Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Demonstration of Defense Waste Processing Facility (DWPF) Higher Fissile Content Glass

The Accelerated Basin De-inventory (ABD) Program has been proposed as an alternative for future spent nuclear fuel (SNF) and nuclear material processing at the Savannah River Site (SRS). This approach would change the baseline H-Canyon (HCAN), Concentrate, Storage, and Transfer Facility (CSTF), and Defense Waste Processing Facility (DWPF) operations. The ABD Program would require that all domestic and foreign research reactor SNF currently at SRS be dissolved, stored, and then transferred to CSTF without the recovery of uranium. Preliminary assessments in the ABD Program plan have shown that ~5000 extra SRS high-level waste (HLW) canisters would be produced if the fissile mass loading remains at the current 897 g/m 3 limit; however, increasing the limit to 2500 g/m 3 would result in ~520 extra canisters. Thus, the ABD Program plan requires an increase of the DWPF fissile mass loading limit to 2500 g/m 3 to minimize canister production. DWPF considers the following isotopes in the calculation of fissile mass loading: U-233, U-235, Pu-239 and Pu-241.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of NASA's Planned Mars Program

The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX) designated Mars as one of four scientific targets for emphasis in future studies. It was against this background that the Space Studies Board charged COMPLEX to review whether the Mars Pathfinder and Surveyor programs, as presently conceived, satisfy the highest priorities for understanding Mars as provided in its report, An Integrated Strategy for the Planetary Sciences: 1995-2010. The present document is COMPLEX's assessment of the scientific potential of NASA's new approach to Mars exploration. This assessment considers how well the scientific objectives of the Mars Surveyor program match those of the Integrated Strategy; it also addresses some advantages and disadvantages of the smaller-faster-cheaper approach to the exploration of Mars. The capabilities of the various instruments are not discussed in detail since the Mars Observer instruments, all of which are scheduled for reflight, have already been assessed by COMPLEX2 and later instruments are, in general, not yet well defined.

Source record↗

An Overview of the NASA Aeronautics Test Program Strategic Plan

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

Marshall, Timothy J.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

Hazelrigg, G. A., Jr.↗

Explore Earth Commercial Smallsat Data Acquisition (CSDA) Program

The European Space Agency (ESA), our international partner in the ESA-NASA Earth Science & Observation Joint Program Planning Group (JPPG), is hosting the VH-RODA (Very High-resolution Radar and Optical Data Assessment Workshop) at ESA/ European Space Research Institute (ERSIN) in Frascati, Italy from November 7-10, 2022. The objective of the VH-RODA workshop is to provide an open forum (for the new space, commercial and institutional space sectors) for presenting and discussing about the current status and future developments related to Earth Observation (EO) data quality, calibration and validation of space-borne very high-resolution Synthetic Aperture Radar (SAR) and Optical sensors and data products, with a dedicated focus on commercial EO data providers and related Calibration/Validation activities, synergies between optical and SAR communities, presentation of standards and best practices for data quality. Additionally, the ESA-NASA Joint Program Planning Group (JPPG) Third Party Mission component will meet to further develop non-binding practices on evaluation, identify common guard rails for comparison of data, and coordinate future schedules to leverage shared knowledge. I serve as the Project Manager for the NASA’s Commercial Smallsat Data Acquisition (CSDA) Program and will participate in the VHRODA workshop on behalf of the program.

Commercial Remote Sensing↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 1: Executive summary

The feasibility of replacing the Space Transportation System (STS) Solid Rocket Boosters (SRBs) with Liquid Rocket Boosters (LRBs) was studied. Feasibility required acceptable technical risk, program costs, and a program plan which supports STS requirements. Three major goals were identified to direct booster design and operation: increased STS safety and reliability; STS/LRB integration with minimum impact; and increased STS performance. Two booster engine designs were studied. The first engine design was a turbopump-fed engine with state-of-the-art design, and the second was a pressure-fed engine which might provide a lower cost alternative to the pump-fed concept. Both booster concepts were carried through to completion of conceptual design and all system impacts and program costs were identified. Applications for LRB use in the Advanced Launch System (ALS) program were studied using the pump-fed LRB baseline concept and variations on the baseline concept. Support for the Pressure-Fed Booster Test Bed (PFBTB) included test program planning and costs and technical support.

Source record↗

Herbaceous Feedstock 2020 (State of Technology Report)

The Energy Independence and Security Act (EISA) of 2007 required a minimum supply of 36 million gallons of renewable fuels per year by 2022. In order to achieve these goals, the Bioenergy Technologies Office (BETO) has set cost and technology targets for producing advanced and cellulosic biofuels. One of the targets is to validate feedstock supply infrastructures and systems with 90% overall operating effectiveness and field-to-reactor throat delivered cost less than $85.51/dry ton (2016). As stated by the 2017 Multi-Year Program Plan (DOE 2017), the research and development focus of the Feedstock Technologies (FT) platform is reducing the cost, improving the supply chain logistic efficiency, improving biomass quality, and increasing the supply volume. In addition, BETO oversees annual State of Technology (SOT) report that assesses current technologies that are relevant to BETO’s targets based on actual data and experimental results. Feedstocks are essential to achieving BETO goals because the cost, quality, and quantity of feedstock available and accessible at any given time limit the maximum volume of biofuels that can be produced. In accordance with the 2016 Multi-Year Program Plan (DOE 2016a), FT focuses on (1) reducing the delivered cost of sustainably produced biomass, (2) preserving and improving the physical and chemical quality parameters of harvested biomass to meet the individual needs of biorefineries and other biomass users, and (3) expanding the quantity of feedstock materials accessible to the bioenergy industry. This is done by identifying, developing, demonstrating, and validating efficient and economical integrated systems for harvest and collection, storage, handling, transport, and preprocessing raw biomass from a variety of crops to reliably deliver the required supplies of high-quality, affordable feedstocks to biorefineries as the industry expands. The elements of cost, quality, and quantity are key considerations when developing advanced feedstock supply concepts and systems (DOE 2016a).

09 BIOMASS FUELS↗

NASA's future plans and programs

NASA future space programs, discussing space shuttle and station, nuclear propulsion, manned Mars landing, unmanned Venus-Mercury probes, etc

Paine, T. O.↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Biomedical programs operations plans

Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

Walbrecher, H. F.↗