Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “negotiation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The stability of an asymmetric rotor in damped supports

A general-purpose method of evaluating the stability of an asymmetric flexible rotor, mounted in symmetric damped bearings, is defined. This method evaluates the complex eigenvalues of the rotor system by solving the equations of motion in a rotating coordinate frame. The application of this method to a rotor mounted in tilting-pad bearings is demonstrated. The observed behavior of a number of different rotor configurations is compared with corresponding predictions of stability. For the configurations predicted to be unstable, a distinct and unnegotiable threshold of instability is encountered. The sharpness of this threshold is emphasized by careful balancing at speeds fractionally below the threshold. In a final configuration predicted to be marginally stable, lightly damped resonant behavior, negotiable by balancing, is encountered in the region of the first critical speed.

Smalley, A. J.↗

A high school is supplied with solar energy--Dallas, Texas

System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

Source record↗

International aerospace engineering: NASA shuttle and European Spacelab

NASA negotiations and contractual arrangements involving European space research organizations' participation in manned space operations and efforts in building Spacelab for the U.S. Reusable Space Shuttle are discussed. Some of the diplomatic and technical collaboration involved in the international effort is reviewed.

Bilstein, R. E.↗

Remote sensing procurement package: A technical guide for state and local governments

The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.

Source record↗

International space policy and the interests of the United States and developing countries

The paper discusses principles which must be upheld in order to protect U.S. interests in space, the potential impact of the Moon Treaty on these principles, how to satisfy the legitimate needs of developing countries while protecting U.S. interests, and how to enhance the probability of success in future negotiations concerning space. It is suggested that, in order to preserve the rights of its citizens and industry to exploit space, the United States must make a strong effort to help solve the problems of the developing countries, maintain a strong space program, and develop and follow a space policy that reflects the interests of the American people.

Bon, B.↗

Improved SCR ac Motor Controller for Battery Powered Urban Electric Vehicles

An improved ac motor controller, which when coupled to a standard ac induction motor and a dc propulsion battery would provide a complete electric vehicle power train with the exception of the mechanical transmission and drive wheels was designed. In such a system, the motor controller converts the dc electrical power available at the battery terminals to ac electrical power for the induction motor in response to the drivers commands. The performance requirements of a hypothetical electric vehicle with an upper weight bound of 1590 kg (3500 lb) were used to determine the power rating of the controller. Vehicle acceleration capability, top speed, and gradeability requisites were contained in the Society of Automotive Engineers (SAE) Schedule 227a(d) driving cycle. The important capabilities contained in this driving cycle are a vehicle acceleration requirement of 0 to 72.4 kmph (0 to 45 mph) in 28 seconds a top speed of 88.5 kmph (55 mph), and the ability to negotiate a 10% grade at 48 kmph (30 mph). A 10% grade is defined as one foot of vertical rise per 10 feet of horizontal distance.

Latos, T. S.↗

Turnkey CAD/CAM selection and evaluation

The methodology to be followed in evaluating and selecting a computer system for manufacturing applications is discussed. Main frames and minicomputers are considered. Benchmark evaluations, demonstrations, and contract negotiations are discussed.

Moody, T.↗

WTS-4 system verification unit for wind/hydroelectric integration study

The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

Watts, A. W.↗

Safety policy and requirements for payloads using the Space Transportation System (STS)

The Space Transportation Operations (STO) safety policy is to minimize STO involvement in the payload and its GSE (ground support equipment) design process while maintaining the assurance of a safe operation. Requirements for assuring payload mission success are the responsibility of the payload organization and are beyond the scope of this document. The intent is to provide the overall safety policies and requirements while allowing for negotiation between the payload organization and the STO operator in the method of implementation of payload safety. This revision provides for a relaxation in the monitoring requirements for inhibits, allows the payload organization to pursue design options and reflects, additionally, some new requirements. As of the issue date of this NHB, payloads which have completed the formal safety assessment reviews of their preliminary design on the basis of the May 1979 issue will be reassessed for compliance with the above changes.

Source record↗

Impact of atmospheric uncertainties and viscous interaction effects on the performance of aeroassisted orbital transfer vehicles

Simulations of aerobraking trajectories of aeroassisted orbital transfer vehicles (AOTV's) returning from geosynchronous orbit were analyzed to examine the effects of high-altitude viscous interactions and off-nominal atmospheres on AOTV return weight, heating, and loads performance. Viscous interaction effects encountered at high altitudes had little detrimental effect on the return weight capabilities for AOTV's representing a range of lift/drag ratios. Most of the AOTV return weight increase over an all-propulsive OTV occurred for a low lift/drag ratio. Smaller increases in return weight were observed for higher lift/drag ratios, at the expense of significantly higher heating and aerodynamic loads. Off-nominal atmospheres based on Shuttle-derived data and multipliers on a U.S. Standard Atmosphere were considered. AOTV's intended for entry under standard atmospheric conditions either deorbited during the pass through the off-nominal atmospheres or missed the target phasing orbit by wide margins. The AOTV's could successfully negotiate these atmospheres when new bank-angle histories were implemented with little loss and sometimes with a gain in return weight.

Talay, T. A.↗

NASA and the practice of space law

The paper discusses the need for increased awareness in space law due to advances in space technology and a trend toward commercialization of space. A list of national and international treaties, conventions, agreements, laws, and regulations relevant to space activities is presented. NASA lawyers specialize in international and municipal laws that affect the NASA space mission; an example of the lawyers working with insurance companies in negotiating the first Space Shuttle liability policy is provided. The increased participation of the public sector in space activities, for example, the commercialization of the Space Shuttle transportation system, is examined.

Hosenball, S. N.↗

Standards for space data systems

NASA has chaired the Consultative Committee for Space Data Systems (CCSDS) for the past four years. During that time, a top-level, end-to-end reference model for space data sytems has been developed that identifies the functions anad services which must be provided by space data systems, and defines the interfaces between major functional elements. A group of definitions for standard protocols has been derived by analyzing these interfaces, and a set of detailed guidelines for space data system standards is in the final stages of negotiation among member CCSDS agencies. Two guidelines that address packet telemetry and channel coding have been approved and are being incorporated into the internal standards of member agencies. Others (packet telecommand, time code, standards data format unit) are in review within CCSDS technical panels and will soon be submitted for approval. These guidelines provide a mechanism for significant cost savings in the implementation of space data systems by allowing reuse of hardware and software for different payloads and for missions, and by enabling the substitution of new technology/higher performance elements at key points in the data system without causing major perturbations in the remainder of the system.

Connell, E. B.↗

Spacelab: An International Success Story

Spacelab is a European-developed and U.S.-operated space laboratory carried in the cargo bay of the Space Shuttle Orbiter. This story of the Spacelab Development Program traces the program from the origin of the Spacelab concept, describing negotiations and agreements for European participation and the role of Europe and the United States in system development, operational capability development, and utilization planning. It also considers the joint management structure, coordination, and experience in solving management and technical interface problems. The book is not an exhaustive historical treatise, but an informative and readable story of the evolution and technical accomplishments of this unique program in manned space flight and of some of the unusual political and human interest aspects of the program from the viewpoint of one of the key participants.

Lord, Douglas R.↗

A scheduling and resource management system for space applications

Every spacecraft, whether in orbit around the earth or an a deep space flight, has at its disposal limited amounts of the resources for it to accomplish its mission. Activity scheduling is currently a costly, human intensive task which requires a great deal of expertise. It belongs to a class of problems whose complexity increases exponentially with the number of operations. NASA has in the past accomplished this task by using a great deal of manpower, a large number of negotiating sessions, interminable bouts of phone tag, and mountains of paperwork. Lately the situation has improved with the introduction of automated scheduling techniques, but these to date still require expert involvement and fall short in some important ways. A prototype activity scheduler, MAESTRO, is introduced which is capable of meeting the needs of many NASA missions, eventually to include the Space Station. The approach to resource constrained scheduling is first discussed, then the intended domain for MAESTRO is described along with its design and current capabilities. A description of planned enhancements and revisions to the systems is also presented.

Britt, Daniel L.↗

International cooperation in the Space Station

The principles and policies governing participation in the International Space Station are examined from a NASA perspective. The history of the program is reviewed; the most important aspects of the partnership concept (functional allocation, shared access, and interface commonality) are considered in detail; and the ongoing outfitting studies are briefly characterized. Major issues remaining to be negotiated include (1) the overall management structure; (2) the division of responsibilities for system design, integration, operation, and utilization; and (3) the sharing of operating costs.

Raney, William P.↗

Plans for the development of EOS SAR systems using the Alaska SAR facility

The Alaska SAR Facility (ASF) program for the acquisition and processing of data from the ESA ERS-1, the NASDA ERS-1, and Radarsat and to carry out a program of science investigations using the data is introduced. Agreements for data acquisition and analysis are in place except for the agreement between NASA and Radarsat which is in negotiation. The ASF baseline system, consisting of the Receiving Ground System, the SAR Processor System and the Archive and Operations System, passed critical design review and is fully in implementation phase. Augments to the baseline system for systems to perform geophysical processing and for processing of J-ERS-1 optical data are in the design and implementation phase. The ASF provides a very effective vehicle with which to prepare for the Earth Observing System (EOS) in that it will aid the development of systems and technologies for handling the data volumes produced by the systems of the next decades, and it will also supply some of the data types that will be produced by EOS.

Carsey, F. D.↗

United States and Western Europe cooperation in planetary exploration

A framework was sought for U.S.-European cooperation in planetary exploration. Specific issues addressed include: types and levels of possible cooperative activities in the planetary sciences; specific or general scientific areas that seem most promising as the main focus of cooperative efforts; potential mission candidates for cooperative ventures; identification of special issues or problems for resolution by negotiation between the agencies, and possible suggestions for their resolutions; and identification of coordinated technological and instrumental developments for planetary missions.

Levy, Eugene H.↗

International interface design for Space Station Freedom - Challenges and solutions

The definition of interfaces for the International Space Station is discussed, with a focus on negotiations between NASA and ESA. The program organization and division of responsibilities for the Space Station are outlined; the basic features of physical and functional interfaces are described; and particular attention is given to the interface management and documentation procedures, architectural control elements, interface implementation and verification, and examples of Columbus interface solutions (including mechanical, ECLSS, thermal-control, electrical, data-management, standardized user, and software interfaces). Diagrams, drawings, graphs, and tables listing interface types are provided.

Mayo, Richard E.↗