Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

NASA Today - Mars Observer Segment (Part 4 of 6)

This videotape consists of eight segments from the NASA Today News program. The first segment is an announcement that there was no date set for the launch of STS-51, which had been postponed due to mechanical problems. The second segment describes the MidDeck Dynamic Experiment Facility. The third segment is about the scheduled arrival of the Mars Observer at Mars, it shows an image of Mars as seen from the approaching Observer spacecraft, and features an animation of the approach to Mars, including the maneuvers that are planned to put the spacecraft in the desired orbit. The fourth segment describes a discovery from an infrared spectrometer that there is nitrogen ice on Pluto. The fifth segment discusses the Aerospace for Kids (ASK) program at the Goddard Space Flight Center (GSFC). The sixth segment is about the high school and college summer internship programs at GSFC. The seventh segment announces a science symposium being held at Johnson Space Center. The last segment describes the National Air and Space Museum and NASA's cooperation with the Smithsonian Institution.

Source record↗

A typical pointed observation in IRAS designed to fit into a 15 minute window

A typical pointed observation in the Infrared Astronomical Satellite (IRAS) was designed to fit into a 15 minute window. Observing constraints, however, did not always permit targets from the scientific program to be observed on exactly 15 minute centers and a few months into the mission it was realized that the automatic scheduling program left times when no observations were being made. In order to use this potentially wasted observing time, a mode of pointed observations, the 'filler' mode, with shorter observation duration was initiated. Locations were picked on an arbitrary grid, spaced relatively uniformly in ecliptic coordinates, and the telescope was pointed to one of these sites whenever a gap potentially occurred. One of us (GXN) was the coordinator of this effort (the FL sub-group). There are a total of 22 FL fields, 13 of which have more than 50 component observations. These 13 fields cover about 30 square degrees. It was proposed to concentrate on one filler field, FL29, a field with 53 coverages which thus had among the deepest coverage of those observed in this mode. This field was also observed extensively at various non-infrared wavelengths by a variety of techniques. Because the IRAS observations of FL29 were made at the limits of the survey sensitivity and at different twist angles it was necessary to make significant technical advances in the methods used in the processing and analyzing the data. In particular, if normal IRAS coaddition procedures were used, the noise resulting from coaddition of the multiple frames did not decrease in the manner expected once significantly different twist angles were included in the coaddition. The technical effort needed to reduce the observations of FL29 was completed and now the noise behavior is understood and well behaved. The reduction of the field FL29 observations is done.

Neugebauer, G.↗

Market-Based Approaches to Managing Science Return from Planetary Missions

A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.

Wessen, Randii R.↗

Knowledge based tools for Hubble Space Telescope planning and scheduling: Constraints and strategies

The Hubble Space Telescope (HST) presents an especially challenging scheduling problem since a year's observing program encompasses tens of thousands of exposures facing numerous coupled constraints. Recent progress in the development of planning and scheduling tools is discussed which augment the existing HST ground system. General methods for representing activities, constraints, and constraint satisfaction, and time segmentation were implemented in a scheduling testbed. The testbed permits planners to evaluate optimal scheduling time intervals, calculate resource usage, and to generate long and medium range plans. Graphical displays of activities, constraints, and plans are an important feature of the system. High-level scheduling strategies using rule based and neural net approaches were implemented.

Miller, Glenn↗

GROWTH on S190510g: DECam Observation Planning and Follow-up of a Distant Binary Neutron Star Merger Candidate

The first two months of the third Advanced LIGO and Virgo observing run (2019 April–May) showed that distant gravitational-wave (GW) events can now be readily detected. Three candidate mergers containing neutron stars (NS) were reported in a span of 15 days, all likely located more than 100 Mpc away. However, distant events such as the three new NS mergers are likely to be coarsely localized, which highlights the importance of facilities and scheduling systems that enable deep observations over hundreds to thousands of square degrees to detect the electromagnetic counterparts. On 2019 May 10 02:59:39.292 UT the GW candidate S190510g was discovered and initially classified as a binary neutron star (BNS) merger with 98% probability. The GW event was localized within an area of 3462 deg2, later refined to 1166 deg2 (90%) at a distance of 227 ± 92 Mpc. We triggered Target-of-Opportunity observations with the Dark Energy Camera (DECam), a wide-field optical imager mounted at the prime focus of the 4 m Blanco Telescope at Cerro Tololo Inter-American Observatory in Chile. This Letter describes our DECam observations and our real-time analysis results, focusing in particular on the design and implementation of the observing strategy. Within 24 hr of the merger time, we observed 65% of the total enclosed probability of the final skymap with an observing efficiency of 94%. We identified and publicly announced 13 candidate counterparts. S190510g was reclassified 1.7 days after the merger, after our observations were completed, with a "BNS merger" probability reduced from 98% to 42% in favor of a "terrestrial classification.

Igor Andreoni↗

Monte Carlo Analysis of the Commissioning Phase Maneuvers of the Soil Moisture Active Passive (SMAP) Mission

The Soil Moisture Active Passive (SMAP) mission will perform soil moisture content and freeze/thaw state observations from a low-Earth orbit. The observatory is scheduled to launch in October 2014 and will perform observations from a near-polar, frozen, and sun-synchronous Science Orbit for a 3-year data collection mission. At launch, the observatory is delivered to an Injection Orbit that is biased below the Science Orbit; the spacecraft will maneuver to the Science Orbit during the mission Commissioning Phase. The delta V needed to maneuver from the Injection Orbit to the Science Orbit is computed statistically via a Monte Carlo simulation; the 99th percentile delta V (delta V99) is carried as a line item in the mission delta V budget. This paper details the simulation and analysis performed to compute this figure and the delta V99 computed per current mission parameters.

Monte Carlo simulations↗

ROSAT investigation of flaring and activity on Prox Cen

The objective of this program was to investigate with high sensitivity the low-level flare activity which may underlie coronal heating. This was done. The ROSAT observations of Prox Cen were scheduled for 50 ks spread out from 26 Feb. - 10 Mar. 1992. Unfortunately because of spacecraft problems many of these pointings turned out to contain no useful data or extremely truncated valid data sets. Considerable time was spent trying to determine which of the data would be scientifically useful and which would not. Fortunately, several developments took place to augment the original data in such a way that the scientific goal of advancing the study of flaring and variability was able to be achieved after all. These are as follows: (1) a second round of ROSAT observations was carried out in Feb. 1993 which only came to the attention of the PI in Apr. 1993 when a new data tape arrived; (2) simultaneous IUE observations were requested and obtained; (3) data from the UK WFC are available via the collaboration with Dr. G. Bromage; and (4) the 'cleaned-up' original data set was found to include one major flare and 2 moderate flares. Because of the problems with the original data set, the unexpected acquisition of new data only two months ago, and the availability of IUE and WFC data, an article on Prox Cen for publication is not ready at this time. Such an article is being developed and can be completed as part of ongoing ROSAT research efforts on stellar coronae and flaring.

Haisch, Bernhard↗

Near-Term Options for a Nuclear Thermal Propulsion Flight Demonstrator

The Appropriations Bill passed by the US Congress in February 2019 instructed NASA to direct “not less than $100,000,000 for the development of nuclear thermal propulsion, of which not less than $70,000,000 shall be for the design of a flight demonstration by 2024 for which a multi-year plan is required by both the House and the Senate within 180 days of enactment of this agreement." As part of NASA’s response to this direction, the Advanced Concepts Office (ACO) at the Marshall Space Flight Center (MSFC) was tasked with leading a study to develop a nuclear thermal propulsion (NTP) flight demonstration (FD) concept and evaluate its feasibility with respect to the near-term schedule goal. During formulation for the NTP FD study, two perspectives emerged with regards to FD concept design. The first seeks to strictly observe the immediate near-term schedule goal, embracing a completely “off-the-shelf,” high-TRL approach to subsystem design and component selection. The downside to this approach is that the propulsion performance to be expected from such a design is significantly lower than what NTP promises for operational systems, and the value of the flight demo is potentially reduced due to a lack of traceability. The second approach advocates for an FD concept that shows increased traceability to the projected designs of operational systems, providing risk reduction for future NTP-enabled missions. This option comes at the cost of schedule and development risks, as it requires some new investments in nuclear reactor fuels and design. In order to understand the implications and differences between these two approaches, the ACO team elected to perform a concept design of each type, labeling the immediate near-term concept Flight Demo 1 (FD1), and the higher traceability concept Flight Demo 2 (FD2). This paper will present a summary of the mission profiles and system designs for both FD1 and FD2, identifying key drivers and challenges for each design.

Edwards, S. J.↗

Soil Moisture Data Assimilation to Estimate Irrigation Water Use

Knowledge of irrigation is essential to support food security, manage depleting water resources, and comprehensively understand the global water and energy cycles. Despite the importance of understanding irrigation, little consistent information exists on the amount of water that is applied for irrigation. In this study, we develop and evaluate a new method to predict daily to seasonal irrigation magnitude using a particle batch smoother data assimilation approach, where land surface model soil moisture is applied in different configurations to understand how characteristics of remotely sensed soil moisture may impact the performance of the method. The study employs a suite of synthetic data assimilation experiments, allowing for systematic diagnosis of known error sources. Assimilation of daily synthetic soil moisture observations with zero noise produces irrigation estimates with a seasonal bias of 0.66% and a correlation of 0.95 relative to a known truth irrigation. When synthetic observations were subjected to an irregular overpass interval and random noise similar to the Soil Moisture Active Passive satellite (0.04 cm(exp 3) cm(exp -3)), irrigation estimates produced a median seasonal bias of <1% and a correlation of 0.69. When systematic biases commensurate with those between NLDAS‐2 land surface models and Soil Moisture Active Passive are imposed, irrigation estimates show larger biases. In this application, the particle batch smoother outperformed the particle filter. The presented framework has the potential to provide new information into irrigation magnitude over spatially continuous domains, yet its broad applicability is contingent upon identifying new method(s) of determining irrigation schedule and correcting biases between observed and simulated soil moisture, as these errors markedly degraded performance.

R Abolafia-Rosenzweig↗

Spitzer Operations: Scheduling the Out Years

Spitzer Warm Mission operations have remained robust and exceptionally efficient since the cryogenic mission ended in mid-2009. The distance to the now exceeds 1 AU, making telecommunications increasingly difficult; however, analysis has shown that two-way communication could be maintained through at least 2017 with minimal loss in observing efficiency. The science program continues to emphasize the characterization of exoplanets, time domain studies, and deep surveys, all of which can impose interesting scheduling constraints. Recent changes have significantly improved on-board data compression, which both enables certain high volume observations and reduces Spitzer's demand for competitive Deep Space Network resources.

Spitzer↗

The feasibility study and evaluation of applying expert system techniques to the mission operations for the AXAF-I spacecraft

Advanced X-ray Astrophysics Facility - Imaging (AXAF-I) is a spacecraft for X-ray emitting sources observation and has been tentatively scheduled for a space shuttle launch in late 1998 at the Kennedy Space Center. Its main objectives are 'to determine the nature of astronomical objects ranging from normal stars to quasars, to understand the nature of the physical processes which take place in and between astronomical objects, and to add to our understanding of the history and evolution of the universe.' The AXAF-I will have an expected five year life time for the science mission phase. During the science mission phase, the monitoring and management operation of the flight and ground systems is personnel intensive, requiring system experts on duty around the clock. The purpose of the expert system presented in this report is intended to reduce the level of expertise, training, and personnel requirement for the mission operation. The telemetry data from the spacecraft can be divided into two categories: the science observation data and the engineering status data. The science data contains the outputs from the X-ray sensing devices and will be forwarded to the AXAF-I Science Center for interpretation; while the engineering status data will be monitored by the Operation Control Center (OCC) for the operation diagnosis of the spacecraft. The expert system is designed to assist the operation controllers at the OCC to perform the daily mission operations. Since there are hundreds of engineering telemetry data points and the interpretation of the telemetry depends on many factors, e.g., sun or eclipse, the monitoring of the AXAF-I is not a trivial task. In this phase of expert system development, the focus has been limited to the engineering data interpretation, i.e., warnings will be provided to the operation controllers to signal any anomaly. The system is hosted in a Silicon Graphics Indigo-2 workstation running the IRIX operating system. The expert system tool used is the G2 system from Gensym (Gensy).

Chang, Kai H.↗

SPRUCE Ground Observations of Phenology in Experimental Plots, 2019

This data set consists of phenological transition dates, as derived from direct observations of vegetative and reproductive phenology recorded by a human observer, from the SPRUCE experiment during 2019, the third full year of whole-ecosystem warming (Hanson et al. 2017). Both spring and autumn phenological events are included. Since April 2016, human observers have been directly tracking the phenology of both woody and herbaceous species on a weekly schedule within the SPRUCE experimental chambers. The observed date report here is the first survey date on which an event/phenophase was definitively observed. The SPRUCE experiment is located within the S1 peat bog at the Marcell Experimental Forest, approximately 40 km north of Grand Rapids in north-central Minnesota, USA. User note: Ground observations of phenology from 2016-2021 are available. See SPRUCE Ground Observations of Phenology in Experimental Plots, 2021 https://doi.org/10.25581/spruce.094/1874936 for the most recent data as well as links to all other ground phenology datasets.

54 ENVIRONMENTAL SCIENCES↗

Should’ve Could’ve: Progress in the Systems Engineering of the Mars2020 On-Board Planner

Mars rover operations has traditionally controlled behavior using meticulously compiled, so-called “Master” sequences that enforce deterministic timing and ordering of activities. While the approach is effective at managing risk and complexity, it can also be inefficient. Extended operations of the Mars2020 rover envisions a fundamentally different scheduling and execution approach. Atomic activities are constrained by mission operators in time, resource usage, and a structure of dependencies. The rover flight software will create and re-create schedules, responding to available energy, data volume, actual activity durations and execution status, observed temperatures, and other on-board state. Schedules are expected to change substantially in the course of execution. The solution space is prohibitively large and probabilistic in nature. A range of emergent behavior is accessible depending on the interaction between actual on-board state and a given formulation of constraints. For years, the specification and implementation of this capability have been considered and refined, as testing and analysis have mapped the contours of the system. Many concepts that could have been adopted were rejected, and in some cases, emergent properties have been exposed and beaten back with approaches to steer the behavior. This paper discusses some of the design history and underlying reasoning in the systems engineering of the first autonomous activity planner on Mars.

Kuhn, Stephen R↗

Going Forward with the Nancy Grace Roman Space Telescope Transient Survey: Validation of Precision Forward-modeling Photometry for Undersampled Imaging

The Nancy Grace Roman Space Telescope (Roman) is an observatory for both wide-field observations and coronagraphy that is scheduled for launch in the mid-2020s. Part of the planned survey is a deep, cadenced field or fields that enable cosmological measurements with type Ia supernovae (SNe Ia). With a pixel scale of 0$_.^"$11, the Wide Field Instrument will be undersampled, presenting a difficulty for precisely subtracting the galaxy light underneath the SNe. We use simulated data to validate the ability of a forward-model code (such codes are frequently also called “scene-modeling” codes) to perform precision supernova photometry for the Roman SN survey. Our simulation includes over 760,000 image cutouts around SNe Ia or host galaxies (~10% of a full-scale survey). To have a realistic 2D distribution of underlying galaxy light, we use the VELA simulated high-resolution images of galaxies. We run each set of cutouts through our forward-modeling code which automatically measures time-dependent SN fluxes. Given our assumed inputs of a perfect model of the instrument point-spread functions and calibration, we find biases at the millimagnitude level from this method in four red filters (Y106, J129, H158, and F184), easily meeting the 0.5% Roman inter-filter calibration requirement for a cutting-edge measurement of cosmological parameters using SNe Ia. Simulated data in the bluer Z087 filter shows larger ~ 2–3 mmg biases, also meeting this requirement, but with more room for improvement. Our forward-model code has been released on Zenodo.

79 ASTRONOMY AND ASTROPHYSICS↗

Flight accommodations using a special structure

A special payload carrier structure has been developed in order to provide Space Shuttle flight accommodations for an exceptionally heavy instrument package requiring no subsystems support. This Mission Peculiar Equipment Support Structure (MPESS) will support the OSTA-2 payload for a materials processing mission. The modular design of the MPESS offers a payload support capability at multiple locations within the Space Shuttle cargo bay. The MPESS is also scheduled for use with earth observation instruments to be carried by the OSTA-3 mission in late 1984.

Noblitt, B. G.↗

The Berkeley Serendip Project

An automated system was designed to perform a real time search for narrow band radio signals in the spectra of sources in a regularly scheduled, non-SETI astronomical observing program. The system will compute the power spectrum using a 65,536 channel fast Fourier transform processor with a real time bandwidth of 128 KHz and 2 Hz per channel resolution. After search for peaks in a 100 KHz portion of the IF band of the radio telescope, the system will move to the next 100 KHz portion using a programmable frequency synthesizer. When the whole IF band is scanned, the process will start again. Unidentified peaks in the power spectra are candidates for further study and their celestial coordinates will be recorded along with the time and power, IF and RF frequency, and bandwidth of the peak. Most of the hardware was developed and the machine software is in the process of being finalized. A number of means for identifying and rejecting power spectra peaks which have a high likelihood of being nonuseful are being investigated.

Bowyer, S.↗

The Serendip II design

Serendip II is an automated system designed to perform a real time search for narrow band radio signals in the spectra of sources in a regularly scheduled, non-Seti, astronomical observing program. Because Serendip II is expected to run continuously without requiring dedicated observing time, it is hoped that a large portion of the sky will be surveyed at high sensitivity and low cost. Serendip II will compute the power spectrum using a 65,536 channel fast Fourier transform processor with a real time bandwidth of 128 KHz and 2 Hz per channel resolution. After searching for peaks in a 100 KHz portion of the radio telescope's IF band, Serendip II will move to the next 100 KHz portion using a programmable frequency synthesizer; when the whole IF band has been scanned, the process will start again. Unidentified peaks in the power spectra are candidates for further study and their celestial coordinates will be recorded along with the time and power, IF and RF frequency, and bandwidth of the peak.

Werthimer, D.↗