the sheer volume of data coming from various instruments and sensors motivate researchers to mix and match various approaches to optimize compute resources, including different levels of floating-point precision. In recent years, machine learning has motivated hardware support for half-precision floating-point arithmetic. A primary challenge in high-performance computing is to leverage reduced-precision and mixed-precision hardware. We show how the FP16/FP32 Tensor Cores on NVIDIA GPUs can be exploited to accelerate the solution of linear systems of equations Ax = b without sacrificing numerical stability. The techniques we employ include multiprecision LU factorization, the preconditioned generalized minimal residual algorithm (GMRES), and scaling and auto-adaptive rounding to avoid overflow. We also show how to efficiently handle systems with multiple right-hand sides. On the NVIDIA Quadro GV100 (Volta) GPU, we achieve a 4×-5× performance increase and 5× better energy efficiency versus the standard FP64 implementation while maintaining an FP64 level of numerical stability.

GMRES↗

Correlation analysis on real-time tab-delimited network monitoring data

End-End performance monitoring in the Internet, also called PingER is a part of SLAC National Accelerator Laboratory’s research project. It was created to answer the growing need to monitor network both to analyze current performance and to designate resources to optimize execution between research centers, and the universities and institutes co-operating on present and future operations. The monitoring support reflects the broad geographical area of the collaborations and requires a comprehensive number of research and financial channels. The data architecture retrieval and methodology of the interpretation have emerged over numerous years. Analyzing this data is the main challenge due to its high volume. Finally, by using correlation analysis, we can make crucial conclusions about how the network data affects the performance of the hosts and how it depends from countries to countries.

97 MATHEMATICS AND COMPUTING↗

Optimal Coordination of Distributed Energy Resources Using Deep Deterministic Policy Gradient

Recent studies showed that reinforcement learning (RL) is a promising approach for coordination and control of distributed energy resources (DER) under uncertainties. Many existing RL approaches, including Q-learning and approximate dynamic programming, are based on lookup table methods, which become inefficient when the problem size is large and infeasible when continuous states and actions are involved. In addition, when modeling battery energy storage system (BESS), the loss of life is not reasonably considered into the decision-making process. This paper proposes an innovative deep RL method for DER coordination considering BESS degradation. The proposed deep RL is designed based on an adaptive actor-critic architecture and employs an off-policy deterministic policy gradient method for determining the dispatch operation that minimizes the operation cost and BESS life loss. Case studies were performed to validate the proposed method and demonstrate the effects of incorporating degradation models into control design.

Das, Avijit↗

Agent-Centric Approach for Cybersecurity Decision-Support with Partial Observability

Generating automated cyber resilience policies for real-world settings is a challenging research problem that must account for uncertainties in system state over time and dynamics between attackers and defenders. In addition to understanding attacker and defender motives and tools, and identifying “relevant” system and attack data, it is also critical to develop rigorous mathematical formulations representing the defender’s decision-support problem under uncertainty. Game-theoretic approaches involving cyber resource allocation optimization with Markov decision processes (MDP) have been previously proposed in the literature. Moreover, advancements in reinforcement learning approaches have motivated the development of partially observable stochastic games (POSGs) in various multi-agent problem domains with partial information. Recent advances in cyber-system state space modeling have also generated interest in potential applicability of POSGs for cybersecurity. However, as is the case in strategic card games such as poker, research challenges using game-theoretic approaches for practical cyber defense applications include: 1) solving for equilibrium and designing efficient algorithms for large-scale, general problems; 2) establishing mathematical guarantees that equilibrium exists; 3) handling possible existence of multiple equilibria; and 4) exploitation of opponent weaknesses. Inspired by advances in solving strategic card games while acknowledging practical challenges associated with the use of game-theoretic approaches in cyber settings, this paper proposes an agent-centric approach for cybersecurity decision-support with partial system state observability.

Tipireddy, Ramakrishna↗

Distributed Optimal Dispatch of Distributed Energy Resources Over Lossy Communication Networks

In this paper, we consider the economic dispatch problem (EDP), where a cost function that is assumed to be strictly convex is assigned to each of distributed energy resources (DERs), over packet dropping networks. The goal of a standard EDP is to minimize the total generation cost while meeting total demand and satisfying individual generator output limit. We propose a distributed algorithm for solving the EDP over networks. The proposed algorithm is resilient against packet drops over communication links. Under the assumption that the underlying communication network is strongly connected with a positive probability and the packet drops are independent and identically distributed (i.i.d.), we show that the proposed algorithm is able to solve the EDP. Numerical simulation results are used to validate and illustrate the main results of the paper.

97 MATHEMATICS AND COMPUTING↗

A Non-Cooperative Game-Based Distributed Beam Scheduling Framework for 5G Millimeter-Wave Cellular Networks

Here, this paper studies the problem of distributed beam scheduling for 5G millimeter-Wave (mm-Wave) cellular networks where base stations (BSs) belonging to different operators share the same spectrum without centralized coordination among them. Our goal is to design efficient distributed scheduling algorithms to maximize the network utility, which is a function of the achieved throughput by the user equipment (UEs), subject to the average and instantaneous power consumption constraints of the BSs. We propose a Media Access Control (MAC) and a power allocation/adaptation mechanism utilizing the Lyapunov stochastic optimization framework and non-cooperative games. In particular, we first decompose the original utility maximization problem into two sub-optimization problems for each time frame, which are a convex optimization problem and a non-convex optimization problem, respectively. By formulating the distributed scheduling problem as a non-cooperative game where each BS is a player attempting to optimize its own utility, we provide a distributed solution to the non-convex sub-optimization problem via finding the Nash Equilibrium (NE) of the game whose weights are determined optimally by the Lyapunov optimization framework. Finally, we conduct simulation under various network settings to show the effectiveness of the proposed game-based beam scheduling algorithm in comparison to that of several reference schemes.

42 ENGINEERING↗

Fault-Tolerant Decentralized Control for Large-Scale Inverter-Based Resources for Active Power Tracking

Integration of inverter-based resources (IBRs) which lack the intrinsic characteristics such as the inertial response of the traditional synchronous-generator (SG)-based sources presents a new challenge in the form of analyzing the grid stability under their presence. While the dynamic composition of IBRs differs from that of the SGs, the control objective remains similar in terms of tracking the desired active power. This letter presents a decentralized primal-dual-based fault-tolerant control framework for the power allocation in IBRs. Overall, a hierarchical control algorithm is developed with a lower level addressing the current control and the parameter estimation for the IBRs and the higher level acting as the reference power generator to the low level based on the desired active power profile. The decentralized network-based algorithm adaptively splits the desired power between the IBRs taking into consideration the health of the IBRs transmission lines. The proposed framework is tested through a simulation on the network of IBRs and the high-level controller performance is compared against the existing framework in the literature. The proposed algorithm shows significant performance improvement in the magnitude of power deviation and settling time to the nominal value under faulty conditions as compared to the algorithm in the literature.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

Utah FORGE 5-2428: Fracture Permeability Impact on Reservoir Stress and Seismic Slip Behavior - Workshop Presentation

This is a presentation on the Fracture Permeability Impact on Seismic Slip Behavior project by Lawrence Livermore National Laboratory, presented by Dr. Kayla A. Kroll. The project's objective is to develop, apply and validate a holistic thermal, hydrologic, mechanical, and chemical (THMC) workflow that includes evaluation of induced seismic slip in EGS reservoirs. This presentation was featured in the Utah FORGE R&D Annual Workshop on September 8, 2023. The workshop provided a valuable opportunity to explore the progress made in each of the 17 Research and Development projects funded under Solicitation 2020-1 which aim to enhance our understanding of the crucial factors influencing the development of Enhanced Geothermal Systems (EGS) reservoirs and resources.

15 GEOTHERMAL ENERGY↗

Application of Sequential Design of Experiments (SDoE) to Large Pilot-Scale Solvent-Based CO2 Capture Process at Technology Centre Mongstad (TCM)

The United States Department of Energy’s Carbon Capture Simulation for Industry Impact (CCSI2) program has developed a framework for sequential design of experiments (SDoE) that aims to maximize knowledge gained from budget- and schedule-limited pilot scale testing. SDoE was applied to the planning and execution of campaigns for testing CO2 capture systems at pilot-scale in order to optimally allocate resources available for the testing. In this methodology, a stochastic process model is developed by quantifying the parametric uncertainty in submodels of interest; for a solvent-based CO2 capture system, these may include physical properties and equipment performance submodels (e.g., mass transfer, interfacial area). This uncertainty is propagated through the full process model, over variable operating conditions, for estimating the resulting uncertainty in key model outputs (e.g., percentage of CO2 capture, solvent regeneration energy requirement). In developing a data collection plan, the predicted output uncertainty is incorporated into an algorithm that seeks simultaneously to select process operating conditions for which the predicted uncertainty is relatively high and to ensure that the entire space of operation is well represented. This test plan is then used to guide operation of the pilot plant at varying steady-state conditions, with resulting process data incorporated into the existing model using Bayesian inference to refine parameter distributions. The updated stochastic model, with reduced parametric uncertainty from data collected, is then used to guide additional data collection, thus the sequential nature of the experimental design. The SDoE process was implemented at the pilot test unit (12 MWe in scale) at Norway’s Technology Centre Mongstad (TCM) in a summer 2018 test campaign with aqueous monoethanolamine (MEA). During the test campaign, the varied operating conditions included the flowrates of circulated solvent, flue gas, and reboiler steam and the CO2 concentration in the flue gas. The process data were used to update probability distributions of mass transfer and interfacial area parameters of a stochastic process model developed by the CCSI2 team. Two iterations of the SDoE process were executed, resulting in the uncertainty in model predicted CO2 capture percentage decreasing by an average of 58.0 ± 4.7% over the full input space of interest. This work demonstrates the potential of the SDoE process for model refinement through reduction in process model parametric uncertainty, and ultimately risk in scale-up, in CO2 capture technology performance.

carbon capture↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Interactive Efficient Buildings Technical Report Series: Overview of Research Challenges and Gaps

These reports evaluate state-of-the-art and emerging building technologies that have significant potential to provide grid services. The reports also identify major research challenges and gaps facing the technologies as well as opportunities for technology-specific R&D. The GEB Technical Report Series will help inform and guide BTO's portfolio and serve as a foundational resource for the larger building research community. On-site behind-the-meter generation, battery storage, and electric vehicles are also an important part of the distributed energy resource (DER) optimization strategy for buildings. In general, the component technology reports do not focus on distributed generation or battery storage, but the Whole-Building Controls, Sensors, Modeling, and Analytics report discusses how a building can optimize across all DERs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A National Roadmap for Grid-Interactive Efficient Buildings

The way electricity is generated and consumed in the US is quickly changing, including in terms of the rapid growth in variable power generation resources and the need for large-scale investments to replace aging infrastructure and modernize the grid. Buildings that coordinate electricity use with grid conditions are a flexible and cost-effective resource to address the evolving power system challenges. Outfitted with smart technologies, GEBs are energy-efficient buildings with smart technologies characterized by the active use of distributed energy resources to optimize energy use for grid services, occupant needs and preferences, and cost reductions in a continuous and integrated way. In doing so, GEBs can play a key role in promoting greater affordability, resilience, environmental performance, and reliability. The report finds that, over the next two decades, GEBs could deliver between $100 and $200 billion in savings to the US power system and cut CO 2 emissions by 80 million tons per year by 2030, or 6% of total power sector CO 2 emissions. The report also provides 14 recommendations for addressing the top barriers to overcome barriers to GEB adoption and deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗