Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program ordering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Galileo Li/SO sub 2 battery modules program update

In order to meet the power needs of NASA's Galileo Probe, the Li/SO2 high rate D cells used in the battery modules have undergone some design changes, as upgrading of hardware quality requirements, and significant testing. A description of the design changes and the cell test data that are of a general nature is presented here. This data includes capacities, open circuit voltages, and internal resistance comparisons. A significant data base was built up over the years and continues to grow.

Smith, R. A.↗

Automatic blocking of nested loops

Blocked algorithms have much better properties of data locality and therefore can be much more efficient than ordinary algorithms when a memory hierarchy is involved. On the other hand, they are very difficult to write and to tune for particular machines. The reorganization is considered of nested loops through the use of known program transformations in order to create blocked algorithms automatically. The program transformations used are strip mining, loop interchange, and a variant of loop skewing in which invertible linear transformations (with integer coordinates) of the loop indices are allowed. Some problems are solved concerning the optimal application of these transformations. It is shown, in a very general setting, how to choose a nearly optimal set of transformed indices. It is then shown, in one particular but rather frequently occurring situation, how to choose an optimal set of block sizes.

Schreiber, Robert↗

Space Shuttle Ascent Flight Design Process: Evolution and Lessons Learned

The Space Shuttle Ascent Flight Design team is responsible for defining a launch to orbit trajectory profile that satisfies all programmatic mission objectives and defines the ground and onboard reconfiguration requirements for this high-speed and demanding flight phase. This design, verification and reconfiguration process ensures that all applicable mission scenarios are enveloped within integrated vehicle and spacecraft certification constraints and criteria, and includes the design of the nominal ascent profile and trajectory profiles for both uphill and ground-to-ground aborts. The team also develops a wide array of associated training, avionics flight software verification, onboard crew and operations facility products. These key ground and onboard products provide the ultimate users and operators the necessary insight and situational awareness for trajectory dynamics, performance and event sequences, abort mode boundaries and moding, flight performance and impact predictions for launch vehicle stages for use in range safety, and flight software performance. These products also provide the necessary insight to or reconfiguration of communications and tracking systems, launch collision avoidance requirements, and day of launch crew targeting and onboard guidance, navigation and flight control updates that incorporate the final vehicle configuration and environment conditions for the mission. Over the course of the Space Shuttle Program, ascent trajectory design and mission planning has evolved in order to improve program flexibility and reduce cost, while maintaining outstanding data quality. Along the way, the team has implemented innovative solutions and technologies in order to overcome significant challenges. A number of these solutions may have applicability to future human spaceflight programs.

Picka, Bret A.↗

Safety, reliability, maintainability and quality provisions for the Space Shuttle program

This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

M S Malkin↗

Interactive Graphics Analysis for Aircraft Design

Program uses higher-order far field drag minimization. Computer program WDES WDEM preliminary aerodynamic design tool for one or two interacting, subsonic lifting surfaces. Subcritical wing design code employs higher-order far-field drag minimization technique. Linearized aerodynamic theory used. Program written in FORTRAN IV.

Townsend, J. C.↗

Annual Site Environmental Report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii (Calendar Year 2007)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA), through the Sandia Site Offi ce (SSO), in Albuquerque, NM, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Washington Group International subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2007. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Site Offi ce (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting Manual (DOE 2007).

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report Sandia National Laboratories, Albuquerque, New Mexico, Calendar Year 2007

Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned/contractor-operated facility. Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates the laboratory for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA Sandia Site Office (SSO) administers the contract and oversees contractor operations at the site. This annual report summarizes data and the compliance status of Sandia Corporation’s environmental protection and monitoring programs through December 31, 2007. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention (P2), environmental restoration (ER), oil and chemical spill prevention, and implementation of the National Environmental Policy Act (NEPA). Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting (DOE 2007).

54 ENVIRONMENTAL SCIENCES↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Precision direct photon spectra at high energy and comparison to the 8 TeV ATLAS data

The direct photon spectrum is computed to the highest currently available precision and compared to ATLAS data from 8 TeV collisions at the LHC. The prediction includes threshold resummation at next-to-next-to-next-to-leading logarithmic order through the program PeTeR, matched to next-to-leading fixed order with fragmentation effects using JetPhox and includes the resummation of leading-logarithmic electroweak Sudakov effects. Remarkably, improved agreement with data can be seen when each component of the calculation is added successively. This comparison demonstrates the importance of both threshold logs and electroweak Sudakov effects. Numerical values for the predictions are included.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Thoughts on polarimetry for {sup 3}He beams at RHIC

The Relativistic Heavy Ions Collider (RHIC) has accelerated polarized proton beams for physics since 2001. As part of the future eRHIC program and in order to enhance access to the down quark, a program to accelerate polarized {sup 3}He in the AGS and RHIC is envisioned. To that end, a polarized {sup 3}He source is being built at MIT. This will be installed on the BNL EBIS source in preparation for injection into the booster and AGS. As an early exercise, in June 2012, unpolarized {sup 3}He beams have been accelerated in the AGS. This paper will peruse some potential ideas for {sup 3}He polarimetry and calibration that could be utilized at the AGS as well as RHIC. The current proton polarimetry program serves as a guide.

43 PARTICLE ACCELERATORS↗

Programming language for computations in the Interkosmos program

The programming system for Intercosmos data processing, based on the structural programming theory, which considers a program as an ordered set of standardized elementary parts, from which the user programs are automatically generated, is described. The programs are comprised of several modules, which are briefly summarized. The general structure of the programming system is presented in a block diagram. A programming control language developed to formulate the problem quickly and completely is presented along with basic symbols which are characteristic of the Intercosmos programming system.

Schmidt, K.↗

A Dynamic Failure Model for Predicting the Impact that a Program Location has on the Program

This paper presents a dynamic technique for predicting the effect that a "location" of a program will have on the program's computational behavior. The technique is based on the three necessary and sufficient conditions for software failure to occur: (1) a fault must be executed, (2) the fault must adversely affect the data state, and (3) the adverse effect in a data state must affect program output. In order to predict the effect that a location of a program will have on the program's computational behavior, the following characteristics of each program location are estimated: (1) the probability that a location of the program is executed, (2) the probability that a location of the program noticeably affects the program state created by the location, and (3) the probability that the data states created by a location affect the program's output. With estimates of these characteristics for each location in a program, we can predict those locations where a fault can more easily remain undetected during testing, as well as predict the degree of testing necessary to be convinced that a fault is not remaining undetected in a particular location.

Voas, Jeffrey↗

Weatherization Assistance Program - Background Data and Statistics

This technical memorandum is intended to provide readers with information that may be useful in understanding the purposes, performance, and outcomes of the Department of Energy's (DOE's) Weatherization Assistance Program (Weatherization). Weatherization has been in operation for over thirty years and is the nation's largest single residential energy efficiency program. Its primary purpose, established by law, is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential energy expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, the handicapped, and children.' The American Reinvestment and Recovery Act PL111-5 (ARRA), passed and signed into law in February 2009, committed $5 Billion over two years to an expanded Weatherization Assistance Program. This has created substantial interest in the program, the population it serves, the energy and cost savings it produces, and its cost-effectiveness. This memorandum is intended to address the need for this kind of information. Statistically valid answers to many of the questions surrounding Weatherization and its performance require comprehensive evaluation of the program. DOE is undertaking precisely this kind of independent evaluation in order to ascertain program effectiveness and to improve its performance. Results of this evaluation effort will begin to emerge in late 2010 and 2011, but they require substantial time and effort. In the meantime, the data and statistics in this memorandum can provide reasonable and transparent estimates of key program characteristics. The memorandum is laid out in three sections. The first deals with some key characteristics describing low-income energy consumption and expenditures. The second section provides estimates of energy savings and energy bill reductions that the program can reasonably be presumed to be producing. The third section deals with estimates of program cost-effectiveness and societal impacts such as carbon reduction and reduced national energy consumption. Each of the sections is brief, containing statistics, explanatory graphics and tables as appropriate, and short explanations of the statistics in order to place them in context for the reader. The companion appendices at the back of the memorandum explain the methods and sources used in developing the statistics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interactive software for spectral assignment

A new interactive computer software package for eigenvalue/eigenvector assignment using constant state feedback is described. The package consists of ten subprograms, each associated with a specific design objective, accessible from a main control program. Using this package, primary design objectives of assigning eigenvalues and approximating eigenvectors are first achieved. Then secondary design objectives, including modification of specific eigenvector components, reduction in specified elements of the feedback gain matrix, and reduction in eigensystem sensitivity to changes in plant parameters, are addressed. These secondary objectives are achieved by a systematic modification of the assigned eigenvectors in a small region about the initial assignment. In addition, the program implements the use of spectral assignment procedures with reduced-order system models. Program modes are described and illustrated by numerical examples.

Mielke, R. R.↗

Technology Maturation in Support of DOE 413.3B Project Execution - 16436

The DOE Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' provides program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements. Execution of complex DOE 413.3B projects depends, in part, upon the successful integration of a technology maturation program. The Low Activity Waste Pre-Treatment System (LAWPS) is executing a detailed technology maturation program under the Technology Readiness Level/Technology Maturation Plan (TRL/TMP) guidance of DOE Order 413.3B. The interaction of the technology maturation process and the project execution including technical, programmatic, and contractual execution, has been a critical component for project success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BuildingSync® [SWR-18-28]

BuildingSync® is a standardized language for commercial building energy audit data that software developers can use to exchange data between audit tools. Taking the form of an XML schema, BuildingSync can be required by building owners and audit program managers to allow data analysis and aggregation across multiple buildings in order to evaluate program performance and analyze trends. BuildingSync was developed using the standard energy data terminology defined in the Building Energy Data Exchange Specification (BEDES). BuildingSync is one of the first implementations of BEDES Version 1.0, and it was developed in close collaboration with the BEDES working groups. BuildingSync standardizes the format of the energy audit data itself. It is not intended to standardize the calculations performed on these data by engineers, analysts, software packages, or other audit tools. For more, see: https://buildingsync.net/

Long, Nicholas↗

SOFIP: A Short Orbital Flux Integration Program

A computer code was developed to evaluate the space radiation environment encountered by geocentric satellites. The Short Orbital Flux Integration Program (SOFIP) is a compact routine of modular compositions, designed mostly with structured programming techniques in order to provide core and time economy and ease of use. The program in its simplest form produces for a given input trajectory a composite integral orbital spectrum of either protons or electrons. Additional features are available separately or in combination with the inclusion of the corresponding (optional) modules. The code is described in detail, and the function and usage of the various modules are explained. A program listing and sample outputs are attached.

Stassinopoulos, E. G.↗