Data collection was conducted from Phase III Project start date with completion of the NEPA review in Spring for 2009, through an intense characterization period during well drilling in the summer of 2009, to the start of injection December 1, 2009. During the early stages of injection, data collection was very intense. With staff onsite on 24 hour shifts until January, 2010. Detailed data collection was completed episodically during 2010, with an high injection rate in a tracer study completed during the spring of 2010, and then a repeat seismic survey with borehole gravity, VSP, cross-well and sonic logging conducted during the fall of 2010. By the report date at the end of 2011, data had been compiled and distributed to the team for analysis.