Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Water Microgrids: A Primer for Facility Managers

A water microgrid is similar in concept to an energy microgrid, which the U.S. Department of Energy defines as “a local energy grid with control capability, which means it can disconnect from the traditional grid and operate autonomously.” Similarly, a water microgrid is a local water system that supplies, treats, and distributes water, with the primary objective to meet mission critical water demands during a disruption of the primary supply. A water microgrid has the capability to operate independently of an existing primary water system and includes a layer of sensing capability that provides the necessary monitoring and controls to operate the water microgrid. A water microgrid may offer a viable solution for a site to address resilience gaps identified through the resilience planning process. For example, a site may not have adequate and redundant water supply to meet mission critical demands with vulnerabilities in the operating systems. A water microgrid provides the ability to island the water system from the primary water supply to satisfy water demand requirements throughout an outage or disruption.

42 ENGINEERING↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Benchmark Accelerated Aging of Harvested Hypalon/Epr and Cspe/Xlpe Power and I&C Cable in Nuclear Power Plants

As part of the Light Water Reactor and Sustainability (LWRS) program in the U.S. Department of Energy (DOE) Office of Nuclear Energy, material aging and degradation research is currently geared to support the long-term operation of existing nuclear power plants (NPPs) as they move beyond their initial 40 year licenses. The goal of this research is to provide information so that NPPs can develop aging management programs (AMPs) to address replacement and monitoring needs as they look to operate for 20 years, and in some cases 40 years, beyond their initial operating lifetimes. For cable insulation and jacket materials that support instrument, control, and safety systems, accelerated aging data are needed to determine priorities in cable aging management programs. Before accelerated thermal and radiation aging of harvested, representative cable insulation and jacket materials, the benchmark performance of a new test capability at Oak Ridge National Laboratory (ORNL) was evaluated for temperatures between 70 and 135°C, dose rates between 100 and 500 Gy/h, and accumulated doses up to 20 kGy, Samples that were characterized and are representative of current materials in use were harvested from the Callaway NPP near Fulton, Missouri, and the San Onofre NPP north of San Diego, California. From the Callaway NPP, a multiconductor control rod cable manufactured by Boston Insulated Wire (BIW), with a Hypalon/ chorolosulfonated polyethylene (CSPE) jacket and ethylene-propylene rubber (EPR) insulation, was harvested from the auxiliary space during a planned outage in 2013. This cable was placed into service when the plant was started in 1984. From the San Onofre NPP, a Rockbestos Firewall III (FRIII) cable with a Hypalon/ CSPE jacket with cross-linked polyethylene (XLPE) insulation was harvested from an on-site, climate-controlled storage area. This conductor, which was never placed into service, was procured around 2007 in anticipation of future operation that did not occur. Benchmark aging for both jacket and insulation material was carried out in air at a temperature of 125°C or in uniform 140 Gy/h gamma irradiation over a period of 60 days. Their mechanical properties over the course of their exposures were compared with reference data from comparable cable jacket/insulation compositions and aging conditions. For both accelerated thermal and radiation aging, it was observed that the mechanical properties for the Callaway BIW control rod cable were consistent with those previously measured. However, for the San Onofre Rockbestos FRIII, there was an observable functional difference for accelerated thermal aging at 125°C. Details on possible sources for this difference and plans for resolving each source are given in this paper.

aging↗

BENCHMARK ACCELERATED AGING OF HARVESTED HYPALON/EPR AND CSPE/XLPE POWER AND I&C CABLE IN NUCLEAR POWER PLANTS

As part of the Light Water Reactor and Sustainability (LWRS) program in the U.S. Department of Energy (DOE) Office of Nuclear Energy, material aging and degradation research is currently geared to support the long-term operation of existing nuclear power plants (NPPs) as they move beyond their initial 40 year licenses. The goal of this research is to provide information so that NPPs can develop aging management programs (AMPs) to address replacement and monitoring needs as they look to operate for 20 years, and in some cases 40 years, beyond their initial operating lifetimes. For cable insulation and jacket materials that support instrument, control, and safety systems, accelerated aging data are needed to determine priorities in cable aging management programs. Before accelerated thermal and radiation aging of harvested, representative cable insulation and jacket materials, the benchmark performance of a new test capability at Oak Ridge National Laboratory (ORNL) was evaluated for temperatures between 70 and 135 C, dose rates between 100 and 500 Gy/h, and accumulated doses up to 20 kGy, Samples that were characterized and are representative of current materials in use were harvested from the Callaway NPP near Fulton, Missouri, and the San Onofre NPP north of San Diego, California. From the Callaway NPP, a multiconductor control rod cable manufactured by Boston Insulated Wire (BIW), with a Hypalon/ chorolosulfonated polyethylene (CSPE) jacket and ethylene-propylene rubber (EPR) insulation, was harvested from the auxiliary space during a planned outage in 2013. This cable was placed into service when the plant was started in 1984. From the San Onofre NPP, a Rockbestos Firewall III (FRIII) cable with a Hypalon/ CSPE jacket with cross-linked polyethylene (XLPE) insulation was harvested from an on-site, climate-controlled storage area. This conductor, which was never placed into service, was procured around 2007 in anticipation of future operation that did not occur. Benchmark aging for both jacket and insulation material was carried out in air at a temperature of 125 C or in uniform 140 Gy/h gamma irradiation over a period of 60 days. Their mechanical properties over the course of their exposures were compared with reference data from comparable cable jacket/insulation compositions and aging conditions. For both accelerated thermal and radiation aging, it was observed that the mechanical properties for the Callaway BIW control rod cable were consistent with those previously measured. However, for the San Onofre Rockbestos FRIII, there was an observable functional difference for accelerated thermal aging at 125 C. Details on possible sources for this difference and plans for resolving each source are given in this paper.

Duckworth, Robert C↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

A Framework to Design Consumer-Centric Operational Strategies for Resilience Enhancement

Extreme temperature-related events like heat waves or cold snaps can significantly stress the power distribution grid as electricity demand spikes leading to brownouts or blackouts if not managed properly. In addition, such extreme events can exacerbate inequity, with vulnerable populations (for example, houses with poor insulation, located in non-critical zones, and lack of local resources) at greater risk. There is a growing deployment of distribution systems automation technologies such as advanced metering infrastructure, sensors, and automated control systems to enhance the visibility of the entire distribution grid while meeting resilience objectives. Here, this paper proposes a framework for investigating how automation can improve the distribution system's resilience and ensure customers' health and safety during such extremes. The proposed framework's efficacy will be demonstrated for the Electricity Reliability Council of Texas (ERCOT) during winter storm Uri with varying levels of distribution automation technologies such as feeder isolation using smart switches, remote outage signals using advanced meters, and comfort-aware outage using advanced analytics and communication. Simulation results show that an outage strategy involving advanced grid technology and communication can reduce the occupant exposure to severe cold by 93% and, simultaneously, reduce expected energy not served by 73.2% when compared against feeder isolation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Framework for Real-Time All-Hazards Global Situational Awareness

Information systems play a pivotal role in emergency response by making consequence analysis models based on up-to-date data available to decision makers. While consequence analysis models have been used for years on local scales, their application on national and global scales has been constrained by lack of non-proprietary data. This chapter describes how this has changed using a framework for real-time all-hazards situational awareness called the Energy Awareness and Resiliency Standardized Services (EARSS) as an example. EARSS is a system of systems developed to collect non-proprietary data from diverse open content sources to develop a geodatabase of critical infrastructures all over the world. The EARSS system shows that it is feasible to provide global disaster alerts by producing valuable information such as texting messages about detected hazards, emailing reports about affected areas, estimating an expected number of impacted people and their demographic characteristics, identifying critical infrastructures that may be affected, and analyzing potential downstream effects. This information is provided in real-time to federal agencies and subscribers all over the world for decision making in humanitarian assistance and emergency response. The system also uses live streams of power outages, weather, and satellite surveillance data as events unfold. This, in turn, is combined with other public domain or open content information, such as media reports and postings on social networking websites, for complete coverage of the situation as events unfold. Working with up-to-date information from the EARSS system, emergency responders on the ground could pre-position their staff and resources, such as emergency generators and ice, where they are most needed.

disaster consequence management↗

Net-Zero Carbon Microgrids

The microgrid concept has been effective in creating aggregations of distributed energy resources—generation, storage and loads—for resiliency, in the form of energy security. The success of microgrids in bringing energy security to a wide range of customers—from individual residences to commercial and industrial installations to military bases—has been exemplified during power disruptions and extended outages due to extreme weather events, cybersecurity attacks, and equipment failures. Now microgrids have an opportunity to meet the challenges of climate change and contribute to a carbon-free power delivery system. The transition to net-zero starts within microgrids themselves. In fact, today’s microgrids are largely dominated by generators using fossil fuels, natural gas and diesel, with high greenhouse gas emissions. In short, the transition to net-zero means replacing fossil fueled generators with renewable generation in microgrids. This transition is extended by including new dispatchable generation technologies that are 100% carbon-free and that offer additional advantage of a more-dependable and sustainable source of energy and power. Basically, the decarbonization of microgrids requires three elements: 1) maximizing generation from renewable energy resources, 2) management of storage and flexible loads to balance the variability and intermittency of renewable energy resources, and 3) introducing new clean power sources, including hydrogen-based generation and small modular reactors. This report affirms a need for specific focus by governmental agencies at national, regional, and local levels to establish technology, policy, and investment in this area. The intention of the Net-Zero Microgrid (NZM) Program is to inform these constituencies with cross-cutting research and tools for the reduction of GHG in microgrids – to net-zero in the near term eventually to zero in the longer term. The NZM Program is committed to achieving decarbonization for resiliency and for providing clean energy at the local or distribution level, from remote communities to underserved communities, and large industrial and military facilities. The NZM Planning and Design Platform is a core tool to be developed as an early deliverable of the NZM Program because only a fully integrated microgrid-design approach will ensure maximum carbon reduction in energy production.

13 HYDRO ENERGY↗

Validating Protection System Behavior with Machine Learning in a Master State Overseer

As power system protection devices continue the widespread transition from analog to digital, they become increasingly intricate. The internal functions and communication between critical grid components must now be significantly more complex to keep up with the demands of the modern smart grid. This brings increased difficulty in maintenance and monitoring, making it harder to identify potential misoperation, power anomalies, and cyber threats. Such issues are often only pinpointed after an exhaustive and costly post-mortem analysis, when a major outage or damage has already occurred. A solution is needed for validating protection systems as they operate, independently evaluating grid state and confirming whether the protection system is behaving accordingly. As opposed to incident response, this acts as a constant verification mechanism that raises a flag when subtler issues are noticed, catching them earlier and preventing larger incidents. This work presents the implementation of such a system, expanding on the prototype developed by the authors in a previous paper. This is accomplished with a machine learning (ML) system capable of validating the performance of protection systems by classifying anomalous events and characterizing protection system responses based solely on available current and voltage measurements. Additionally, this system is contextualized within a larger, modular Master State awareness Overseer (MSO) framework, responsible for monitoring, analyzing, and managing an electric grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Naturalistic Decision Making for Power System Operators

Motivation – Investigations of large-scale outages in the North American interconnected electric system often attribute the causes to three T’s: Trees, Training and Tools. To document and understand the mental processes used by expert operators when making critical decisions, a naturalistic decision making (NDM) model was developed. Transcripts of conversations were analyzed to reveal and assess NDM-based performance criteria. Findings/Design – An item analysis indicated that the operators’ Situation Awareness Levels, mental models, and mental simulations can be mapped at different points in the training scenario. This may identify improved training methods or analytical/ visualization tools. Originality/Value – This study applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message – The NDM approach provides a viable framework for systematic training management to accelerate learning in simulator-based training scenarios for power system operators and teams.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

Probabilistic Economic Valuation of Safety Margin Management

The goal of this project was to explore a new methodology for evaluation of potential safety margin upgrades to add a new instrument to the Risk Informed Safety Margin Characterization (RISMC) toolkit. To this end, the RAVEN code developed by the Idaho National Laboratory was used to perform a cost-benefit analysis of several potential power plant safety upgrades to compare the material cost of the upgrades with the probabilistic benefit of avoiding accident scenario consequences to find the most cost-effective safety upgrades. By coupling RAVEN to MELCOR to drive Monte-Carlo method stochastic parameter analysis and using data from existing nuclear codes, as well as MELCOR’s radionuclide relocation tracking capabilities, the radionuclide release source term activity in a severe accident scenario can be estimated. Severe Accident Mitigation upgrades were benchmarked against the Hardened Containment Ventilation upgrade mandated by the USNRC for Mk1 BWRs using dollars spent per Curie of release prevented as a metric by which to evaluate the economic efficacy of the upgrades. Additionally, Fault Tree/Event Tree-based analyses were performed to compare older methods of evaluation to the methodology pioneered in this work, and Monthly Operating Report (MORP) outage data was analyzed for insights into power plant outage optimization and reduction.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AGR-2 Final Data Qualification Report for U.S. Capsules - ATR Cycles 147A Through 154B

This report provides the data qualification status of AGR-2 fuel irradiation experimental data in four U.S. capsules from all 15 Advanced Test Reactor (ATR) Cycles 147A, 148A, 148B, 149A, 149B, 150A, 150B, 151A, 151B, 152A, 152B, 153A, 153B, 154A, and 154B, as recorded in the Nuclear Data Management and Analysis System (NDMAS). Thus, this report covers data qualification status for the entire AGR-2 irradiation and will replace four previously issued AGR-2 data qualification reports (e.g., INL/EXT-11-22798, INL/EXT-12-26184, INL/EXT-13-29701, and INL/EXT-13-30750). During AGR-2 irradiation, two cycles, 152A and 153A, occurred when the ATR core was briefly at low power, so AGR-2 irradiation data are not used for physics and thermal calculations. Also, two cycles, 150A and 153B, are Power Axial Locator Mechanism (PALM) cycles when the ATR power is higher than during normal cycles. During the first PALM cycle, 150A, the experiment was temporarily moved from the B-12 location to the ATR water canal and during the second PALM cycle, 153B, the experiment was temporarily moved from the B-12 location to the I-24 location to avoid being overheated. During the “Outage” cycle, 153A, seven flow meters were installed downstream from seven Fission Product Monitoring System (FPMS) monitors to measure flows from the monitors and these data are included in the NDMAS database.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification - APPS1 Matrix Glasses

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗