Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plug”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program (Rev. 0)

This work plan describes the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2008. Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refining Control, Charging, and Battery Chemistry for CO 2 e Savings in Heavy-Duty Off-Road Plug-In Series Hybrid

With current and future regulations continuing to drive reductions in carbon dioxide equivalent (CO 2 e) emissions in the on-road industry, the off-road industry is also likely to be regulated for fuel and CO 2 e savings. This work focuses on converting a heavy-duty off-road material handler from a conventional diesel powertrain to a plug-in series hybrid, achieving a 49% fuel reduction and 29% CO 2 e reduction via simulation. Control strategies were refined for energy savings, including a regenerative braking strategy to increase regenerative braking and a load-following hydraulic strategy to decrease electrical energy consumption. The load-following hydraulic control shuts off the hydraulic electric machine when it is not needed—an approach not previously seen in a load-sensing, pressure-compensated system. Furthermore, these strategies achieved a 24.1% fuel savings, resulting in total savings of 61% in fuel and 41% in CO 2 e in the plug-in series compared to the conventional machine. Beyond control strategies, this study evaluated battery chemistry and charging strategy refinements for total cost of ownership (TCO) and lifetime CO 2 e. LFP batteries emerged as the most cost-effective and least emitting due to their longer lifespan, which reduced replacement frequency. Charging comparisons showed that Level 2 charging (L2C) typically resulted in lower TCO but higher lifetime CO 2 e than DC fast charging (DCFC). DCFC costs were heavily influenced by local demand charges, and DCFC emissions were heavily influenced by local grid emissions.

33 ADVANCED PROPULSION SYSTEMS↗

Wide Dynamic Range Porous Plug for SIRTF

The most recent approach to the Space Infrared Telescope Facility (SIRTF) uses a new design concept in which the telescope is launched warm and subsequently cooled to operating temperature on orbit. At launch, the cryostat is at 2 K and the telescope is at room temperature. Cooldown of the telescope will be accomplished initially through radiation to space. Final cooldown to the 5.5 K operating temperature is done with helium vapor. Initially, the helium flow on orbit will be 20 to 30 times larger than required for steady-state operation. The vent line and the liquid/vapor phase separator (porous plug) therefore must accommodate a large dynamic operational range.For ground testing of IR instruments, the required temperature is 1.5 K. The helium tank temperature for both ground testing and space operations thus needs to be at 1.4 K. We present a discussion of the requirements, a conceptual design, and initial laboratory test results with candidate porous plugs and associated instrumentation. A discussion of possible connections to the design of the Gravity Probe-B cryostat will be presented also.

SIRTF, Liquid/Vapor Phase, Separator, Porous Plug↗

Gas Trap Plug Design, Function and Performance

The cooling loops of the Internal Active Thermal Control System (IATCS) on the Node 3, Node 2 and US Laboratory (USL) Modules of the International Space Station (ISS) have been serviced by Gas Traps (GTs) since the onset of operations. These traps serve to protect the pumping function of the cooling loops by eliminating free gas that would otherwise impact the impellers and cause a loop shutdown. Gas Trap Plug Assemblies (GTPAs) have been designed, manufactured and tested, to permit function of the IATCS in the event of a loss of cabin atmosphere and long term decrew event. The GTPA also serve to give the crew additional time to evacuate the United States Operating Segment (USOS) in the unlikely event of an Ammonia breach of an Interface Heat Exchanger (IFHX). These GTPAs have been installed on the ISS IATCS since May 2019. This paper will address purpose, design and testing of the GTPA. The paper will also provide analyses showing residual trapping capability and free gas elimination of the GTs even while tightly plugged, for both the GTs and the Alternate Gas Trap Assemblies (AGTAs) ground spares.

Gas Trap Plugs↗

Reducing Plug and Process Loads for a Large Scale, Low Energy Office Building: NREL's Research Support Facility; Preprint

This paper documents the design and operational plug and process load energy efficiency measures needed to allow a large scale office building to reach ultra high efficiency building goals. The appendices of this document contain a wealth of documentation pertaining to plug and process load design in the RSF, including a list of equipment was selected for use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hybrid and Plug-In Electric Vehicles (Spanish Version); Clean Cities, Energy Efficiency & Renewable Energy (EERE)

This is a Spanish-language brochure about hybrid and plug-in electric vehicles, which use electricity as their primary fuel or to improve the efficiency of conventional vehicle designs. These vehicles can be divided into three categories: hybrid electric vehicles (HEVs), plug-in hybrid electric vehicles (PHEVs), all-electric vehicles (EVs). Together, they have great potential to cut U.S. petroleum use and vehicle emissions.

33 ADVANCED PROPULSION SYSTEMS↗

Hybrid and Plug-in Electric Vehicles

Hybrid and plug-in electric vehicles use electricity either as their primary fuel or to improve the efficiency of conventional vehicle designs. This new generation of vehicles, often called electric drive vehicles, can be divided into three categories: hybrid electric vehicles (HEVs), plug-in hybrid electric vehicles(PHEVs), and all-electric vehicles (EVs). Together, they have great potential to reduce U.S. petroleum use.

hybrid, HEV, plug-in, PHEV, electric vehicle, EV, ↗

All-SiC Inductively Coupled Charger with Integrated Plug-in and Boost Functionalities for PEV Applications

So far, vehicular power electronics integration is limited to the integration of on-board battery chargers (OBC) into the traction drive system and sometimes to the accessory dc/dc converters in plug-in electric vehicles (PEV). These integration approaches do not provide isolation from the grid although it is an important feature that is required for user interface systems that have grid connections. This is therefore a major limitation that needs to be addressed along with the integrated functionality. Furthermore, there is no previous study that proposes the integration of wireless charger with the other on-board components. This study features a unique way of combining the wired and wireless charging functionalities with vehicle side boost converter integration and maintaining the isolation to provide the best solution to the plug-in electric vehicle users. The new topology is additionally compared with commercially available OBC systems from manufacturers.

boost converter↗

Plug Load Management System Field Study: Wireless Meter and Controls

This presentation offers background on GSA's Green Proving Ground (GPG) and DOE's High Impact Technology (HIT) Catalyst work, and a field study that assessed a plug load management (PLM) system in two commercial building applications. The Ibis InteliNetwork (TM) PLM system enables users to measure and analyze device energy use and identify opportunities for reduction of plug load energy use, and set times for individual devices (or groups of devices) to turn off when not in use. The presentation gives an overview of the PLM demonstration project, its results, and lessons learned.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Plug Load Management Through Occupant Engagement at Washington State University

To decrease costs and improve building occupant safety, Washington State University (WSU) began planning a plug load management campaign in 2020, with implementation beginning in 2021. This case study describes the campaign's goals, approach, and results over the past 5 years, ultimately showing that occupant- and behavior-focused strategies can meaningfully reduce plug load energy use while improving health and safety.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable synthesis of palladium icosahedra in plug reactors for the production of oxygen reduction reaction catalysts

We have synthesized Pd icosahedra with uniform, controllable sizes in plug reactors separated by air. The oxygen contained in the air segments not only contributed to the generation of a reductant from diethylene glycol in situ, but also oxidized elemental Pd back to the ionic form by oxidative etching and thus slowed down the reduction kinetics. Compared to droplet reactors involving silicone oil or fluorocarbon, the use of air as a carrier phase could reduce the production cost by avoiding additional procedures for the separation of products from the oil. The average diameters of the Pd icosahedra could be readily controlled in the range of 12–20 nm. The Pd icosahedra were further employed as seeds for the production of Pd@Pt 2–3L core-shell icosahedra, which could serve as a catalyst toward the oxygen reduction reaction with greatly enhanced activity. As a result, we believe that the plug reactors could be extended to other types of noble-metal nanocrystals for their scale-up production.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Embolization of the Gastroduodenal Artery Before Selective Internal Radiotherapy: A Prospectively Randomized Trial Comparing Platinum-Fibered Microcoils with the Amplatzer Vascular Plug II

The Amplatzer Vascular Plug II (AVP II) is a novel device for transcatheter vessel occlusion, for which only limited comparative data exist. Embolotherapy of the gastroduodenal artery (GDA) is essential before internal radiotherapy (SIRT) in order to prevent radiation-induced peptic ulcerations due to migration of yttrium-90 microspheres. The purpose of this study was to compare the vascular anatomical limitations, procedure time, effectiveness, and safety of embolization of the GDA with coils versus the AVP II. Fifty patients stratified for SIRT were prospectively randomized for embolization of the GDA with either coils or the AVP II. The angle between the aorta and the celiac trunk, diameter of the GDA, fluoroscopy time and total time for embolization, number of embolization devices, complications, and durability of vessel occlusion at follow-up angiography for SIRT were recorded. A t-test was used for statistical analysis. Embolizations with either coils or the AVP II were technically feasible in all but two patients scheduled for embolization of the GDA with the AVP II. In both cases the plug could not be positioned due to the small celiac trunk outlet angles of 17{sup o} and 21{sup o}. The mean diameter of the GDA was 3.7 mm (range, 2.2-4.8 mm) for both groups. The procedures differed significantly in fluoroscopy time (7.8 min for coils vs. 2.6 min for the AVP II; P < 0.001) and embolization time (23.1 min for coils vs. 8.8 min for the AVP II; P < 0.001). A mean of 6.0 {+-} 3.2 coils were used for GDA embolization, while no more than one AVP II was needed for successful vessel occlusion (P < 0.001). One coil migration occurred during coil embolization, whereas no procedural complication was encountered with the use of the AVP II. Vessel reperfusion was noted in only one patient, in whom coil embolization was performed. In conclusion, embolization of the GDA with the AVP II is safe, easy, rapid, and highly effective; only an extremely sharp-angled celiac trunk outlet represented an anatomical limitation for device deployment.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The AMPLATZER Vascular Plug 4: Preliminary Experience

The purpose of this communication is to describe our preliminary experience with the AMPLATZER Vascular Plug 4 (AVP 4) in peripheral vascular embolization. The AVP 4 was used for peripheral vascular embolization in five patients with renal pseudoaneurysm (n = 2), postsurgical peritoneal bleeding (n = 1), posttraumatic gluteal hemorrhage (n = 1), and intercostal pseudoaneurysm (n = 1). Occlusion time was recorded. Patients were followed up clinically and by imaging for 1 month after the procedure. All treated vessels or vascular abnormalities were successfully occluded within 3 min for low-flow circulation and over 8 min for high-flow circulation. At 1-month follow-up, all patients were symptom-free. All deployed devices remained in the original locations and desirable configurations. In conclusion, the AVP 4 seems to be safe and effective for occluding peripheral vessels and vascular abnormalities. Because of its compatibility with 0.038-in. catheters, it can be deployed through a diagnostic catheter following angiography without exchanging a sheath or guiding catheter. Compared with the previous generation of vascular plugs, the AVP 4 allows for faster procedure times and decreased exposure to radiation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Aneurysm of an Anomalous Systemic Artery Supplying the Normal Basal Segments of the Left Lower Lobe: Endovascular Treatment with the Amplatzer Vascular Plug II and Coils

An anomalous systemic artery originating from the descending thoracic aorta supplying the normal basal segments of the lower lobe of the left lung without sequestration is a rare congenital anomaly. The published surgical treatments include lobectomy, segmentectomy, anastomosis, and ligation. In addition, endovascular treatment with coils has been reported. A second-generation occluder, the Amplatzer Vascular Plug II (AVP II), has a central plug and two occlusion disks and a finer, more densely woven nitinol wire, thus enabling faster embolization. This published case is the first successful occlusion of an aneurysm of an anomalous systemic artery with the AVP II and fibered coils, with 10 months of follow-up.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Effects of Nozzle Radial Position, Separation Angle, and Gas Flow Partitioning on the Mixing, Eye Area, and Wall Shear Stress in Ladles Fitted with Dual Plugs

Mixing time, slag eye area, and wall shear stress in a ladle fitted with dual plugs have been studied as a function of operating variables, namely, gas flow rate, radial nozzle position, separation angle between nozzles and flow rate partitioning. While the mixing time and slag eye area have been experimentally investigated in a scaled water model (with and without a top slag layer), the shear stress on the vessel wall has been studied computationally via a RANS-based turbulent, three-dimensional coupled Eulerian–Lagrangian (VOF-DPM), multiphase flow model. Experimental and computational results have indicated that the mixing, eye area, and wall shear stress depend on the gas flow rate, i.e., while mixing efficiency increases with the increasing gas flow rate, the slag eye area, and wall shear stress, in contrast, become more pronounced with the increasing gas flow, leading to an undesirable operating regime. The radial nozzle position, separation angle between the nozzles and flow rate partitioning at any given flow rate also influence the ladle process performance, influencing the mixing, eye area, and wall shear stress, albeit to a varied degree. Within the range of operating conditions studied, an expected inverse correspondence between mixing time and shear behavior was observed. Experimental and computational results in conjunction have indicated that the best arrangement of porous plugs or gas injection nozzles for superior ladle process performance is dependent on the gas flow rate and is specific to the desired objective (i.e., decreasing the mixing time, or slag eye area and wall shear stress). Hence, a unique gas injection practice cannot and should not be suggested as the optimum for ladle metallurgy in steelmaking. Nevertheless, if the mixing time is the parameter of primary interest, a nozzle configuration with equal flow partitioning (1:1) between the nozzles and identical nozzle radial positions (0.7R/0.7R, 45 deg) should suffice for both low and high gas flow rates. In contrast, a nonidentical nozzle radial position (0.7R/0.5R, 90 deg) and an unequal gas flow rate per nozzle (1:3) appear preferable if both ladle eye and shear stresses, rather than mixing, are the issues of concern.

36 MATERIALS SCIENCE↗

Heat activates the AAA+ HslUV protease by melting an axial autoinhibitory plug

At low temperatures, protein degradation by the AAA+ HslUV protease is very slow. New crystal structures reveal that residues in the intermediate domain of the HslU 6 unfoldase can plug its axial channel, blocking productive substrate binding and subsequent unfolding, translocation, and degradation by the HslV 12 peptidase. Biochemical experiments with wild-type and mutant enzymes support a model in which heat-induced melting of this autoinhibitory plug activates HslUV proteolysis.

59 BASIC BIOLOGICAL SCIENCES↗