Nuclear Energy Fuel Cycle Program Knowledge Management Project.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).
US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)
Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) provides Federal agencies with information, guidance, and assistance in using renewable energy.
Alarm management in the process industries has been an increasing area of activity since the first publications of EEMUA 191 in 1999 and ISA18.2 in 2008. Most major oil and chemical companies have adopted some or all of the metrics for alarm management presented in these documents. However, simply targeting for these metrics might not be the best course of action for a company. Many of the metrics involve assumptions or logic not explicitly stated in the guidelines, assumptions that might not be valid for a given console or plant. In other cases, metrics are the result of implied, rather than explicit, relationships between alarm guidelines. Again, the implied connection might not be true under certain circumstances. Understanding these unstated underpinnings of alarm management can facilitate the implementation of a useful and efficient alarm management program. This paper explores some of the key unstated assumptions in alarm management and how changes in those assumptions can alter both the interpretation of alarm metrics as well as what metrics are utilized. (authors)
The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of Energy Management Information Systems (EMIS) at federal facilities, as detailed in the EMIS Technical Resources Report. A series of best practices documents was created by FEMP to help accelerate the market adoption and use of EMIS in the federal sector. This document highlights best practices for supporting EMIS use at federal facilities.
The step-by-step framework and best practices in the Energy Data Management Guide provide guidance on how to establish a robust and sustainable energy data management program.
Code of Federal Regulation (CFR) 10 CFR 830, Nuclear Safety Management [1], explicitly identifies hazardous materials in addition to radioactive materials when establishing the scope of materials that must be evaluated in Hazard Category (HC) 1, 2, and 3 nuclear facilities. This inclusion has led to a near decade-long progression of more and more rigorous application of chemical hazard controls in these facilities. The progressive addition of more rigorous chemical hazard controls has occurred across the Department of Energy (DOE) Complex, having been driven by contractors and regulators alike. However, chemical hazards in other DOE facilities have been, and continue to be, controlled using traditional industrial safety centered strategies. Thus, identical chemical hazards are controlled using dramatically different approaches based solely on the facility type. Not only are the controls different, the analysis and derivation rigor and requirements are also significantly different. In particular, chemical control derivation and application in non-nuclear facilities are much less onerous than the comprehensive hazard analysis process used in nuclear facilities, even in circumstances in which chemicals are not initiators to, or do not exacerbate a nuclear event. While the derivation and control approaches used in these two types of facilities are disparate, the safety results are similarly effective based on a review of reported chemical events from 2014 through 2018. While both approaches achieve comparable safety outcomes, the approach used in nuclear facilities results in significantly greater preparation costs and implementation costs. Furthermore, the problem with the differing approach is not relegated to the control preparation and implementation burden. The operational impact of potentially unnecessary controls slows mission completion without a corresponding increase in safety, not to mention the dilution of the importance of Technical Safety Requirements. The proposed solution must first include a critical and thorough examination of DOE Complex and top-tier chemical industry chemical hazard control practices, coupled with a similar examination of the driving facility regulatory requirements. Results from the examination can then be used to fuel a bold departure from current chemical control practices in Hazard Category 1, 2, and 3 nuclear facilities. Development of an improved and consistent chemical hazard control process would follow, one that continues to ensure safety while accelerating mission completion and significantly reducing the burden associated with chemical hazard control development and implementation. The improved process must establish a hierarchy where radiological hazards are addressed using safety class and safety significant controls and chemical hazards are addressed using overarching safety management programs (with limited unique exceptions). The improved Hazard Category 1,2, and 3 nuclear facility chemical hazard control strategy, while compliant with 10 CFR 830 [1], would be founded on the requirements in 10 CFR 851, Worker Safety and Health Program [2], and the complementary DOE O 151.1D, Comprehensive Emergency Management System [3]. In this way, the Hazard Category 1, 2, and 3 nuclear facility chemical hazard control strategy would, wherever appropriate, be the same process used at other DOE Complex facilities. Ultimately, the improved process will maintain safety and significantly reduce costs and life cycle risk through faster mission completion. (authors)
No abstract provided.
Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)
Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) providesFederal agencies with information, guidance, and assistance in using renewable energy.
Concerns over the mixing performance of the planned pulse jet mixed (PJM) vessels for high-solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing program. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels (High-Level Waste Facility lag storage and feed blending process), ultrafiltration feed preparation vessels (ultrafiltration process system), and plant wash vessels (plant wash and disposal system). The SHSV concept uses multiple smaller vessels (60 500 L - 79 500 L nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than having to qualify earlier multiple vessel designs. An Integrated Technical Team consisting of the U.S. Department of Energy, Bechtel National, Inc., and independent experts was established to accelerate and provide oversight and direction of the test program and SHSV qualification. Qualification of the SHSV for mixing has now been achieved through a comprehensive full-scale vessel testing program conducted in 2017 with a prototypic SHSV under a set of most adverse design conditions, in conjunction with additional engineering analyses. This paper will present an overview of the SHSV, results from the three-phase full-scale vessel test and qualification program completed in September 2017, and the management program to achieve resolution of the PJM mixing technical issue. (authors)
As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.
This presentation provides a program management update on the Safeguards and Separations Integrated Performance and Safety Code (IPSC) program in the DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS). It provides an overview of FY11 work packages at multiple DOE Labs and includes material on challenge problem definitions for the IPSC effort.
This Project Closure Report is the final project document required to complete the project record and to close the project in the office’s web-based project management system. This report is for use by senior management to assess major project outcomes and their impact, identify best practices and other useful insights for future projects, and identify any open issues meriting attention. In accordance with DOE Order 243.1B, Records Management Program, this report will be managed in accordance with all prescribed laws, regulations, directives, and processes to ensure adequate and proper documentation of DOE’s organizations, missions, functions, policies, and decisions (See 44 U.S.C., Chapters 21, 29, 31, 33, and 35; 36 CFR Subchapter B, Records Management, and all applicable National Archives and Records Administration (NARA) mandated guidance.
Fact sheet describes a Federal Energy Management Program Federal Energy and Water Management Award-winning project that deployed an innovative thermosyphon cooler (TSC) as a test bed on the roof of the National Renewable Energy Laboratory's Energy Systems Integration Facility (ESIF). In combination with existing evaporative towers, the TSC forms an extremely water-and cost-efficient hybrid cooling system.
Spent fuel pools (SFPs) were originally designed with low density storage racks that maintained subcriticality based on geometric separation. With the increasing need for storage, due to elimination of reprocessing as a viable alternative, SFPs with high-density racks required neutron absorber materials to control reactivity and maintain criticality safety margins. The Nuclear Energy Institute (NEI) conducted an industry wide survey in 2013 and the survey was updated recently based on additional utility data provided by Electric Power Research Institute (EPRI). The survey results show that about one-quarter of the pools in the United States either do not have neutron absorber material in the SFP or do not credit it even when it is present. Also, about half of the plants in the U.S. use BORAL{sup R} as the neutron absorber material followed by Metamic, Carborundum, Alcan, and borated stainless steel. For neutron absorber monitoring, the majority of the plants rely on a coupon testing program. However, for those plants that never installed coupons or have exhausted their supply of coupons from coupon sampling, in situ measurements at periodic intervals can be performed to determine the status of the neutron absorber. In this paper, an overview of the types of neutron absorber materials used in SFPs, the distribution of absorber material use by material type, types of monitoring programs as part of aging management programs, operational experience to date with different absorber materials based on monitoring programs, and industry initiatives toward addressing long-term performance issues related to neutron absorber material degradation and monitoring are presented. (authors)