Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

THE CARNEGIE HUBBLE PROGRAM

We present an overview of and preliminary results from an ongoing comprehensive program that has a goal of determining the Hubble constant to a systematic accuracy of {+-}2%. As part of this program, we are currently obtaining 3.6 {mu}m data using the Infrared Array Camera on Spitzer, and the program is designed to include James Webb Space Telescope in the future. We demonstrate that the mid-infrared period-luminosity relation for Cepheids at 3.6 {mu}m is the most accurate means of measuring Cepheid distances to date. At 3.6 {mu}m, it is possible to minimize the known remaining systematic uncertainties in the Cepheid extragalactic distance scale. We discuss the advantages of 3.6 {mu}m observations in minimizing systematic effects in the Cepheid calibration of H{sub 0} including the absolute zero point, extinction corrections, and the effects of metallicity on the colors and magnitudes of Cepheids. We undertake three independent tests of the sensitivity of the mid-IR Cepheid Leavitt Law to metallicity, which when combined will allow a robust constraint on the effect. Finally, we provide a new mid-IR Tully-Fisher relation for spiral galaxies.

79 ASTRONOMY AND ASTROPHYSICS↗

LDRD 2009 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2009, as required. In FY2009, the BNL LDRD Program funded 57 projects, 6 of which were new starts, at a total cost of $\$$11,671,567. Approximately 25% of the total funds was invested in a focused FY2009 LDRD call for proposals, and the remaining ~75% was awarded to openly competed LDRD projects. The investments that BNL makes in its LDRD program largely support the Laboratory’s strategic goals as outlined in the BNL Laboratory Plan. BNL has five Laboratory Initiatives, Photon Sciences, QCD Matter, Energy, Physics of the Universe, and Bio/Climate and Environmental Sciences. These major initiatives support the growth and evolution of the major business lines (i.e. mission areas) of the Laboratory. In addition, there are three smaller initiatives that support growth and program development in targeted areas, i.e. Biological Imaging, Computation, and Detectors for National Security. Approximately 88% of BNL LDRD funds supported one of the major or targeted initiatives. Of this, about 58% supported the five major initiatives and about 30% supported the smaller initiatives. About 12% was invested in other innovative research and development activities. In total, these LDRD investments supported 105 postdoctoral researchers and graduates students in whole or in part. In FY2009, new LDRD investments (5 of the 6 new projects started) largely supported the BNL initiative in Energy; $\$$3.465M supported projects started in FY2009, of which $\$$2.974M funded the focused call for proposals in Energy R&D.

99 GENERAL AND MISCELLANEOUS↗

LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program Assessment for FY 2013

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report fulfills that requirement.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program Assessment for FY 2012

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report fulfills that requirement.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program Assessment for FY 2014

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report fulfills that requirement.

99 GENERAL AND MISCELLANEOUS↗

LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.

99 GENERAL AND MISCELLANEOUS↗

LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.

99 GENERAL AND MISCELLANEOUS↗

LDRD 2016 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2C dated October 22, 2015. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2016, as required. In FY 2016, the BNL LDRD Program funded 48 projects, 21 of which were new starts, at a total cost of $11.5M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified four Critical Outcomes that define the Laboratory’s scientific future and that will enable it to realize its overall vision. Two operational Critical Outcomes address essential operational support for that future: renewal of the BNL campus; and safe, efficient laboratory operations.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program Assessment (FY 2015)

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B, and this report fulfills that requirement. DOE Order 413.2C was issued in October, 2016.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program Assessment for FY 2016

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2C, and this report fulfills that requirement.

99 GENERAL AND MISCELLANEOUS↗

2018 Annual Report Laboratory Directed Research and Development Program Activities Report

Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2C Chg1 (MinChg). This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2018, as required. In FY 2018, the BNL LDRD Program funded 57 projects, 27 of which were new starts, at a total cost of $11.2M.

99 GENERAL AND MISCELLANEOUS↗

Coupled-cluster techniques for computational chemistry: The CFOUR program package

An up-to-date overview of the CFOUR program system is given. After providing a brief outline of the evolution of the program since its inception in 1989, a comprehensive presentation is given of its well-known capabilities for high-level coupled-cluster theory and its application to molecular properties. Subsequent to this generally well-known background information, much of the remaining content focuses on lesser-known capabilities of CFOUR, most of which have become available to the public only recently or will become available in the near future. Each of these new features is illustrated by a representative example, with additional discussion targeted to educating users as to classes of applications that are now enabled by these capabilities. Lastly, some speculation about future directions is given, and the mode of distribution and support for CFOUR are outlined in the appendix.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SoLID Program at JLab

An overview of the Solenoidal Large Intensity Device (SoLID) and its scientific program will be given in this talk. SoLID is a spectrometer/detector system proposed to exploit the full potential of the Jefferson Lab (JLab) 12 GeV energy upgrade. SoLID will push the limit of luminosity frontier in hadronic physics with its unique capability to handle very high rates with large acceptance under high luminosity (1037-39/cm2/s). A rich and vibrant scientific program has been developed for SoLID, including but not limited to the precision study of the 3d nucleon structure in both momentum space using Semi-Inclusive Deep Inelastic Scattering (SIDIS) and coordinate space using Deep Virtual Exclusive Reactions (DVER), probing physics beyond the Standard Model with Parity Violating Deep Inelastic Scattering (PVDIS), and investigating the gluonic field contribution to the proton structure and proton mass via J/¿ threshold production. The SoLID collaboration has developed a robust, low risk and flexible conceptual design, with a base line design capable of accomplishing its scientific goals and flexibility to adopt the cutting-edge technology. Detector subsystems have been tested with prototypes in realistic high luminosity conditions and are demonstrated to function well under extremely challenging environment to satisfy the requirements of planned experiments.

Chen, Jian-Ping [Thomas Jefferson National Acceler↗

Wireless Power Transfer Public Slide Set

General slide set that describes wireless (inductive) power transfer, program design parameters, charging system, and safety guidelines. General overview of the program and the wireless power transfer technology being developed at USURF.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fermilab Neutrino Program – Accelerators & Experiments

We provide an overview of the Fermilab neutrino program, including details for both the accelerator and experiment aspect of the program. On the accelerator side, the current operation of the proton complex is presented, alongside the status of the upcoming PIP-II upgrade and the newly proposed ACE-MIRT upgrade. On the detector side, the SBN and NOVA programs are presented, as well as the status of the upcoming DUNE/LBNF upgrade. The Fermilab neutrino program planning is contextualized in terms of the recent P5 report, as well as ongoing discussions on future flavor and collider programs.

43 PARTICLE ACCELERATORS↗