Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “linear accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The LANSCE experimental program: accelerator requirements

The LANSCE accelerator complex exploits a flexible, high power 800 MeV proton linear accelerator to enable a broad swath of experimental work supporting multiple scientific programs. The beam requirements for these programs are diverse and change over time. The purpose of this document is to record, at a high level, the experimental requirements driving the beam delivery requirements for each experimental facility at LANSCE. Revision 0 serves to baseline the current set of experiments, and we expect to revise the document on an as-needed basis when either the experimental requirements change or are found to require a more complete definition.

43 PARTICLE ACCELERATORS↗

M.I.T./Canadian vestibular experiments on the Spacelab-1 mission. I - Sensory adaptation to weightlessness and readaptation to one-g: An overview

Human sensory/motor adaptation to weightlessness and readaptation to earth's gravity are assessed. Preflight and postflight vestibular and visual responses for the crew on the Spacelab-1 mission are studied; the effect of the abnormal pattern of otolith afferent signals caused by weightlessness on the pitch and roll perception and postural adjustments of the subjects are examined. It is observed that body position and postural reactions change due to weightlessness in order to utilize the varied sensory inputs in a manner suited to microgravity conditions. The aspects of reinterpretation include: (1) tilt acceleration reinterpretation, (2) reduced postural response to z-axis linear acceleration, and (3) increased attention to visual cues.

Young, L. R.↗

Beam Loss Assessment Through Use of Photomultiplier Tubes

Modern accelerators aim to deliver maximal beam current at stable energy with minimal beam loss. Environmental changes, among other factors, can result in increased beam loss and decreased beam throughput, prompting daily retuning of the accelerator. The compact nature of the oldest part of the linear accelerator limits the available beam instrumentation, making beam loss assessment and tuning difficult. Thus, additional devices for beam loss monitoring must be considered. Photomultiplier tube-based beam loss monitors (BLMs) were installed along the Fermilab drift tube Linac to assess beam loss. Due to noise, the data from the installed photomultiplier tubes was difficult to assess. After noise reduction and signal analysis, it was found that the signals produced by the photomultiplier tubes in response to beam loss were consistent for a given configuration and therefore a reasonable measure of beam loss. This project lays groundwork for future work in beam loss assessment using photomultiplier tubes, with the automation of the process developed in this project being the next step in this effort.

Waggoner, Alexander↗

Status of the PIP-II Cryoplant

The Proton Improvement Plan-II (PIP-II) is an essential upgrade to the Fermilab accelerator complex featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac). The Linac contains 23 SRF cryomodules with the SRF cavities operating at 2 K, a high temperature thermal shield at 40 K and low temperature intercepts at 4.5 K. The PIP-II cryoplant will provide the necessary cooling for the cryomodules and the cryogenic distribution system interconnecting cryoplant and cryomodules. This paper describes the evolution of the PIP-II cryoplant conceptual design and specifications, including the expected heat loads, required cooling features and the integrated design. The cryoplant capacity margin analysis and fast cool-down mode will also be discussed.

43 PARTICLE ACCELERATORS↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

LCLS-II Helium Refrigeration System Commissioning Results

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting linear accelerator composed of 37 cryomodules and two large helium refrigeration systems with a cooling capacity of 4 kW at 2.0 K. The LCLS-II Helium Refrigeration System (HRS) consists of two compressor stations, each with a power of approximately 4.5 MW, two 4.5 K cold boxes, each with a power of 18 kW equivalent at 4.5 K, and two sets of cold compressors that can each produce a flow of 230 g/s at 31 mbar (2.0K). Performance tests of the HRS were meticulously planned and successfully carried out, with results demonstrating that it exceeded the process requirements for LCLS-II operations. This paper provides a detailed presentation of the LCLS-II HRS performance and the challenges encountered during the commissioning phase.

42 ENGINEERING↗

LAMP Low-Energy Region Options: Workshop Report and Ranking Assessment

The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.

43 PARTICLE ACCELERATORS↗

Radiation effects in Caenorhabditis elegans - Mutagenesis by high and low LET ionizing radiation

The nematode C. elegans was used to measure the effectiveness of high-energy ionized particles in the induction of three types of genetic lesions. Recessive lethal mutations in a 40-map unit autosomal region, sterility, and X-chromosome nondisjunction or damage were investigated. Induction rates were measured as a function of linear energy transfer, LET(infinity), for nine ions of atomic nunmber 1-57 accelerated at the BEVALAC accelerator. Linear kinetics were observed for all three types of lesions within the dose/fluence ranges tested and were found to vary strongly as a function of particle LET(infinity). Relative biological effectiveness (RBE) values of up to 4.2 were measured, and action cross sections were calculated and compared to mutagenic responses in other systems.

Nelson, Gregory A.↗

Facility upgrade for superheavy-element research at RIKEN

The RIKEN Nishina Center (RNC) executed an accelerator upgrade project for the heavy-ion linac (called RILAC). A superconducting RIKEN linear accelerator (SRILAC) and a new superconducting electron-cyclotron-resonance ion source (SC-ECRIS) to boost the final energy and intensity were constructed, aimed at synthesizing a new superheavy element, 119, through a hot fusion reaction. The project included the construction of a gas-filled recoil ion separator (GARIS-III) suitable for detecting the residues of the hot-fusion reaction. To avoid research interruption during the SRILAC construction period (2017–2019) and gain experience in hot-fusion reaction processes, GARIS-II located in the GARIS experimental hall in LINAC building was moved to the E6 experimental hall in Nishina building. Certain exploratory measurements were performed employing the beams accelerated by RILAC2 and the RIKEN ring cyclotron (RRC), which is a part of the existing accelerator complex of the radioactive isotope beam factory (RIBF). Further, commissioning experiments with the upgraded facility (SRILAC and GARIS-III) were performed. The upgrade project and its commissioning results are chronologically described in this article.

43 PARTICLE ACCELERATORS↗

Field Emission Mitigation in CEBAF SRF Cavities Using Deep Learning

The Continuous Electron Beam Accelerator Facility (CEBAF) operates hundreds of superconducting radio frequency (SRF) cavities in its two main linear accelerators. Field emission can occur when the cavities are set to high operating RF gradients and is an ongoing operational challenge. This is especially true in newer, higher gradient SRF cavities. Field emission results in damage to accelerator hardware, generates high levels of neutron and gamma radiation, and has deleterious effects on CEBAF operations. So, field emission reduction is imperative for the reliable, high gradient operation of CEBAF that is required by experimenters. Here we explore the use of deep learning architectures via multilayer perceptron to simultaneously model radiation measurements at multiple detectors in response to arbitrary gradient distributions. These models are trained on collected data and could be used to minimize the radiation production through gradient redistribution. This work builds on previous efforts in developing machine learning (ML) models, and is able to produce similar model performance as our previous ML model without requiring knowledge of the field emission onset for each cavity.

Ahammed, K.↗

Design update on the transition beamline for the CEBAF Energy Upgrade

For Jefferson Lab’s 22GeV upgrade, two new permanent-magnet Fixed-Field Alternating Gradient (FFA) arcs will be integrated to serve the accelerator’s six highest-energy recirculation passes. Connecting these FFA arcs to the existing linear accelerator (linac) requires a carefully engineered transition section. The current design has two parts where the first part adiabatically matches the beam dispersion and orbit trajectories, while the second part aligns the Twiss parameters (alpha and beta functions) with those at the linac entrance. Given the tight spatial constraints and multiple matching requirements, a genetic algorithm is being explored to optimize the beam optics matching. This paper presents the current progress in developing and optimizing this transition.

Accelerator Physics↗

Field Emission Mitigation in CEBAF SRF Cavities Using Deep Learning

The Continuous Electron Beam Accelerator Facility (CEBAF) operates hundreds of superconducting radio frequency (SRF) cavities in its two main linear accelerators. Field emission can occur when the cavities are set to high operating RF gradients and is an ongoing operational challenge. This is especially true in newer, higher gradient SRF cavities. Field emission results in damage to accelerator hardware, generates high levels of neutron and gamma radiation, and has deleterious effects on CEBAF operations. So, field emission reduction is imperative for the reliable, high gradient operation of CEBAF that is required by experimenters. Here we explore the use of deep learning architectures via multilayer perceptron to simultaneously model radiation measurements at multiple detectors in response to arbitrary gradient distributions. These models are trained on collected data and could be used to minimize the radiation production through gradient redistribution. This work builds on previous efforts in developing machine learning (ML) models, and is able to produce similar model performance as our previous ML model without requiring knowledge of the field emission onset for each cavity.

Ahammed, K.↗

Study of Microphonic Effects on the C100 Cryomodule for High Energy Electron Beam Accelerators

The Continuous Electron Beam Accelerator Facility (CEBAF) at Thomas Jefferson National Laboratory (JLab) is a particle accelerator which can accelerate an electron beam to relativistic speeds and apply the beam onto target samples. The C100 superconducting radio frequency (SRF) cavity is the primary accelerating structure of the C100 cryomodule, one of the many cryomodules which compose the CEBAF linear accelerator. SRF cavities are particularly sensitive to internal and external vibrations that can result in a phenomenon called microphonics which degrade the operational stability of a cryomodule. The purpose of this thesis is to investigate the significance of mechanical disturbances on the electromagnetic resonant frequency of a C100 SRF cavity. Knowledge of the mechanical resonance of the cavities and cryomodule sheds light into how these disturbances are most easily realized as deformation which causes radio frequency (RF) detuning. Three studies were conducted: the development and hammer test calibration of a Finite Element Analysis (FEA) model of a C100 cavity, the development and hammer test calibration of an FEA model of a C100 cavity string, and the hammer test of the C100-10R cryomodule at the Cryomodule Test Facility (CMTF). The cavity FEA model was found to accurately predict two modes found in two real cavities in a simply supported configuration. The cavity string FEA model leveraged the calibrated cavity FEA model but was not found to accurately predict the modal behavior of a real cavity string. Even so, the modal behavior of the cavity string inside the C100-10R cryomodule was captured during a hammer test while it was partially assembled. Finally, the C100-10R cryomodule was placed in the CMTF to study RF detuning. The RF detuning spectra during hammer hits and background noise was captured. The results of the hammer testing indicate two strong peaks at low frequencies (9-10 Hz and 22-23 Hz). These two frequencies were found to be nearly coincident to four instances of mechanical resonance found during the hammer testing done on the partially-assembled C100-10R. Because of this, these two modes are believed to contribute to RF detuning of the cryomodule. This test event also included the testing of the effectiveness of a configuration of BNNT canisters designed to act as dampers. While these tests show promising results, the lurking variables render these tests somewhat inconclusive.

Hull, Caleb James↗