Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Integration of the Shuttle RMS/CBM Positioning Virtual Environment Simulation

Constructing the International Space Station, or other structures, in space presents a number of problems. In particular, payload restrictions for the Space Shuttle and other launch mechanisms prohibit assembly of large space-based structures on Earth. Instead, a number of smaller modules must be boosted into orbit separately and then assembled to form the final structure. The assembly process is difficult, as docking interfaces such as Common Berthing Mechanisms (CBMS) must be precisely positioned relative to each other to be within the "capture envelope" (approximately +/- 1 inch and +/- 0.3 degrees from the nominal position) and attach properly. In the case of the Space Station, the docking mechanisms are to be positioned robotically by an astronaut using the 55-foot-long Remote Manipulator System (RMS) robot arm. Unfortunately, direct visual or video observation of the placement process is difficult or impossible in many scenarios. One method that has been tested for aligning the CBMs uses a boresighted camera mounted on one CBM to view a standard target on the opposing CBM. While this method might be sufficient to achieve proper positioning with considerable effort, it does not provide a high level of confidence that the mechanisms have been placed within capture range of each other. It also does nothing to address the risk of inadvertent contact between the CBMS, which could result in RMS control software errors. In general, constraining the operator to a single viewpoint with few, if any, depth cues makes the task much more difficult than it would be if the target could be viewed in three-dimensional space from various viewpoints. The actual work area could be viewed by an astronaut during EVA; however, it would be extremely impractical to have an astronaut control the RMS while spacewalking. On the other hand, a view of the RMS and CBMs to be positioned in a virtual environment aboard the Space Shuttle orbiter or Space Station could provide similar benefits more safely and conveniently with little additional cost. In order to render and view the RMS and CBMs in a virtual world, the position and orientation of the end effector in three-dimensional space must be known with a high degree of accuracy. A precision video alignment sensor has been developed which can determine the position and orientation of the controlled element relative to the target CBM within approximately one-sixteenth inch and 0.07 angular degrees. Such a sensor could replace or augment the boresighted camera mentioned above. The computer system used to render the virtual world and the position tracking systems which might be used to monitor the user's movements (in order to adjust the viewpoint in virtual space) are small enough to carry to orbit. Thus, such a system would be feasible for use in constructing structures in space.

Dumas, Joseph D.↗

The Passive Optical Sample Assembly (POSA): I Experiment: First Flight Results and Conclusions

The Passive Optical Sample Assembly-I (POSA-I), part of the Mir Environmental Effects Payload (MEEP), was designed to study the combined effects of contamination, atomic oxygen, ultraviolet radiation, vacuum, thermal cycling, and other constituents of the space environment on spacecraft materials. The MEEP program is a Phase 1 International Space Station Risk Mitigation Experiment. SSP 30258 "Thermal Control Architectural Control Document", section 3.1.2 requires that International Space Station (ISS) external materials meet performance requirements when exposed to the external environment as defined in SSP 30426, "Space Station External Contamination Control Requirements." Contamination control documents call for less than 3 x 10(exp -7) gm/sq cm/yr of molecular contamination on a surface at 300 K at the Prime Measurement Points during quiescent periods and less than 1 x 10(exp-6) gm/sq cm/yr during non-quiescent periods. Assuming a density of 1.0 g/cu cm for the contaminant, this is roughly equivalent to 30-100 A per year. A previous Mir flight experiment (Guillaumon et al. 1991) measured 321-716 A per year. Were this to happen on ISS, the radiators would reach end-of-life properties much sooner than the planned 10 years. Therefore, POSA was proposed to expose ISS-baselined materials (such as Z93 white thermal control paint and chromic acid anodized aluminum) to the Mir environment and determine not only the level of contamination from an orbiting, active space station but also the effect of contamination on thermal optical properties. POSA-I consisted of nearly 400 samples of various candidate materials for ISS. Paint samples flown included Z-93 and YB-71 white thermal control paints and a new inorganic bright yellow paint htat can be utilized for astronaut visual aids.

Zwiener, James M.↗

SOHO Payload Mate to Atlas/Centaur at the SAEF 2

The footage shows the Solar and Heliospheric Observatory's (SOHO) payload mating with the Atlas Centaur launch vehicle in the Spacecraft Assembly and Encapsulation Facility (SAEF-2).

Source record↗

Further Investigations of the Passive Optical Sample Assembly (POSA) - I Flight Experiment

The Passive Optical Sample Assembly-I (POSA-I), part of the Mir Environmental Effects Payload (MEEP), was designed to study the combined effects of contamination, atomic oxygen, ultraviolet radiation, vacuum, then-nal cycling, and other constituents of the space environment on spacecraft materials. The MEEP program is a Phase I International Space Station Risk Mitigation Experiment. Candidate materials for the International Space Station (ISS) were exposed in a specially designed "suitcase" carrier, with identical specimens facing either Mir or space. The payload was attached by EVA to the exterior of the Mir docking module during the STS-76 mission (f'ig. 1). It was removed during the STS-86 mission after an 18-month exposure. During the mission, it received approximately 7 x 1019 atoMS/CM2 atomic oxygen, as calculated by polymer mass loss, and 413 ESH of solar ultraviolet radiation on the Mir-facing side. The side facing away from Mir received significant contaminant deposition, so atomic oxygen fluence has not been reliably determined. The side facing away from Mir received 571 ESH of solar UV. Contamination was observed on both the Mir-facing and space-facing sides of the POSA-I experiment , with a greater amount of deposition on the space facing side than the Mir side. The contamination has been determined to be outgassed silicone photofixed by ultraviolet radiation and converted to silicate by atomic oxygen interaction. Electron spectroscopy for chemical analysis (ESCA) with depth profiling indicated the presence of 26 - 31 nm silicate on the Mir-facing side and 500 - 1000 nm silicate on the space-facing side. The depth profiling also showed that the contaminant layer was uniform, with a small amount of carbon present on the surface and trace amounts of nitrogen, phosphorus, sulfur, and tin. The surface carbon layer is likely due to post-flight exposure in the laboratory and is similar to carbonaceous deposits on control samples. EDAX and FTIR analysis concurred with ESCA for the presence of silicon, oxygen, and carbon. Nearly 400 samples were exposed on POSA-I, which included materials such as thermal control coatings polymeric films, optical materials, and multi-layer insulation blankets. A previous paper discussed the effects of the space environment exposure and contaminant deposition on candidate materials for ISS, including Z93P inorganic thermal control coating, various anodizes, and multi-layer insulation blankets. This paper details the investigation of environmental effects on the remainder of POSA-I samples, particularly the innovative conductive thermal control coatings developed by AZ Technology of Huntsville, AL and HT Research Institute of Chicago, IL. The silicone/silicate contamination had a significant impact on the solar absorptance of white inorganic thermal control coatings on the space-facing side of POSA-I. The effect of contamination on electrical conductivity is discussed. Samples of conductive anodized aluminum developed by Boundary Technologies of Buffalo Grove, IL were also exposed on POSA-I. The effects of the space environment and contaminant deposition on the optical and electrical properties of the conductive anodized aluminum are discussed.

Finckenor, Miria M.↗

Demonstration/Validation of Environmentally-Preferable Coatings for Launch Facilities

Kennedy Space Center (KSC) is responsible for a number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. Applied coating systems work via a variety of methods (barrier, galvanic and/or inhibitor) and adhere to the substrate through a combination of chemical and physical bonds. Maintenance at KSC and other NASA Centers is governed by NASA-STD-50088 (Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment) which establishes practices for the protective coating of ground support equipment and related facilities used by or for NASA programs and projects. The Standard is for the design of non-flight hardware used to support the operations of receiving, transportation, handling, assembly, inspection, test, checkout, service, and launch of space vehicles and payloads at NASA launch, landing, or retrieval sites. These criteria and practices contained within the Standard may be used for items used at the manufacturing, development, and test sites upstream of the launch, landing, or retrieval sites. The objective of this effort is to demonstrate and validate environmentally-preferable alternatives in accordance with NASA-STD-50088 and KSC requirements which can then be added to the Approved Products List. This Test Protocol contains the critical requirements and tests necessary to qualify alternatives for structural steel applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of KSC participants. A Test Report will document the results of the testing as well as any test modifications made during the execution of the testing. Users of this Test Protocol should check the project's Test Report for additional test details or minor modifications that may have been necessary in the execution of the testing. The technical stakeholders will have agreed upon test procedures modifications documented in the Test Report.

Lewis, Pattie↗

Micro-ion Traps for Detection of (Pre)-Biotic Organic Compounds on Comets

Comets are currently believed to be a mixture of interstellar and nebular material. Many of the volatiles in comets are attributed to interstellar chemistry, because the same species of carbonaceous compounds are also observed in ices in interstellar molecular (ISM) clouds. Comets are thus likely to be a relatively pristine reservoir of primitive material and carbonaceous compounds in our solar system. They could be a major contributor to the delivery of prebiotic organic compounds, from which life emerged through impacts on early Earth. Mass spectrometers are very powerful tools to identify unknown chemicals, and much progress bas been made in miniaturizing mas spectrometers for space applications. Most miniatu rized mass spectrometers developed to date, however, are still relatively large, power hungry, complicated to assemble, and would have significant impact on space flight vehicle total payload and resource allocations.

vanAmerom, Friso H. W.↗

Development of the Large Aperture Reflector/Boom Assembly for the SMAP Spacecraft

The Jet Propulsion Laboratory's (JPL) Soil Moisture Active/Passive (SMAP) mission is to measure and monitor global soil moisture dynamics and freeze/thaw states. The rotating Reflector and Boom Assembly (RBA) on SMAP presents significant design and development challenges. The payload configuration utilizes a common Radiometer and Radar feedhorn and a 6-meter deployable mesh reflector all spinning at 14.6 rpm. The evolution of the RBA system solution, development of the mass properties management approach and RBA dynamics are discussed.

Earth observation mission↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗

IXPE Mission System Concept and Development Status

The Goal of the Imaging X-Ray Polarimetry Explorer (IXPE) Mi SMEX), is to expand understanding of high-energy astrophysical processes and sources, in support of NASA’s first science objective in Astrophysics: “Discover how the universe works.” IXPE, an international collaboration, will conduct X-ray imaging polarimetry for multiple categories of cosmic X-ray sources such as neutron stars, stellar-mass black holes, supernova remnants and active galactic nuclei. The Observatory uses a single science operational mode capturing the X-ray data from the targets. The IXPE Observatory consists of spacecraft and payload modules built up in parallel to form the Observatory during system integration and test. The payload includes three X-ray telescopes each consisting of a polarization-sensitive, gas pixel X-ray detector, paired with its corresponding grazing incidence mirror module assembly (MMA). A deployable boom provides the correct separation (focal length) between the detector units (DU) and MMAs. These payload elements are supported by the IXPE spacecraft which is derived from the BCP-small spacecraft architecture. This paper summarizes the IXPE mission science objectives, updates the Observatory implementation concept including the payload and spacecraft ts and summarizes the mission status since last year’s conference.

Deininger, William D.↗

Modular space structures

The Extendable Tetrahedral Truss orbiting antenna concept, comprising the use of prefabricated, automatically deployable lattice structures and their subsequent assembly into larger structures suitable for microwave antenna use, is described. It is assumed that the Space Shuttle Orbiter payload bay will be able to accommodate only modular portions of the structural system required, and that the Space Shuttle crew will furnish the manual labor entailed by orbital assembly. It is concluded that a deployable beam module system may be a more elegant design solution than the alternative triangular-module system.

Vaughan, D. H.↗

STS-82 Flight Day 08 Highlights

The eighth day of the STS-82 mission begins with the crew, Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley performing the final spacewalk of the mission. Lee and Smith attach several thermal insulation blankets to three equipment compartments at the top of the Support Systems Module section of Hubble which contain key data processing, electronics and scientific instrument telemetry packages. Following the completion of that work, Lee and Smith briefly return to the airlock while flight controllers evaluated a possible glitch with one of four Reaction Wheel Assembly units in Hubble used to maneuver the telescope for its scientific observations. A spare Reaction Wheel Assembly was available aboard Discovery for a swap out during an additional spacewalk had it been necessary, but a few hours later, after further analysis, payload controllers reported that the Reaction Wheel Assembly was in excellent shape and operating at the proper speed.

Source record↗

Design of Space Systems to Enable In-space Assembly and Servicing

For several decades, NASA has employed in-space systems to enhance the performance and extend the useful life of operational orbital assets. In at least one case, an operational mission was not only enhanced, but enabled – the International Space Station was made possible by crewed and robotic in-space assembly, and continues to support installation and operation of new science and technology payloads. In several cases (Hubble Space Telescope, Intelsat 401, Westar and Palapa), major operational assets were rescued or repaired soon after launch when otherwise mission-ending anomalies occurred or were detected. In addition to the original rescue, Hubble was upgraded four times, enabling high-demand, world class science over four decades. More recently, two Northrop Grumman Mission Extension Vehicles have captured two Intelsat spacecraft near the end of their life and fuel capacity, to take over maneuvering duties. In spite of these recent operational achievements, and with the exception of large human exploration vehicles and large space telescopes, space architects rarely consider in-orbit servicing and assembly capabilities in their future planning. Technologies such as multi-launch mission architectures (and rendezvous and proximity operations systems), docking systems, external robotics, advanced tools, modular systems and structures, and fluid transfer systems are available today to support these missions. In-space manufacturing will soon be operational to enable resilient missions that recover from on-orbit failures, and expand the utilization of space. We envision a future that includes these capabilities, and discuss the cultural, engineering, and technological challenges to achieving this vision. We discuss the vision, the proverbial chicken and the egg (which came first, the serviceable spacecraft or the servicer?), the cost, risk, and perceptions thereof of in-space operations, a “spectrum” of cooperative servicing design considerations, and the current status of the space industry’s slow but steady march to widespread operational use of on-orbit servicing, assembly, and manufacturing.

Bo Naasz↗

Study of power management technology for orbital multi-100KWe applications. Volume 3: Requirements

Mid to late 1980's power management technology needs to support development of a general purpose space platform, capable of suplying 100 to 250 KWe to a variety of users in low Earth orbit are examined. A typical, shuttle assembled and supplied space platform is illustred, along with a group of payloads which might reasonably be expected to use such a facility. Examination of platform and user power needs yields a set of power requirements used to evaluate power management options for life cycle cost effectivness. The most cost effective ac/dc and dc systems are evaluated, specifically to develop system details which lead to technology goals, including: array and transmission voltages, best frequency for ac power transmission, and advantages and disadvantages of ac and dc systems for this application. System and component requirements are compared with the state-of-the-art to identify areas where technological development is required.

Mildice, J. W.↗

Power management for multi-100 KWe space systems

This paper examines mid to late 1980s power management technology needs to support development of a general-purpose space platform, capable of supplying 100 to 250 KWe to a variety of users in LEO. To that end, a typical Shuttle-assembled and supplied space platform is described, along with a group of payloads which might reasonably be expected to use such a facility. Examination of platform and user power needs yields a set of power system requirements used to evaluate power management options for life cycle cost effectiveness. The most cost-effective AC/DC and DC systems are evaluated, specifically to develop system details which lead to technology goals including array and transmission voltage, best frequency for AC power transmission, and advantages and disadvantages of AC and DC systems for this application. Finally, system and component requirements are compared with the state of the art to identify areas where technology development is required.

Mildice, J. W.↗

Orbiter Camera Payload System

Components for an orbiting camera payload system (OCPS) include the large format camera (LFC), a gas supply assembly, and ground test, handling, and calibration hardware. The LFC, a high resolution large format photogrammetric camera for use in the cargo bay of the space transport system, is also adaptable to use on an RB-57 aircraft or on a free flyer satellite. Carrying 4000 feet of film, the LFC is usable over the visible to near IR, at V/h rates of from 11 to 41 milliradians per second, overlap of 10, 60, 70 or 80 percent and exposure times of from 4 to 32 milliseconds. With a 12 inch focal length it produces a 9 by 18 inch format (long dimension in line of flight) with full format low contrast resolution of 88 lines per millimeter (AWAR), full format distortion of less than 14 microns and a complement of 45 Reseau marks and 12 fiducial marks. Weight of the OCPS as supplied, fully loaded is 944 pounds and power dissipation is 273 watts average when in operation, 95 watts in standby. The LFC contains an internal exposure sensor, or will respond to external command. It is able to photograph starfields for inflight calibration upon command.

Source record↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗