Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnect”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The Impact of a Faster Thermal Cycling Profile on PV Cell Interconnect Cycles to Failure

The thermal cycling tests used in the photovoltaic industry are slow, requiring over a month for 200 cycles and five months for 800 cycles. A faster alternative would reduce the cost of delay for module qualification. This study investigates the correlation between a baseline thermal cycling profile and profiles that are three and six times faster. Interconnect failure data for each profile was gathered across eight splits of varying material combinations. Models were applied to the failure data and factors which impacted interconnect lifetime were identified. Here, the results show that more cycles were required in the faster profiles for equivalency to the baseline profile. Furthermore, the equivalent number of cycles varied by a factor of two across the splits. Despite these limitations, the faster profiles offer substantial qualification time savings if the underlying failure mechanisms are understood.

14 SOLAR ENERGY↗

Evaluating Modern GPU Interconnect: PCIe, NVLink, NV-SLI, NVSwitch and GPUDirect

High performance multi-GPU computing becomes an inevitable trend due to the ever-increasing demand on computation capability in emerging domains such as deep learning, big data and planet-scale simulations. However, the lack of deep understanding on how modern GPUs can be connected and the real impact of state-of-the-art interconnect technology on multi-GPU application performance become a hurdle. In this paper, we fill the gap by conducting a thorough evaluation on five latest types of modern GPU interconnects: PCIe, NVLink-V1, NVLink-V2, NVLink-SLI and NVSwitch, from six high-end servers and HPC platforms: NVIDIA P100-DGX-1, V100-DGX-1, DGX-2, OLCF’s SummitDev and Summit supercomputers, as well as an SLI-linked system with two NVIDIA Turing RTX-2080 GPUs. Based on the empirical evaluation, we have observed four new types of GPU communication network NUMA effects: three are triggered by NVLink’s topology, connectivity and routing, while one is caused by PCIe chipset design issue. These observations indicate that, for a multi-GPU application running in a multi-GPU node, choosing the right GPU combination can impose considerable impact on GPU communication efficiency, as well as an application’s overall performance. Our evaluation can be leveraged in building practical multi-GPU performance models, which are vital for GPU task allocation, scheduling and migration in a shared environment (e.g., AI cloud and HPC centers), as well as communication-oriented performance tuning.

Performance Evaluation, GPU, Interconnect, NUMA, P↗

Investigation of AISI 441 Ferritic Stainless Steel and Development of Spinel Coatings for SOFC Interconnect Applications

As part of an effort to develop cost-effective ferritic stainless steel-based interconnects for solid oxide fuel cell (SOFC) stacks, both bare and spinel coated AISI 441 were studied in terms of metallurgical characteristics, oxidation behavior, and electrical performance. The conventional melt metallurgy used for the bulk alloy fabrication leads to significant processing cost reduction and the alloy chemistry with the presence of minor alloying additions of Nb and Ti facilitate the strengthening by precipitation and formation of Laves phase both inside grains and along grain boundaries during exposure in the intermediate SOFC operating temperature range. The Laves phase formed along the grain boundaries also ties up Si and prevents the formation of an insulating silica layer at the scale/metal interface during prolonged exposure. The substantial increase in ASR during long term oxidation due to oxide scale growth suggested the need for a conductive protection layer, which could also minimize Cr evaporation. In particular, Mn1.5Co1.5O4 based surface coatings on planar coupons drastically improved the electrical performance of the 441, yielding stable ASR values at 800ºC for over 5,000 hours. Ce-modified spinel coatings retained the advantages of the unmodified spinel coatings, and also appeared to alter the scale growth behavior beneath the coating, leading to a more adherent scale. The spinel protection layers appeared also to improve the surface stability of 441 against the anomalous oxidation that has been observed for ferritic stainless steels exposed to dual atmosphere conditions similar to SOFC interconnect environments. Hence, it is anticipated that, compared to unmodified spinel coatings, the Ce-modified coatings may lead to superior structural stability and electrical performance.

30 DIRECT ENERGY CONVERSION↗

Updating Small Generator Interconnection Procedures for New Market Conditions

Federal and state regulators are faced with the challenge of keeping interconnection procedures updated against a backdrop of evolving technology, new codes and standards, and considerably transformed market conditions. This report is intended to educate policymakers and stakeholders on beneficial reforms that will keep interconnection processes efficient and cost-effective while maintaining a safe and reliable power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Electricity Futures. Operational Analysis of the Western Interconnection at Very High Renewable Penetrations

The Renewable Electricity Futures Study (RE Futures)--an analysis of the costs and grid impacts of integrating large amounts of renewable electricity generation into the U.S. power system--examined renewable energy resources, technical issues regarding the integration of these resources into the grid, and the costs associated with high renewable penetration scenarios. These scenarios included up to 90% of annual generation from renewable sources, although most of the analysis was focused on 80% penetration scenarios. Hourly production cost modeling was performed to understand the operational impacts of high penetrations. One of the conclusions of RE Futures was that further work was necessary to understand whether the operation of the system was possible at sub-hourly time scales and during transient events. This study aimed to address part of this by modeling the operation of the power system at sub-hourly time scales using newer methodologies and updated data sets for transmission and generation infrastructure. The goal of this work was to perform a detailed, sub-hourly analysis of very high penetration scenarios for a single interconnection (the Western Interconnection). It focused on operational impacts, and it helps verify that the operational results from the capacity expansion models are useful. The primary conclusion of this study is that sub-hourly operation of the grid is possible with renewable generation levels between 80% and 90%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing Opportunities and Challenges for Streamlining Interconnection Processes

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Electric Power Research Institute conducted a survey of existing utility interconnection practices and evaluated opportunities for streamlining them. The report highlights opportunities for electric utilities to improve transparency and automate administrative processes with options to fit the level of interconnections that utilities are experiencing.

14 SOLAR ENERGY↗

GMLC Survey of Distributed Energy Resource Interconnection and Interoperability Standards

This document reports on the Grid Modernization Laboratory Consortium effort to identify gaps in standards for the interconnection and interoperability of distributed energy resources (DERs). The project extended a 3-year period from 2017 to 2019. Under the work plan, the team identified standards and test procedures related to interconnection and interoperability, grouped under the broad headings of their primary applicable technology domain: automotive, responsive loads, photovoltaic inverters, inverter-based energy storage, machine-based DERs, and microgrids. The team then conducted a gap analysis by comparing the current standards to the expected future requirements needed for specific grid services. Overall, gaps could be any activity needed to harmonize requirements among standards development organizations, minimize conflicting requirements among technology domains, or streamline conformance test procedures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

A Roadmap for Quantum Interconnects

Created by Q-NEXT, a U.S. Department of Energy (DOE) National Quantum Information Science Research Center, this document is a roadmap for quantum interconnects research and its impact for quantum information science and technology. It is the outcome of the collective work of a large team of Q-NEXT members and participants from academia, industry and DOE national laboratories. The roadmap addresses the role of quantum interconnects in three emerging areas of quantum information: computing, communication and sensing. It reviews the materials, components and systems used for these purposes; summarizes relevant scientific questions and issues; and addresses the most pressing research needs. The document then distills these considerations into recommendations for strategic science and technology research imperatives for the next decade. In addition to informing Q-NEXT’s internal activities, the roadmap has also been created with a broader objective of developing a guide for key issues and research needed over the next decade for the worldwide scientific and engineering community interested in quantum information.

42 ENGINEERING↗

Providencia Island White Papers: Stakeholder Engagement & Coordination in Interconnection Rulemaking

The starting point of engineering interconnection rules involves determining the technological and socioeconomic contexts that drive potential challenges and opportunities for renewable energy adoption and integration. This paper discusses the importance of understanding the viewpoints, expectations, and needs of the range of stakeholders when developing an interconnection rule. Approaches to ensure a result that aligns with various goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Eastern Interconnection Wide-Area Oscillation Assessment and Study Report

To meet the government mandates such as Renewable Portfolio Standards (RPS), conventional synchronous generators with rotating mass are being displaced by inverter-based resources (IBRs), leading to high penetration of renewable energy sources (RES). As a result, the inherent properties and characteristics of the transformed generation mix may significantly impact the grid behaviour, and it is of paramount significance that the impact and the consequences of the resource mix change is thoroughly understood to adopt measures to maintain reliable grid operations. Of great concern is the inter-area low-frequency oscillation, which usually propagates through a large region and has a system-wide impact. Such oscillations may lead to unnecessary or inadvertent tripping of generators, that may be simply reacting to the oscillation originating from geographically remote sites. Such tripping of generators can lead to cascading outages, system split and load loss events. Over the years, several system-wide oscillation events have been observed across all three North American interconnections. This project titled Wide-area Oscillation Assessment and Trending Study, sponsored by the Office of Electricity (OE) of the Department of Energy (DOE), aims to conduct the required research to capture and investigate the potential changes in wide-area oscillatory performance of the system as a result of resource mix transition. The Pacific Northwest National Laboratory (PNNL) conducted this research and technical staff of Federal Energy Regulatory Commission (FERC) served as advisors to the project. The primary objective of this study is to assess whether there are significant trends in the power system wide-area oscillatory behaviours, as a result of the generation-mix changes due to the increased penetration of RES in the U.S. Eastern Interconnection (EI). The analysis presented in this report can serve as reference for future grid planning and operation of the EI system. This research conducted in this project evaluates the wide-area oscillatory behaviour of the EI, using a model-based approach for potential future resource mixes, and the measurement-based analysis with 21-month phasor measurement unit (PMU) time series. The oscillation modes in EI system along with the impact of the changes of the generation mix on the frequency and damping ratio (DR) of the oscillations have been studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Entropy Analysis of FPGA Interconnect and Switch Matrices for Physical Unclonable Functions

Random variations in microelectronic circuit structures represent the source of entropy for physical unclonable functions (PUFs). In this paper, we investigate delay variations that occur through the routing network and switch matrices of a field-programmable gate array (FPGA). The delay variations are isolated from other components of the programmable logic, e.g., look-up tables (LUTs), flip-flops (FFs), etc., using a feature of Xilinx FPGAs called dynamic partial reconfiguration (DPR). A set of partial designs is created to fix the placement of a time-to-digital converter (TDC) and supporting infrastructure to enable the path delays through the target interconnect and switch matrices to be extracted by subtracting out common-mode delay components. Delay variations are analyzed in the different levels of routing resources available within FPGAs, i.e., local routing and across-chip routing. Data are collected from a set of Xilinx Zynq 7010 devices, and a statistical analysis of within-die variations in delay through a set of the randomly-generated and hand-crafted interconnects is presented.

97 MATHEMATICS AND COMPUTING↗

The Development of Interconnection Standards in Six States In 2007-2008

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

14 SOLAR ENERGY↗

Interconnection Requirements for Renewable Generation and Energy Storage in Island Systems: Puerto Rico Example: Preprint

On September 20, 2017, Hurricane Maria made landfall in Puerto Rico, incapacitating the central power system and leaving the entire island without power. To ensure the long-term recovery of Puerto Rico's electric power grid in the most secure and resilient way, the U.S. Department of Energy funded research to develop recommendations for a cohesive new framework of interconnection standards for utility-scale renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This paper provides a summary of work conducted by the National Renewable Energy Laboratory to analyze and address many shortcomings and areas of improvement to help the Puerto Rico Electric Power Authority (PREPA) establish minimum technical requirements for interconnecting single-technology and hybrid renewable generation because of their importance for PREPA system security and impacts on future integrated resource planning scenarios. Results and findings presented in this paper are important for any island power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overcoming Challenges for DER Interconnection - Spotlight on Energy Storage

The Distributed Generation Integration Collaborative (DGIC) convened a half-day interactive workshop in Washington, D.C. on July 29, 2019. Organized by the Electric Power Research Institute (EPRI) and the National Renewable Energy Laboratory (NREL), the workshop explored a variety of issues related to the grid interconnection of energy storage and solar+storage systems, primarily on distribution.This document provides the workshop's proceedings as well as stakeholder perspectives, documented during a workshop breakout exercise, on a range of industry actions that can be undertaken to improve energy storage interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MN Solar Pathways: Assessing Opportunities and Challenges for Streamlining Interconnection Processes

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Electric Power Research Institute conducted a survey of existing utility interconnection practices and evaluated opportunities for streamlining them. The report highlights opportunities for electric utilities to improve transparency and automate administrative processes with options to fit the level of interconnections that utilities are experiencing.

14 SOLAR ENERGY↗