Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cell Science-03 (CS-03) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-03 operations.

Cell Science↗

Cell Science-02 (CS-02) Payload Overview POIWG #43

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-02 operations.

Cell Science↗

Cell Science-03 (CS-03) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 25th, 2018. It provides a high-level overview of Cell Science-03 operations.

CS-03↗

An Evaluation of Operational Airspace Sectorization Integrated System (OASIS) Advisory Tool

In January 2013, a human-in-the-loop evaluation of the Operational Airspace Sectorization Integrated System (OASIS) was conducted in the Airspace Operations Laboratory of the Human Systems Integration Division (Code TH) in conjunction with the Aviation Systems Division (Code AF). The development of OASIS is a major activity of the Dynamic Airspace Configuration (DAC) research focus area within the Aeronautics Research Mission Directorate (ARMD) Airspace Systems Program. OASIS is an advisory tool to assist Federal Aviation Administration (FAA) En Route Area Supervisors in their planning of sector combinedecombine operations as well as opening closing of Data-side (D-side) control positions. These advisory solutions are tailored to the predicted traffic demand over the next few hours. During the experiment, eight retired FAA personnel served as participants for a part-task evaluation of OASIS functionality, covering the user interface as well as the underlying algorithm. Participants gave positive feedback on both the user interface and the algorithm solutions for airspace configuration, including an excellent average rating of 94 on the tool usability scales. They also suggested various enhancements to the OASIS tool, which will be incorporated into the next tool development cycle for the full-scale human-in-the-loop evaluation to be conducted later this year.

decision support tools↗

Construction of classical superintegrable systems with higher order integrals of motion from ladder operators

We construct integrals of motion for multidimensional classical systems from ladder operators of one-dimensional systems. This method can be used to obtain new systems with higher order integrals. We show how these integrals generate a polynomial Poisson algebra. We consider a one-dimensional system with third order ladder operators and found a family of superintegrable systems with higher order integrals of motion. We obtain also the polynomial algebra generated by these integrals. We calculate numerically the trajectories and show that all bounded trajectories are closed.

97 MATHEMATICS AND COMPUTING↗

BioNutrients-1 (BN-1) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 23-25th, 2018. It provides a high-level overview of BioNutrients-1 operations.

Sims, Kevin↗

Recent operational experiments at the LANSCE facility

The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

43 PARTICLE ACCELERATORS↗

Cryogenic control system operational experience at SNS

Abstract The helium cryogenic system at Spallation Neutron Source (SNS) provides cooling to 81 superconducting radio frequency cavities. To support the operation of the cryogenic facility, a highly reliable control system consisting of software, hardware, and Human Machine Interface (HMI) has been developed and improved during the first fifteen years of operation. Integrating the cryogenic control system with other subsystems of the SNS complex is an important aspect to the success of the operation. The operating experience, lessons learned and recommendations to consider for future facilities will be detailed in this paper.

Howell, M. (ORCID:0000000310360707)↗

Boolean integral calculus

The concept of Boolean integration is developed, and different Boolean integral operators are introduced. Given the changes in a desired function in terms of the changes in its arguments, the ways of 'integrating' (i.e. realizing) such a function, if it exists, are presented. The necessary and sufficient conditions for integrating, in different senses, the expression specifying the changes are obtained. Boolean calculus has applications in the design of logic circuits and in fault analysis.

Tucker, Jerry H.↗

Mission Operations Assurance

Integrate the mission operations assurance function into the flight team providing: (1) value added support in identifying, mitigating, and communicating the project's risks and, (2) being an essential member of the team during the test activities, training exercises and critical flight operations.

project tracking↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Propulsion↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Ground Servicing↗

Addressing Human Error in International Space Station Flight Control Teams: Advances in Ground Training for Science Operators

In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork. To address these teamwork errors, trainers at the POIC have drawn best practices from high reliability industries as well as from our sister ISS control center at the Johnson Space Center (JSC) in Houston, Texas, to develop and implement a new training program focused specifically on teamwork skills. This training program, called Team Skills Training, is inspired by modern and historical training programs developed by NASA and is specifically tailored to the needs of the payload operations flight control team at the POIC. The program consists of training for both certified and trainee flight controllers, and covers team skills topics such as situational awareness, leadership, and communication skills. To maximize effectiveness, the program uses novel instructional techniques which extend beyond the classroom to encourage students to apply what they have learned to their day to day work. Minimizing operator errors in flight control is an endeavor which requires constant vigilance and continuous improvement. At the POIC, Team Skills Training is an important step in this journey.

Harris, Samantha S.↗

Results of External Technical Reviews of Site Modeling Efforts That Support System Plans

An External Technical Review (ETR) team evaluated the system-level modeling and simulation tools in support of Savannah River Site and Office of River Protection liquid waste processing and disposal systems. The reviews focused on the following primary areas: software and modeling tools, capability to model needed facilities and operations, rate at which predictions are performed, and need for additional tools. The Liquid Waste Disposition Systems at these sites are highly integrated operations that involve safely storing liquid waste in underground storage tanks; removing, treating, and disposing low-activity fraction on-site; vitrifying high-level waste; and storing the vitrified waste until permanent disposition at a Federal Repository. The purpose of the ETR team was to evaluate the current process simulation tools that support the planning basis for life cycle liquid waste disposition system plans. These plans establish a base for processing the constituents of liquid waste systems to the end of the program mission. Observations and recommendations were made for each of the review areas. In general, tools appear to provide reasonable estimates for their intended purposes; however, additional functionality and new tools are needed, as well as greater flexibility and improved performance in producing estimates for planning purposes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗