Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Roadmap to Automated Mobility Systems: Informing the Planning of a Sustainable, Resilient Transportation Ecosystem for Dallas/Fort Worth International Airport

The National Renewable Energy Laboratory (NREL) developed this report to provide Dallas/Fort Worth International Airport (DFW) assistance toward a vision that considers the maturation and proliferation of mobility automation, electrification, and infrastructure integrated with Internet of Things (IoT) technologies as they present themselves on the path to 2035. In planning ongoing infrastructure investments, DFW has goals to accommodate and leverage these enabling technologies toward greater sustainability and enhanced traveler and employee experiences, ensuring that infrastructure investments are fully utilized into the future. The objective of this document is to assist DFW to anticipate and envision future airport access by travelers, employees, and goods by examining existing needs and exploring opportunities enabled by technology that informs longer-term infrastructure planning. The vast infrastructure of DFW, which includes buildings, roadways, and other physical structures, as well as growing digital and energy network infrastructures, requires long-term planning and strategy to fully leverage technology advancement and avoid abandoning assets due to functional obsolescence.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures - Nevada National Security Site, Nevada with ROTC 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 572 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: CAS 25-33-01, Building 3220, Equipment Building; CAS 25-33-02, Building 3230, Motor Drive Building; CAS 25-33-03, Building 3231, Pump House; CAS 25-33-04, Building 3232, Cryogenic Evaluation Lab; CAS 25-99-22, Ancillary Facilities. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 572. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 572 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation (CAI) will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If it is determined that complete clean closure cannot be accomplished during the CAI, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Framework for Greenhouse Gas Emissions Reduction Planning: Building Portfolios

The goal of this framework for greenhouse gas (GHG) emissions reduction planning (ERP) is to provide guidance to organizations seeking to reduce GHG emissions for their building portfolios and vehicle fleets. The process described in this framework helps organizations develop an actionable plan that prioritizes emissions reduction measures, identifies solutions, and lays out a phased pathway to achieve deep emissions reductions. The plan aims to result in the achievement of Scope 1 and 2 GHG emissions reduction targets, in alignment with goals set within the U.S. Department of Energy’s (DOE’s) Better Climate Challenge, as well as longer term emissions reduction goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The use of price-based demand response as a resource in electricity system planning

Utilities have conducted IRP for decades to consider both supply- and demand-side resources to meet bulk power system needs. More recently, an increasing number of states are requiring regulated utilities to file plans that identify distribution system needs, including DERs that can avoid or defer certain types of traditional utility investments cost-effectively. Price-based demand response (DR) is an underutilized resource that could substantially contribute to load flexibility. We find that evaluation of price-based DR as a solution to meet identified electricity system needs is uncommon at both planning processes. Where price-based DR is considered as a solution, methodologies are often deficient in the characterization and treatment of this resource. Based on our analysis of utility filings and state requirements, this brief provides recommendations for improving consideration of price-based DR in the context of long-term planning for bulk power and distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Greenhouse Gas Emissions Reduction Planning: Industrial Portfolios

The Framework for Greenhouse Gas Emissions Reduction Planning: Industrial Portfolios articulates a process to help industrial organizations develop a specific, actionable plan to achieve Scope 1 and Scope 2 greenhouse gas (GHG) emissions reduction – an Emissions Reduction Plan (ERP). An ERP covers an entire portfolio of facilities, yet contains enough detail to be practically useful at the facility level.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Resilience and Long-Term Planning in Power and Water Systems in the United States

There is recognition among power and water utilities that the frequency and magnitude of high consequence and low probability events could increase as a result of climate change. The interconnected nature of energy-water systems raises the possibility of cascading failures, increasing complexity and risks. Resilience and long-term planning are important ways of weathering the effects of climate change. First, to understand more about resilience, we reviewed existing literature on resilience definitions, metrics, and modeling, focusing on integrated water-power systems. Second, to understand how resilience and planning are being applied in practice, we interviewed utilities and organized, curated, and synthesized the interview data to arrive at several key findings, which are presented here. We found that there is not a consistent definition for resilience, yet it is something that utilities regularly plan for, often with different names and varying methods/measures. However, there is a tangible shift in the industry towards defining and determining measurable resilience metrics. While the exact metrics are a work in progress, utilities are taking steps forward by (1) putting people and culture at the center of resilience, (2) recognizing their own interdependencies, and (3) pursuing better cross-sector collaboration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Framework for Greenhouse Gas Emissions Reduction Planning: Building Portfolios

The goal of this Framework for greenhouse gas (GHG) emissions reduction planning (ERP) is to provide guidance to organizations seeking to reduce GHG emissions for their building portfolios and vehicle fleets. The process described in this framework helps organizations develop an actionable plan that prioritizes emissions reduction measures, identifies solutions, and lays out a phased pathway to achieve deep emissions reductions The plan aims to result in the achievement of Scope 1 and 2 GHG emissions reduction targets, in alignment with goals set within the U.S. Department of Energy’s (DOE’s) Better Climate Challenge, as well as longer term emissions reduction goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

A Decision Support Tool for Planning Neighborhood-Scale Deployment of Low-Speed Shared Automated Shuttles

Increasing interest and investment in connected, automated, and electric vehicles, and mobility-as-a-service concepts are paving the way for the next major shift in transportation through automated and shared mobility. The initial excitement towards rapid deployment and adoption of automated vehicles has subsided, and low-speed automated shuttles are emerging as a more pragmatic pathway for introducing automated mobility in geo-fenced districts. Such shuttles hold the promise to provide a viable alternative for serving short trips in urban districts with high travel densities. As interest in low-speed automated shuttle systems (to improve urban mobility) increases, the need for tools that can inform communities regarding benefits or dis-benefits of automated shuttle deployments is imminent. However, most of the existing transportation planning and simulation tools are not capable of handling emerging shared automated mobility options. This presentation presents a microscopic simulation toolkit that can be used by cities and communities to plan for the deployment of low-speed automated shuttles systems, as well as other shared mobility options. Labeled as the Automated Mobility District (AMD) modeling and simulation toolkit, the proposed decision support tool can help cities evaluate the mobility and sustainability impacts of deploying shared automated vehicles in geofenced regions. This paper presents a description of the toolkit, as well as a sample scenario analysis for the deployment of low-speed automated shuttles in Greenville, South Carolina. Results from the scenario study demonstrate the effectiveness of the proposed simulation toolkit in planning for advanced mobility systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Master Planning: Identifying Framing Constraints that Scope Your Technology Options

This paper addresses the framing constraints for building and community energy projects that must be considered when energy master planning (EMP) is conducted. The constraints cover emissions, sustainability, resilience, regulations and directives, and regional and local limitations such as available energy types, local conditions, and project requirements. The paper reflects development results from participants in an International Energy Agency project on energy master planning and in a U.S. Department of Defense project on technology integration to achieve resilient, low-energy use military installations. It identifies a comprehensive list of framing constraints categorized into locational threats, locational resources, energy and water distribution and storage systems, building and facility, indoor environmental, and equipment in buildings and district systems constraints. In addition, it identifies limits for these constraints that exist in seven participating countries. Some framing constraints can profoundly impact technology selection while others impact the installation of technologies (as in hardening) and have little to no impact on technology selection. Furthermore, framing constraints can be assessed in different ways and there are resources available to help EMP stakeholders evaluate them. Finally, a case is made that identifying and applying framing constraints early in EMP can bring efficiencies and better focus to the EMP process. We come to the conclusion that (1) for holistic energy planning, it is essential to identify and assess the framing constraints that bound an optimized EMP solution, (2) framing constraints limits should be evaluated as either hard or soft or promising technologies may fall out of an EMP analysis, (3) to maintain consistent quality in the EMP process, the identification of framing constraints and their limits, and perhaps their evaluation, should be standardized, (4) a standardized approach could establish a baseline that can be used, built upon, and improved, (5) as automated EMP tools are improved or developed, the resources in this paper could possibly contribute to their interworkings relative to technology screening, and (6) continued climate change and resulting aggressive goal setting will likely drive a continued and strong emphasis on EMP.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2021 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. This FY 2021 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. The SSP was developed according to the narrative requirements from the “FY 2021 DOE Site Sustainability Plan Guidance” document issued in August 2020. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move INL toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into the INL Annual Laboratory Plan Fiscal Year 2020 (INL/LTD-20-59747), and operations and acquisition systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flexible Plant Operation and Generation Technical Program Plan for FY2023

This report presents the Technical Program Plan for Fiscal Years 2023-2027 (FY2023 to FY2027) for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program—Flexible Plant Operation and Generation Research Pathway. The objective of this pathway is to carry out the research needed to help nuclear power plants diversify revenue generation for the life of these plants. The purpose of these research and development activities is two fold: (1) to reduce the technical and economic risks of implementing FPOG applications and (2) to provide guidance on relevant safety and environmental operating license reviews, amendments, and renewals. This pathway provides a clear understanding of the benefits of nuclear energy beyond electricity markets. A detailed description of the research and development activities that have been completed and that are planned for FY2023—FY2027 are presented in this report. These activities include completing the development of analysis tools to perform technical and economic assessments of realistic market opportunities for producing secondary energy products near nuclear power plants. They also include developing and demonstrating engineering systems and control concepts to dispatch thermal and electrical power to an industrial user. Additionally, this plan includes developing guidance for addressing potential regulatory and licensing requirements. In addition, the formation, purpose, and activities of a group referred to as the Hydrogen Regulatory Research and Review Group is discussed. An overview is also provided on the potential benefits of the Infrastructure Investment and Jobs Act (IIJA) Bill that will support the commencement of Regional Clean Hydrogen Hubs, and the Inflation Reduction Act (IRA) that provides compelling production tax credits for nuclear electricity and clean hydrogen using nuclear energy.

08 HYDROGEN↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AFC Metallic Fuel Research and Development 5-Year Plan

The mission of the U.S. Department of Energy (DOE) Advanced Fuel Campaign (AFC) program is conducting R&D on nuclear fuel technology that enables near- and long-term implementation of the reactor systems necessary to meet national nuclear energy objectives. Its primary goals align with goals of the DOE Office of Nuclear Energy in sustaining the current LWR fleet through Accident Tolerant Fuels program and Enabling Advanced Reactors. The latter goal is to be achieved through the following subgoals in order of logistical priority: • Establish the qualification basis for reference metallic fuel designs for sodium-cooled fast reactors. • Develop next generation metallic fuel fabrication and design for improved fissile utilization and management. • Develop accelerated fuel development and qualification methodologies. • Identify next generation fuel technologies. The purpose of this document is to serve as a five-year research and development (R&D) plan to achieve the goals identified to support enabling advanced reactor deployment related to metallic fuels starting in 2025. The specific objectives of this document are to: • align program R&D work across technical areas, national laboratories, and with stakeholder interests, and • aid yearly and outyear scope and budgetary planning activities. This plan lays the foundation of databases, capabilities, expertise, and research-commercial-regulatory integration for launching next-generation initiatives in advanced fuel technologies (fuel and cladding) and improved methodologies for achieving accelerated qualification of next generation fuel technologies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Supercharging Your ZEV Transition: Using the ZEV Ready Planning Process

The ZEV Ready Framework is a step-by-step planning process for federal fleet electrification. The planning phase covers team coordination, training, policies, financial planning, and identifying candidates for zero-emission vehicles and electric vehicle supply equipment.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Equity-driven Planning of Distributed Solar PV using Optimal Transport

Typically, distribution system planning processes do not explicitly incorporate energy equity considerations, such as identifying consumers most affected by energy costs and determining how investments in the distribution system can address existing energy burden imbalances. This paper proposes a novel optimal transport (OT)-based method to improve the energy burden distribution of consumers. The approach involves the strategic siting and sizing of solar PV in order to assist customers with high energy burden and improve the overall energy burden distribution of the community. The desired energy burden distribution is defined using the equal distribution equivalent (EDE) concept. The OT-based method is then used to estimate the distributed solar PV capacity to be installed at various locations and the tariffs to be adjusted, all while improving the energy burden distribution and providing valuable insights into distributed generation (DG) planning. The results on IEEE 37 bus test system demonstrate how DG planning, considering EDE and OT, can help reduce the energy burden of low-income consumers. Additionally, the approach also reveals optimal tariff adjustments needed to ensure revenue neutrality for distribution utilities.

Optimal transport, equal distribution equivalent, ↗