Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Integrated Intermodal Passenger Transportation System

Modern transportation consists of many unique modes of travel. Each of these modes and their respective industries has evolved independently over time, forming a largely incoherent and inefficient overall transportation system. Travelers today are forced to spend unnecessary time and efforts planning a trip through varying modes of travel each with their own scheduling, pricing, and services; causing many travelers to simply rely on their relatively inefficient and expensive personal automobile. This paper presents a demonstration program system to not only collect and format many different sources of trip planning information, but also combine these independent modes of travel in order to form optimal routes and itineraries of travel. The results of this system show a mean decrease in inter-city travel time of 10 percent and a 25 percent reduction in carbon dioxide emissions over personal automobiles. Additionally, a 55 percent reduction in carbon dioxide emissions is observed for intra-city travel. A conclusion is that current resources are available, if somewhat hidden, to drastically improve point to point transportation in terms of time spent traveling, the cost of travel, and the ecological impact of a trip. Finally, future concepts are considered which could dramatically improve the interoperability and efficiency of the transportation infrastructure.

Klock, Ryan↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, key product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule. The purpose of this advanced LAW glass research and development plan is to identify the near-term, mid-term, and longer-term research and development activities required to develop and validate advanced LAW glasses, property-composition models and their uncertainties, and an advanced glass algorithm to support WTP facility operations, including both Direct Feed LAW and full pretreatment flowsheets. Data are needed to develop, validate, and implement 1) new glass property-composition models and 2) a new glass formulation algorithm. Hence, this plan integrates specific studies associated with increasing the Na2O and SO3/halide concentrations in glass, because these components will ultimately dictate waste loadings for LAW vitrification. Of equal importance is the development of an efficient and economic strategy for 99Tc management. Specific and detailed studies are being implemented to understand the fate of Tc throughout the WTP flowsheet and the underlying mechanisms that dictate its partitioning between streams within the LAW vitrification facility. These studies are aimed at increasing the single-pass Tc retention in glass and the potential use of high-temperature mineral phases to capture Tc. The Tc-bearing mineral phases would be thermally stable and resistant to Tc release during feed melting reactions or they could serve as alternative waste forms. The LAW glass research and development is focused on reducing the total volume of LAW glass produced and minimizing the impact of (or potentially eliminating) the need for recycle.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Day-Ahead Forecasting with Federated LSTM to Plan Energy Sharing in a Community Microgrid

Energy balancing in microgrids is a key enabler of resilience. Community microgrids located close to each other have the added benefit of networking and sharing surplus energy, if available. Such complex decision-making runs on optimization that requires reliable short-term (up to very-short-term) forecasts of energy generation and consumption for scheduling or trading. Each microgrid may also opt to not expose their sensitive data such as consumption patterns of individual businesses or residences. This paper investigates a federated approach to dayahead forecasting that trains naive long short-term memory (LSTM) at each business in a microgrid and aggregates weights at the microgrid controller using proximal regularization. This approach ensures that the controller has access only to energy surplus/deficit and not the actual generation or consumption values, avoiding unwanted exposure of sensitive data. A community microgrid in Adjuntas, Puerto Rico with 3 businesses is selected as a case study with a laboratory-scale computing setup. A central LSTM forecaster, where sensitive data from businesses are aggregated at the controller, is implemented as a baseline for qualifying the results. This work serves as a proof-of-concept for scaling the approach to networked and nested microgrids with more complex control options.

Sundararajan, Aditya [ORNL] (ORCID:000000033577854↗

Fuel Cycle Research & Development: Technical Monthly – June 2012

Topics are: (1) MPACT Campaign - (a) Management and Integration • Coordination meetings between NE and NA-22, NA-24, and NA-82 were conducted the week of June 11th. Preparations are being made for the next MPACT working group meeting, scheduled for Aug 28-30 at Idaho Falls. In addition to covering accomplishments and discussing future plans, a site tour of INL facilities (MFC, EBR, ATR, INTEC) is being organized. (2) Accounting and Control Technologies - (a) Microcalorimetry • Now operating 256-pixel array at LANL. We are in the process of tuning detector parameters to improve and optimize performance. Preliminary measurements show approximate number of live pixels is similar to that observed previously at NIST. Continuing to study contribution to systematic error from uncertainties in tabulated gamma-ray energies. (b) Electrochemical Sensor • Testing of sensors fashioned from different precursor materials continued. SEM analysis of all used sensors has been or will be performed. (c) Lead Slowing Down Spectrometer • Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Continuing to look into a He4 detector. Research into local construction of a He4 detector continued. We have started to apply the algorithm to test the LSDS using experimental data from previous RPI measurements. PNNL also developed a plan to address the lack of statistics in the MCNP modeling of the NGSI 64 assemblies. The ISU graduate student built and tested a fission chamber to gain experience with them. (d) Fast Neutron Imaging to Quantify Nuclear Materials • The imaging detector design was modified for each pixel to have an 8 x 8 pixel array. Quotations and purchasing process for components, including the new PSD scintillator are in progress. (e) Fast Neutron Multiplicity Analysis • The team submitted two papers to the upcoming INMM meeting that are related to the fast neutron multiplicity R&D effort. Progress was made on the project's main goal of designing a concept for a prototype fast-neutron multiplicity counter. We started laying out the outline for the final report. We have been working with our ORNL collaborators to develop a new digitizer system to support our experimental campaign planned for next year. (3) MPACT Analysis Tools - (a) Multi-isotope Process Monitor • Fuel characterization framework development continued during June. A report describing the methodologies is being completed. Kenneth Dayman, from University of Texas, spent a week at PNNL wrapping up his master's research and working on a journal submission covering that work. The target journal is the IEEE transactions on Nuclear Science; submission is planned for the end of July. A proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program. The impact of gamma-ray spectrum counting statistics on the precision of relative radioisotope component intensities as reconstructed via Principal Component Regression (PCR) continued in June with Monte Carlo simulations of a two-component (i.e., two radioisotope) system. This work generalizes earlier studies in FY12 in which Poisson counting variations of only a single spectrum component were simulated. (b) Modeling and Simulation for Analysis of Safeguards Performance (Electrochemical) • Preliminary insights into safeguards challenges and the initial design for an electrochemical plant have been written up into an INMM paper and will be presented at the INMM Summer Meeting. Work is currently adding a new visualization capability for integrating materials accountancy with physical protection. (c) Material Control including Process Monitoring (Pattern Recognition, Sensors) • Fabrication of quartz chips continued at an external foundry. Awaiting delivery of the heat exchange manifold and chip holder. (d) MPACT System Integration and Technical Support • The initial report on cost-basis metrics for nuclear material security risk and proliferation risk was completed as scheduled. (4) Safeguards and Security by Design - (a) Used fuels storage security analysis, guidance and best practices • RFP was finalized and sent out. Awaiting response from World Institute for Nuclear Security. Coordinated with Scott Demuth on joint report • LANL milestone on best practices. Attended Nuclear Energy Institute National Nuclear Security Conference. Developed plan for soliciting input on prioritized issues for used fuel storage security. Worked on setting up a meeting with the Nuclear Regulatory Commission. Worked on FY2013 work package planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consolidation Radiotherapy in Primary Central Nervous System Lymphomas: Impact on Outcome of Different Fields and Doses in Patients in Complete Remission After Upfront Chemotherapy

Purpose: Avoidance radiotherapy or reduction of irradiation doses in patients with primary central nervous system lymphoma (PCNSL) in complete remission (CR) after high-dose methotrexate (HD-MTX)-based chemotherapy has been proposed to minimize the neurotoxicity risk. Nevertheless, no study has focused on the survival impact of radiation parameters, as far as we know, and the optimal radiation schedule remains to be defined. Methods and Materials: The impact on outcome and neurologic performance of different radiation fields and doses was assessed in 33 patients with PCNSL who achieved CR after MTX-containing chemotherapy and were referred to consolidation whole-brain irradiation (WBRT). Patterns of relapse were analyzed on computed tomography-guided treatment planning, and neurologic impairment was assessed by the Mini Mental Status Examination. Results: At a median follow-up of 50 months, 21 patients are relapse-free (5-year failure-free survival [FFS], 51%). WBRT doses {>=}40 Gy were not associated with improved disease control in comparison with a WBRT dose of 30 to 36 Gy (relapse rate, 46% vs. 30%; 5-year FFS, 51% vs. 50%; p = 0.26). Disease control was not significantly different between patients irradiated to the tumor bed with 45 to 54 Gy or with 36 to 44 Gy, with a 5-year FFS of 35% and 44% (p = 0.43), respectively. Twenty patients are alive (5-year overall survival, 54%); WB and tumor bed doses did not have an impact on survival. Impairment as assessed by the Mini Mental Status Examination was significantly more common in patients treated with a WBRT dose {>=}40 Gy. Conclusion: Consolidation with WBRT 36 Gy is advisable in patients with PCNSL in CR after HD-MTX-based chemotherapy. Higher doses do not change the outcome and could increase the risk of neurotoxicity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Optimizing Microgrid Energy Delivery Under High Uncertainty

One of the largest transitions in the power system today is the shift to a more sustainable and resilient power system. This is being driven by public opinion, changes in regulatory policies, and advancements in smart grid technologies. The most noticeable changes taking place is the integration of distributed energy sources (DERs); this study uses the term DER in the most general way as a resource that can be manipulated to alter energy delivery and flow in the transmission and distribution networks. Also, here it is preferred to focus on energy as the true need while power is a function of the equipment rating. As such, wind and solar, demand that can be manipulated, electric vehicles, electric energy storage, thermal storage, and storage in water system are all considered DERs. These additions to the distribution system are evolving the operation of distribution feeders into microgrids- communication, computing, and control-enabled resources that produce, transport, and utilize energy in a manner that provides cost, reliability, and resilience benefits. As this evolution progresses, the planning and operational management (scheduling and control) must explicitly include the consideration of risk. The management of system risk is currently in the purview of the utility and will likely remain so in the future. However, as each microgrid, as well as federation of microgrids, sees autonomy in order to provide maximum benefits to their constituents, they must assume responsibility to manage their internal risk. The primary scope of this study is the scheduling of resources in a distribution feeder(s) operating as microgrids. The study explores a distribution algorithm to develop the transactive schedule for the DERs, to minimize cost and risk over a time horizon, and an initial laboratory-scale to conduct implementation on distributed hardware. Results from case studies are presented that show that solutions derived by the distributed algorithm are valid. This study also discusses the continuing work on the expansion of: 1) the distributed algorithm from a deterministic to stochastic optimization formulation, and 2) implementation of the distributed algorithm into real-time simulation within the Power System laboratory at New Mexico State University (NMSU) and expanding to the Southwest Technology Development Institute located at NMSU where actual solar, energy storage, and demand response resources are installed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of safety engineering into a cost optimized development program.

A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'

Ball, L. W.↗

Planning for "What If" Scenarios

Interval Logic Corporation is a graduate of the Ames Technology Commercialization Center (Ames Research Center's business incubator). The founders are the developers of the Spike Scheduling system, the most successful scheduling technology ever developed for NASA. This software was used to double the operational efficiency of the Hubble Space Telescope. Today the software is called Leverage and used to optimize all levels of semiconductor manufacturing.

Source record↗

Demonstration of decomposition and optimization in the design of experimental space systems

Effective design strategies for a class of systems which may be termed Experimental Space Systems (ESS) are needed. These systems, which include large space antenna and observatories, space platforms, earth satellites and deep space explorers, have special characteristics which make them particularly difficult to design. It is argued here that these same characteristics encourage the use of advanced computer-aided optimization and planning techniques. The broad goal of this research is to develop optimization strategies for the design of ESS. These strategics would account for the possibly conflicting requirements of mission life, safety, scientific payoffs, initial system cost, launch limitations and maintenance costs. The strategies must also preserve the coupling between disciplines or between subsystems. Here, the specific purpose is to describe a computer-aided planning and scheduling technique. This technique provides the designer with a way to map the flow of data between multidisciplinary analyses. The technique is important because it enables the designer to decompose the system design problem into a number of smaller subproblems. The planning and scheduling technique is demonstrated by its application to a specific preliminary design problem.

Padula, Sharon↗

Power, Optimization, Waste Estimating, Resourcing Tool

Planning, Optimization, Waste Estimating, Resourcing tool (POWERtool) is a comprehensive relational database software tool that can be used to develop and organize a detailed project scope, plan work tasks, develop bottoms-up field cost and waste estimates for facility Deactivation and Decommissioning (D&D), equipment, and environmental restoration (ER) projects and produces resource-loaded schedules.

Nelson, Jerel↗

Modelling the Liquid Waste Operation at the Savannah River Site

Modeling Successes Dounreay – Site Closure Optimization and Risk Reduction Re-structuring and streamlining a complex project plan to achieve site decommissioning in reduced time and at reduced cost, through automated task prioritization. Idaho AMWTP – Multi-stream Optimization Speeding up a complex facility with many process lines, by utilizing all of the process lines more efficiently and reducing overall plant downtime, by coordinating repairs and shutdowns. AWE –Waste Repackaging and Relocation Relocating schedule for waste material from an old storage facility to a new purpose-built one, safely, and in a timely fashion that removed the need to reassure the safety of the old facility. Sellafield – Effluent, Sludge and HAW Treatment Improving a wide range of chemical engineered processes including aqueous effluent treatment, chemically-reactive sludge management and waste vitrification processing. Strategic Petroleum Reserve – Cavern Management Linking chemistry models of petroleum prediction, through engineering cavern management to financial modeling of gasoline sales to benefit US government

Jung, Andrew W.↗

Automated telescope scheduling

With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

Johnston, Mark D.↗

Autonomous Spacecraft Communication Interface for Load Planning

Ground-based controllers can remain in continuous communication with spacecraft in low Earth orbit (LEO) with near-instantaneous communication speeds. This permits near real-time control of all of the core spacecraft systems by ground personnel. However, as NASA missions move beyond LEO, light-time communication delay issues, such as time lag and low bandwidth, will prohibit this type of operation. As missions become more distant, autonomous control of manned spacecraft will be required. The focus of this paper is the power subsystem. For present missions, controllers on the ground develop a complete schedule of power usage for all spacecraft components. This paper presents work currently underway at NASA to develop an architecture for an autonomous spacecraft, and focuses on the development of communication between the Mission Manager and the Autonomous Power Controller. These two systems must work together in order to plan future load use and respond to unanticipated plan deviations. Using a nominal spacecraft architecture and prototype versions of these two key components, a number of simulations are run under a variety of operational conditions, enabling development of content and format of the messages necessary to achieve the desired goals. The goals include negotiation of a load schedule that meets the global requirements (contained in the Mission Manager) and local power system requirements (contained in the Autonomous Power Controller), and communication of off-plan disturbances that arise while executing a negotiated plan. The message content is developed in two steps: first, a set of rapid-prototyping "paper" simulations are preformed; then the resultant optimized messages are codified for computer communication for use in automated testing.

Controls↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Neural-Network Processor Would Allocate Resources

Global optimization problems solved quickly. Neural-network processor optimizes allocation of M resources among N expenditures according to cost of pairing each resource with each expenditure and subject to limit on number of resources feeding into each expenditure and/or limit on number of expenditures to which each resource allocated. One cell performs several analog and digital functions. Potential applications include assignment of jobs, scheduling, dispatching, and planning of military maneuvers.

Eberhardt, Silvio P.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗