Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

A Contrast in Use of Metrics in Earth Science Data Systems

In recent years there has been a surge in the number of systems for processing, archiving and distributing remotely sensed data. Such systems, working independently as well as in collaboration, have been contributing greatly to the advances in the scientific understanding of the Earth system, as well as utilization of the data for nationally and internationally important applications. Among such systems, we consider those that are developed by or under the sponsorship of NASA to fulfill one of its strategic objectives: "Study Earth from space to advance scientific understanding and meet societal needs." NASA's Earth science data systems are of varying size and complexity depending on the requirements they are intended to meet. Some data systems are regarded as NASA's "Core Capabilities" that provide the basic infrastructure for processing, archiving and distributing a set of data products to a large and diverse user community in a robust and reliable manner. Other data systems constitute "Community Capabilities". These provide specialized and innovative services to data users and/or research products offering new scientific insight. Such data systems are generally supported by NASA through peer reviewed competition. Examples of Core Capabilities are 1. Earth Observing Data and Information System (EOSDIS) with its Distributed Active Archive Centers (DAACs), Science Investigator-led Processing Systems (SIPSs), and the EOS Clearing House (ECHO); 2. Tropical Rainfall Measurement Mission (TRMM) Science Data and Information System (TSDIS); 3. Ocean Data Processing System (ODPS); and 4. CloudSat Data Processing Center. Examples of Community Capabilities are projects under the Research, Education and Applications Solutions Network (REASON), and Advancing Collaborative Connections for Earth System Science (ACCESS) Programs. In managing these data system capabilities, it is necessary to have well-established goals and to measure progress relative to them. Progress is measured through "metrics", which can be a combination of quantitative as well as qualitative assessments. The specific metrics of interest depend on the user of the metrics as well as the type of data system. The users of metrics can be data system managers, program managers, funding agency or the public. Data system managers need metrics for assessing and improving the performance of the system and for future planning. Program managers need metrics to assess progress and the value of the data systems sponsored by them. Also, there is a difference in the metrics needed for core capabilities that tend to be more complex, larger and longer-term compared to community capabilities and the community capabilities that tend to be simpler, smaller and shorter-term. Even among community capabilities there are differences; hence the same set of metrics does not apply to all. Some provide data products to users, some provide services that enable better utilization of data or interoperability among other systems, and some are a part of a larger project where provision of data or services is only a minor activity. There is also a contrast between metrics used for internal and external purposes. Examples of internal purposes are: ensuring that the system meets its requirements, and planning for evolution and growth. Examples of external purposes are: providing to sponsors indicators of success of the systems, demonstrating the contributions of the system to overall program success, etc. This paper will consider EOSDIS, REASON and ACCESS programs to show the various types of metrics needed and how they need to be tailored to the types of data systems while maintaining the overall management goals of measuring progress and contributions made by the data systems.

Ramapriyan, Hampapuram↗

Navigator program risk management

In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

risk management↗

Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

Brothers, Mary Ann↗

Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

Greene, William D.↗

STS-114: Discovery Launch Readiness Press Conference

This press conference, attended by representatives from the national, Florida, and aerospace media, addresses launch, weather, and safety issues related to Space Shuttle Discovery prior to its launch on the STS-114 Return to Flight mission. The Master of Ceremonies is George Diller from NASA Public Affairs, and the panelists are: Space Shuttle Program Manager Bill Parsons, ISS Program Manager (JSC) Bill Gerstenmaier, Space Shuttle Deputy Program Manager Wayne Hale, Director of Shuttle Processing Mike Wetmore, ISS Program Manager (JAXA) Dr. Kuniaki Shiraki, and Launch Weather Officer (USAF) Mindy Chavez. Questions included the following topics: predicted weather conditions at launch, contingency rescue plans, countdown procedures, and risk management, as well as implications of the Return to Flight for the International Space Station (ISS).

Source record↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Evaluation Report for the Sandia National Laboratories Recorded Information Management Training Program

The Recorded Information Management (RIM) training and guidance materials were originally evaluated to determine the current status of the training program. Specifically, how and where are training materials implemented and are members of the workforce (MOWs) regularly accessing them. The evaluation highlighted that there is a breadth of training materials and guidance available; however, the materials are often outdated, point to old Sandia Policies, and/or are in outdated templates. Additionally, there is currently no single-entry point for training, meaning that training is available via the RIM homepage, TEDs, etc. This means that MOWs must search in various webpages or systems for training. To ensure RIM training materials are regularly updated and are accessible for MOWs it is recommended to assign one staff member to manage the program training materials.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A program-level management system for the life cycle environmental and economic assessment of complex building projects

Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to establish the optimal O&M strategy at the program-level. • It can be applied to any other country or sector in the global environment.

54 ENVIRONMENTAL SCIENCES↗

The NBS data management technology program

The National Bureau of Standards (NBS) Data Management Technology Program is discussed. The NBS Data Management Technology Program addresses major problems encountered during the following stages of an application's lifetime: requirements analysis and data base design, system selection and implementation, operations management and conversion. Products developed include standard software specifications, guides to best practice, standard data elements and representations, and reports documenting the experiences of other organizations as they attempt to improve the management of their computing resources. Data base Laboratory facilities are maintained for the investigation and analysis of state of the art data base technology. These facilities support collaborative testing with researchers, vendors, users, and standards developers.

Wood, H. M.↗

Parallel processing for scientific computations

The main contribution of the effort in the last two years is the introduction of the MOPPS system. After doing extensive literature search, we introduced the system which is described next. MOPPS employs a new solution to the problem of managing programs which solve scientific and engineering applications on a distributed processing environment. Autonomous computers cooperate efficiently in solving large scientific problems with this solution. MOPPS has the advantage of not assuming the presence of any particular network topology or configuration, computer architecture, or operating system. It imposes little overhead on network and processor resources while efficiently managing programs concurrently. The core of MOPPS is an intelligent program manager that builds a knowledge base of the execution performance of the parallel programs it is managing under various conditions. The manager applies this knowledge to improve the performance of future runs. The program manager learns from experience.

Alkhatib, Hasan S.↗

Matrix management for aerospace 2000

The martix management approach to program management is an organized effort for attaining program objectives by defining and structuring all elements so as to form a single system whose parts are united by interaction. The objective of the systems approach is uncompromisingly complete coverage of the program management endeavor. Starting with an analysis of the functions necessary to carry out a given program, a model must be defined; a matrix of responsibility assignment must be prepared; and each operational process must be examined to establish how it is to be carried out and how it relates to all other processes.

Mccarthy, J. F., Jr.↗

Systems approach provides management control of complex programs

Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

Dudek, E. F., Jr.↗

Matrix management for aerospace 2000

The matrix management approach to program management is described, showing that it is an organized approach to attaining program objectives by defining and structuring all elements so as to form a single system whose parts are united by interaction. The objective of the systems approach is to attain an uncompromised complete coverage of the program management effort. It is demonstrated that beginning with an analysis of the functions necessary to carry out a given program, a model must be defined; a matrix of responsibility assignment must be prepared; and each operational process is examined to establish how it is to be implemented and how it relates to all other processes.

Mccarthy, J. F., Jr.↗

Sandia National Laboratories, California Environmental Management System Program Manual.

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia National Laboratories, California Environmental Management System Program Manual.

The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗