DOE OSTI2015
Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗