Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Ground Risk Informed Operational Planning for Small Unmanned Aerial Systems

Increasing quantities of small Unmanned Aerial Systems (sUAS) operations present many challenges in terms of safe adoption and integration into existing airspace. The ability to study and quantify the risk to third parties on the ground prior to flight is an important step toward enabling Beyond Visual Line of Sight (BVLOS) operations. The Ground Risk Assessment Service Provider (GRASP) software is a capability developed by NASA to assist with third-party risk quantification and risk-informed flight planning. In this paper, two nominal flight paths intended to represent an infrastructure inspection mission are evaluated using the software to demonstrate its utility. A method is also introduced for adding other NASA-developed capabilities into a single architecture to assess a broader set of operational risks associated with BVLOS operations. These capabilities include a navigation system performance prediction tool, a high fidelity vehicle dynamics model, high resolution wind field data, and other information pertinent to operators. Data produced by these capabilities are combined to enable use of the Performance Based Navigation (PBN) concept borrowed from conventional aviation, providing quantified flight path uncertainty for where the sUAS is likely to be relative to its nominal flight plan. Ground risk is assessed within this region of uncertainty, giving a higher level of confidence in the solution compared to an analysis of only the nominal flight path.

Ground Risk↗

A Hydrogen Load Modeling Method for Integrated Hydrogen Energy System Planning: Preprint

The integrated hydrogen energy system incorporates hydrogen energy into the power grid, which has been recognized as a promising option for reaching a 100% renewable electricity supply. It can make a profit because the hydrogen produced can be sold as fuel or used to generate electricity for grid services. In this paper, we develop a planning model for the integrated hydrogen energy system that considers the uncertainty of the load demand, the renewable energy generation, and the market prices. To calculate the hydrogen load, we simulate the refueling operations at a hydrogen fueling station over the course of one day. Moreover, the long-term profitability of the integrated system under both cur-rent and future conditions is compared in the planning results.

active distribution network↗

Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Markov Decision Process based Trajectory Planning for UAVs under Uncertain Wind Conditions

In this paper we propose a Markov Decision Process (MDP) algorithm for path-planning of Unmanned Aviation Vehicles (UAVs) under varying wind conditions. Solutions to path-planning for UAVs are becoming increasingly necessary as autonomous UAVs continue to enter commercial and government spaces. Path-planning is inherently challenging, as UAVs needs to account for dynamically changing flying conditions such as weather, obstacle or no-fly zones, degraded vehicle health and off-nominal battery power consumption. Machine learning methods such as Markov Decision Process (MDPs) have the potential to revolutionize how vehicles navigate in such uncertain environments. Previous papers have demonstrated the use of MDPs to optimize UAV path-planning for energy consumption under time-varying wind distribution. In this study, UAV trajectories from a pre-determined waypoint to target cell, will be computed on a 7X7 grid environment by optimizing parameters for mission assurance and safety limits in addition to the energy consumption, and operation time. The UAV navigates the grid by taking actions to move in either of the eight cardinal and intercardinal directions, under constant thrust profile. The next state of the UAV is calculated by considering its action, transition probability, obstacle cells and the wind speed magnitude and direction. Both constant and stochastic wind will be considered in this paper, the parameters being extracted from real wind measurements in proximity to an experimental UAV flight. One of the studies to be demonstrated in this paper is that as the unmanned airspace gets more complex with multiple vehicles and environmental uncertainties, trade-offs between energy consumption, operation time, risk tolerance, and mission assurance needs to be made. Further, MDPs are capable of fast computation of UAV trajectories under varying wind, hence making them suitable for in-flight path planners.

decision-making↗

Development of a thermal gradient cloud condensation nucleus spectrometer

Droplet clouds are one of the most important factors controlling the albedo and hence the temperature of out planet. Anthropogenic aerosols, such as black carbon (BC) organic carbon (OC) and sulfate, have a strong influence on cloud albedo. IPCC (2001) has estimated the global mean forcing from aerosols to be potentially as large as that of green house gases but opposite in sign. However, the uncertainties associated with the indirect aerosol forcing preclude a quantitative estimate. An additional impact on the indirect aerosol forcing, not quantified by IPCC, arises from recently identified chemical factors, for examples, interactions of atmospheric soluble gases, slightly soluble solutes, and organic substance with aerosols, which may influence the formation of cloud droplets. Recent studies suggest that inclusion of chemical effects on aerosol droplets. We plan to conduct several critical laboratory experiments that will reduce the uncertainty associated with indirect radiative forcing due to chemical modification of sulfate and BC aerosols by ambient gases.

organic carbon↗

Impact of Tactical and Strategic Weather Avoidance on Separation Assurance

The ability to keep flights away from weather hazards while maintaining aircraft-to-aircraft separation is critically important. The Advanced Airspace Concept is an automation concept that implements a ground-based strategic conflict resolution algorithm for management of aircraft separation. The impact of dynamic and uncertain weather avoidance on this concept is investigated. A strategic weather rerouting system is integrated with the Advanced Airspace Concept, which also provides a tactical weather avoidance algorithm, in a fast time simulation of the Air Transportation System. Strategic weather rerouting is used to plan routes around weather in the 20 minute to two-hour time horizon. To address forecast uncertainty, flight routes are revised at 15 minute intervals. Tactical weather avoidance is used for short term trajectory adjustments (30 minute planning horizon) that are updated every minute to address any weather conflicts (instances where aircraft are predicted to pass through weather cells) that are left unresolved by strategic weather rerouting. The fast time simulation is used to assess the impact of tactical weather avoidance on the performance of automated conflict resolution as well as the impact of strategic weather rerouting on both conflict resolution and tactical weather avoidance. The results demonstrate that both tactical weather avoidance and strategic weather rerouting increase the algorithm complexity required to find aircraft conflict resolutions. Results also demonstrate that tactical weather avoidance is prone to higher airborne delay than strategic weather rerouting. Adding strategic weather rerouting to tactical weather avoidance reduces total airborne delays for the reported scenario by 18% and reduces the number of remaining weather violations by 13%. Finally, two features are identified that have proven important for strategic weather rerouting to realize these benefits; namely, the ability to revise reroutes and the use of maneuvers that start far ahead of encountering a weather cell when rerouting around weather.

Refai, Mohamad S.↗

A Hydrogen Load Modeling Method for Integrated Hydrogen Energy System Planning

The integrated hydrogen energy system incorporates hydrogen energy into the power grid, which has been recognized as a promising option for reaching a 100% renewable electricity supply. It can make a profit because the hydrogen produced can be sold as fuel or used to generate electricity for grid services. In this paper, we develop a planning model for the integrated hydrogen energy system that considers the uncertainty of the load demand, the renewable energy generation, and the market prices. To calculate the hydrogen load, we simulate the refueling operations at a hydrogen fueling station over the course of one day and generate representative load profiles with K-means clustering. Moreover, the long-term profitability of the integrated system under both current and future conditions is validated in 10-year planning results.

grid service↗

The effect of microwave backscatter uncertainty on satellite radar altimeter accuracy

The effect of variations in ocean surface roughness characteristics with upwind/downwind direction, reported by other investigators, is used to compute radar cross section (RCS) and to assess the errors which may arise in present and planned altimeter sensors. Based on an analysis of the rough surface impulse response, the uncertainty between attitude angle and RCS asymmetry is found to cause height errors as large as 12 cm, depending on off-nadir angles and sea state. Additionally, the previously reported data in conjunction with computed facet backscatter are found to produce RCS characteristics at large off-nadir angles which are in better agreement with experimental results than those predicted by physical optics Gaussian theory.

Miller, L. S.↗

Yes, No, Maybe So: Human Factors Considerations for Fostering Calibrated Trust in Foundation Models Under Uncertainty

High-stakes analytical environments require analysts to evaluate evidence and generate conclusions to inform critical decisions often under conditions of uncertainty. Probabilistic decision-making based on incomplete or inaccurate information can reduce productivity, compromise national interests, and endanger public safety. Researchers are developing expert systems built on foundation models (FMs) to support analysts’ decision-making processes by enabling human-artificial intelligence (AI) teaming, in part through the quantification and expression of uncertainty information. As FMs continue to mature, it is imperative to correspondingly consider analysts’ needs for appropriately interpreting and using uncertainty information. However, prior research indicates that it remains unclear how analysts engage with FM-generated uncertainty information and the extent to which these interactions influence trust in, and reliance on, expert systems. We plan to review the state of the science and conduct an exploratory, qualitative study to (a) understand how properly communicated uncertainty can foster calibrated trust and appropriate reliance and (b) identify approaches for effectively conveying FM-generated uncertainty information during analytical workflows. We will administer semi-structured interviews with analysts from a specific high-stakes analytical environment to collect their current experiences with job-related uncertainty and their impressions when viewing FM-generated uncertainty information. During the interview protocol, participants will be presented with several different FM outputs and invited to discuss their thoughts and beliefs about the uncertainty information displayed. Participants may provide insights into how trust and reliance may be influenced by uncertainty. The results of this study will help us to better understand how analysts currently interpret and use uncertainty information. Our findings may inform human factors recommendations for effectively conveying uncertainty information to foster calibrated trust in, and appropriate reliance on, expert systems. Interaction designers and FM developers can use this knowledge to enhance human-AI teaming and ensure the responsible deployment of FM-based expert systems in analytical workflows.

97 MATHEMATICS AND COMPUTING↗

Assessing boundary condition and parametric uncertainty in numerical-weather-prediction-modeled, long-term offshore wind speed through machine learning and analog ensemble

To accurately plan and manage wind power plants, not only does the time-varying wind resource at the site of interest need to be assessed but also the uncertainty connected to this estimate. Numerical weather prediction (NWP) models at the mesoscale represent a valuable way to characterize the wind resource offshore, given the challenges connected with measuring hub-height wind speed. The boundary condition and parametric uncertainty associated with modeled wind speed is often estimated by running a model ensemble. However, creating an NWP ensemble of long-term wind resource data over a large region represents a computational challenge. Here, we propose two approaches to temporally extrapolate wind speed boundary condition and parametric uncertainty using a more convenient setup in which a mesoscale ensemble is run over a short-term period (1 year), and only a single model covers the desired long-term period (20 year). We quantify hub-height wind speed boundary condition and parametric uncertainty from the short-term model ensemble as its normalized across-ensemble standard deviation. Then, we develop and apply a gradient-boosting model and an analog ensemble approach to temporally extrapolate such uncertainty to the full 20-year period, for which only a single model run is available. As a test case, we consider offshore wind resource characterization in the California Outer Continental Shelf. Both of the proposed approaches provide accurate estimates of the long-term wind speed boundary condition and parametric uncertainty across the region (R 2 >0.75), with the gradient-boosting model slightly outperforming the analog ensemble in terms of bias and centered root-mean-square error. At the three offshore wind energy lease areas in the region, we find a long-term median hourly uncertainty between 10 % and 14 % of the mean hub-height wind speed values. Finally, we assess the physical variability in the uncertainty estimates. In general, we find that the wind speed uncertainty increases closer to land. Also, neutral conditions have smaller uncertainty than the stable and unstable cases, and the modeled wind speed in winter has less boundary condition and parametric sensitivity than summer.

17 WIND ENERGY↗

Uncertainty Quantification in CO2 Trapping Mechanisms: A Case Study of PUNQ-S3 Reservoir Model Using Representative Geological Realizations and Unsupervised Machine Learning

Evaluating uncertainty in CO2 injection projections often requires numerous high-resolution geological realizations (GRs) which, although effective, are computationally demanding. This study proposes the use of representative geological realizations (RGRs) as an efficient approach to capture the uncertainty range of the full set while reducing computational costs. A predetermined number of RGRs is selected using an integrated unsupervised machine learning (UML) framework, which includes Euclidean distance measurement, multidimensional scaling (MDS), and a deterministic K-means (DK-means) clustering algorithm. In the context of the intricate 3D aquifer CO2 storage model, PUNQ-S3, these algorithms are utilized. The UML methodology selects five RGRs from a pool of 25 possibilities (20% of the total), taking into account the reservoir quality index (RQI) as a static parameter of the reservoir. To determine the credibility of these RGRs, their simulation results are scrutinized through the application of the Kolmogorov–Smirnov (KS) test, which analyzes the distribution of the output. In this assessment, 40 CO2 injection wells cover the entire reservoir alongside the full set. The end-point simulation results indicate that the CO2 structural, residual, and solubility trapping within the RGRs and full set follow the same distribution. Simulating five RGRs alongside the full set of 25 GRs over 200 years, involving 10 years of CO2 injection, reveals consistently similar trapping distribution patterns, with an average value of Dmax of 0.21 remaining lower than Dcritical (0.66). Using this methodology, computational expenses related to scenario testing and development planning for CO2 storage reservoirs in the presence of geological uncertainties can be substantially reduced.

Mahjour, Seyed Kourosh↗

Automated Planning and Scheduling for Space Mission Operations

Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

scheduling↗

Fuzzy logic path planning system for collision avoidance by an autonomous rover vehicle

The Space Exploration Initiative of the United States will make great demands upon NASA and its limited resources. One aspect of great importance will be providing for autonomous (unmanned) operation of vehicles and/or subsystems in space flight and surface exploration. An additional, complicating factor is that much of the need for autonomy of operation will take place under conditions of great uncertainty or ambiguity. Issues in developing an autonomous collision avoidance subsystem within a path planning system for application in a remote, hostile environment that does not lend itself well to remote manipulation by Earth-based telecommunications is addressed. A good focus is unmanned surface exploration of Mars. The uncertainties involved indicate that robust approaches such as fuzzy logic control are particularly appropriate. Four major issues addressed are (1) avoidance of a fuzzy moving obstacle; (2) backoff from a deadend in a static obstacle environment; (3) fusion of sensor data to detect obstacles; and (4) options for adaptive learning in a path planning system. Examples of the need for collision avoidance by an autonomous rover vehicle on the surface of Mars with a moving obstacle would be wind-blown debris, surface flow or anomalies due to subsurface disturbances, another vehicle, etc. The other issues of backoff, sensor fusion, and adaptive learning are important in the overall path planning system.

Murphy, Michael G.↗

Construction of Supersonic Flight Dynamics Test (SFDT-2) Vehicle Monte Carlo Splashdown Footprints for Use in Range Safety and Recovery Planning

Overview of Low Density Supersonic Decelerator (LDSD) SFDT-2 ( Supersonic Flight Dynamics Test-2) flight profile; Description of Monte Carlo flight dynamics simulations performed; Modeling and uncertainties; Results with statistical prediction of test vehicle splashdown location; Use of Monte Carlo results for range safety and recovery planning.

Strauss, Bill↗

Evaluation of CFD as a Surrogate for Wind-Tunnel Testing: Experimental Uncertainty Quantification for the UPWT Flow Survey Test

A series of wind tunnel tests are being performed at the Unitary Plan Wind Tunnel (UPWT)at NASA Langley Research Center to assess the validity of using computational fluid dynamics(CFD) as a surrogate for wind tunnel testing. In order to make proper comparisons, uncertainties in CFD results and experimental data must be well understood. The material presented highlights the methods, assumptions, and inputs used to achieve experimental uncertainty estimates. Results for a small subset of tunnel conditions and variables of interest from the first test in the series, the Flow Survey Test, are highlighted and sample CFD comparisons are shown. The bulk of the results from this work are used for comparisons in other AIAA conference papers related to this test series.

Erin P Hubbard↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Experimental uncertainty survey and assessment

An uncertainty analysis and assessment of the specific impulse determination during Space Shuttle Main Engine testing is reported. It is concluded that in planning and designing tests and in interpreting the results of tests, the bias and precision components of experimental uncertainty should be considered separately. Recommendations for future research efforts are presented.

Coleman, Hugh W.↗