Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed base”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Towards Commercialization of Low-Cost, Crack-Tolerant, Screen-Printable Metallization by Full-Size Module Testing and Field Characterization

This project is motivated by the need to develop a materials engineering solution to reduce solar module degradation caused by cell cracks. The cell-crack-induced power loss is a long-term degradation mechanism and one of the main causes of solar panel field failures. Cell cracks can occur during module fabrication, transportation, installation, and long-term operation due to thermomechanical stressors. Our team’s internal estimation – based on the national weather pattern, frequency of severe weather, and 39- GW asset survey by Heliolytics – reveals that the cell-crack-induced module degradation translates to lost revenues >$17B over an average 5-year period for solar farm owners and to reduced reliability (<25 years panel lifetime) for solar energy consumers. In response to this challenge, the prime recipient offers a metal matrix composite (MMC) silver paste that is tailor-engineered for screen-printing gridlines and busbars, which serve as the electrical contacts on solar cells. We formulate our MMC paste by adding low-cost (∼0.02¢/WDC for research grade), surface-engineered carbon nanotubes to commercially available silver paste. The MMC paste offers a drop-in, cost-effective solution to cell cracks for solar cell and module manufacturers. The main goal of this project was to conduct field-relevant, module-level analysis and qualification of MMC metallization.

14 SOLAR ENERGY↗

Hydropower Energy Storage Capacity Dataset

The Hydropower Energy Storage Capacity (HESC) Dataset catalogues estimates of nominal energy storage capacity based on varying levels of detail. Dams and reservoirs selected were selected based on those reported in the National Inventory of Dams (NID 2019) and/or the Global Reservoir and Dam (GRanD v1.3) datasets. These data provide a foundation for understanding available resources at existing hydropower facilities and their potential to provide storage of energy and more flexible generation. Current estimates include Level 1 (based on maximum storage capacities and hydraulic head) and Level 2 (based on historical models or observations of reservoir volume and hydraulic head). For facilities where installed capacity is known, there are also estimates for discharge duration or the length of time when a facility could provide generation at a given capacity. Essential information used to calculate the energy storage capacity and discharge duration (volume, hydraulic head, and details about the sources or records used to obtain those parameters) and summaries of historical generation (for context) are also included.

13 HYDRO ENERGY↗

Hygrothermal simulation of exterior retrofits in a cold climate

This work presents results from moisture modeling as part of a project undertaken by Pacific Northwest National Laboratory and its research partners, the University of Minnesota, and the Oak Ridge National Laboratory. The research goal is to identify exterior wall retrofit systems for cold climates that are low cost, energy efficient, and do not result in moisture durability problems. A base case wall was identified representing a typical wood frame construction, circa 1950. Retrofit options were selected based on input from industry, academia, and published work and seven options were constructed and installed at the University of Minnesota’s cold weather exposure facility in Cloquet, MN. Measurements were carried out during winter months and the data was used for model validation. Hygrothermal simulations were then carried out using WUFI (Version 6.4) in accordance with standard ANSI/ASRHAE 160-2016, Criteria for Moisture-Control Design Analysis in Buildings. Simulations were run out to three years and results show that the exterior retrofits improve thermal performance and do not negatively impact moisture durability of the existing wall.

Aldykiewicz Jr, Antonio↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling Savings for ENERGY STAR Smart Home Energy Management Systems

The objective of this study was to develop a repeatable and defensible methodology to analyze the energy savings for Home Energy Management Systems (HEMS) that meets the minimum requirements for certification under ENERGY STAR ® Smart Home Energy Management System (SHEMS) Version 1. Mandatory connected loads include a smart thermostat, two smart lights, and one smart power strip or smart outlet. Control strategies must include feedback to occupants through an in-home display, user programming, occupancy sensor-based controls, and responsiveness to utility signals such as demand response programs. Several occupant behavior patterns were selected to quantify the range of energy savings potential for a HEMS with this basic functionality. A literature review was conducted to establish realistic room-by-room occupancy levels and usage patterns for connected devices. A series of event-driven hourly profiles were created, followed by adjustments based on application of HEMS control strategies to thermostats, interior lighting, and plug load schedules. EnergyPlus modeling was performed using these hourly schedules in three locations (Boston, Houston, and Phoenix) to examine climate dependence of energy savings. Total site energy savings ranged from 4.3 to 27.1 MBtu/year (7%-35%), and utility bill savings ranged from $\$$123 to $\$$670/year (6%-29%). The highest predicted savings was realized by occupants that were not energy conscious prior to HEMS installation, but highly engaged with the HEMS controls once the system was installed. The smart thermostat accounted for most of the savings, followed by the smart power strip. Smart lighting did not save a significant amount of energy in our analysis, based on an assumption that efficient LEDs with no standby power would normally be installed anyway.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Secure boot, trusted boot and remote attestation for ARM TrustZone-based IoT Nodes

With the extensive application of IoT techniques, IoT devices have become ubiquitous in daily lives. Meanwhile, attacks against IoT devices have emerged to compromise IoT devices by tampering with system pre-installed programs or injecting new malware. To mitigate these attacks, integrity enforcement of IoT systems has been proposed. The integrity of an IoT device system includes load-time integrity and runtime integrity. In this paper, we design an IoT system based on ARM TrustZone to enforce the system integrity. First, we establish the root of trust and propose a hybrid booting approach consisting of both secure boot and trusted boot to enforce the system load-time integrity. Second, we investigate a paging-based process integrity measurement method to measure the NW processes and conduct remote attestation based on the measurement results ensuring the NW runtime process integrity. We implement an IoT prototype system on a NXP i.MX6Q SABRE SD development board to assess its feasibility. Finally, real-world experiment results demonstrate that our prototype introduces negligible performance overhead to the original system.

97 MATHEMATICS AND COMPUTING↗

Automation of FARM from Alpha Phase to Beta Phase

Integrated energy systems (IES) combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework and the RAVEN plugin for grid and capacity optimization (HERON) are used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES, by respecting the limits on the production variables and the corresponding rates of variation (explicit constraints). Besides, there are other process variables whose evolution needs to be bounded to avoid damaging the components (e.g., condensers, heat exchangers, steam generators, etc.) or degrading the process efficiency (e.g., electrolysis in the hydrogen production process). To avoid violating these latter limits (implicit constraints), a proof-of-concept HERON validator based on Feasible Actuator Range Modifier (FARM-Alpha) was developed by Argonne National Laboratory in January 2021. This FARM-Alpha validator calculates the evolution of process variables on whom the implicit constraints are placed, and then provides feedback to HERON dispatcher to adjust the power setpoints of three IES components, i.e., Balance of Plant, Secondary Energy Source, and Thermal Energy Storage, so as to meet both the explicit and implicit constraints. FARM-Alpha was designed to assess the performance of FARM as a HERON validator only, i.e., the list of components and implicit operational constraints were hard-coded within the source code. The lack of flexibility of the corresponding software structure does not allow the deployment in production environment. This report describes the development and the implementation of an enhanced version of the FARM-based validator (FARM-Beta), which ensures more flexibility for the end user in modeling multiple IES configurations and scenarios. Several test cases of the power dispatch problem were then selected to demonstrate the capabilities offered by FARM-beta. The test cases illustrate the efficiency of the closed-loop optimization scheme and the capability to calculate set-point trajectories satisfying both explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State-of-the-art short-term electricity market operation with solar generation: A review

With the accelerating penetration of solar energy in energy systems, market operations concerning the solar-associated intermittency are widely discussed. How to correctly model the solar generation in the market and solve the uncertainty-based operation problems call for solutions. Unlike other renewable resources, solar power can be more easily applied to the demand side through behind-the-meter installations in a distributed manner with significant future extensibility. The corresponding operational rules in the markets are largely being revised. Over the past two decades, with the development of deregulated power markets, numerous studies related to uncertainty-based market operations tend to transform the market from a deterministic and centralized framework to a stochastic and decentralized one. As the relevant literature is most recent, this paper reviews their contributions to electricity market operations with solar integration and underlines the research directions of this topic and ongoing industry practices. A thorough review of the electricity markets worldwide with solar energy is provided. A variety of proposed mathematical solutions to the problem are also addressed.

14 SOLAR ENERGY↗

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Global Techno-Economic Performance of Bifacial and Tracking Photovoltaic Systems

Although most of the current photovoltaic (PV) system installations use monofacial modules with fixed-tilt mounting structures, bifacial modules, trackers, and the combination of them are also getting more attention as potential candidates to further reduce the PV levelized cost of electricity (LCOE). This work is then the first to present a worldwide analysis on the yield potential and cost-effectiveness of PV farms composed of monofacial fixed-tilt and single/dual (1T/2T) tracker installations, as well as their bifacial counterparts. Our approach starts by estimating the irradiance reaching the front and rear surface of the modules for the different system designs (validated based on data from real PV systems and results from the literature) to estimate their energy production (row-row shading is neglected). Subsequently, the overall system cost during their 25-year lifetime is factored in, and LCOE is obtained. The results reveal that bifacial-1T installations increase energy yield by 35% and reach the lowest LCOE for the majority of the world (93.1% of the land area). Although dual axis trackers achieve the highest energy generation — especially for bifacial modules — their cost is still too high, and are therefore not as cost-effective. Sensitivity analyses based on the Monte Carlo and region sensitivity approach are performed to analyze the impact of input assumptions on the calculated LCOE. These reveal that our conclusions are robust in general but exact configuration to choose depends on specific site conditions. This investigation is not only of interest to the scientific community, but also can be used as a guide for PV installation companies and investors to determine the most suitable technology for a particular location.

14 SOLAR ENERGY↗

Building Analytics Tool Deployment at Scale: Benefits, Costs, and Deployment Practices

Buildings are becoming more data-rich. Building analytics tools, including energy information systems (EIS) and fault detection and diagnostic (FDD) tools, have emerged to enable building operators to translate large amounts of time-series data into actionable findings to achieve energy and non-energy benefits. To expedite data analytics adoption and facilitate technology innovation, building owners, technology developers, and researchers need reliable cost–benefit data and evidence-based guidance on deployment practices. This paper fulfills these needs with the energy use and survey data from a wide-ranging research and industry partnership program that covers thousands of buildings installed with analytics tools. The paper indicates that after two years of implementation, organizations using FDD tools and EIS tools achieved 9% and 3% median annual energy savings, respectively. The median base cost and annual recurring cost for FDD are USD 0.65 per square meter (m2) (USD 0.06 per square foot [ft2]) and USD 0.22 per m2 (USD 0.02 per ft2), and are USD 0.11 per m2 (USD 0.01 per ft2) and USD 0.11 per m2 (USD 0.01 per ft2) for EIS. The common metrics and analyses that are used in the tools to support the discovery of energy efficiency measures are summarized in detail. Two best practice examples identified to maximize the benefits of tool implementation are also presented. Opportunities to advance the state of technology include simplified data integration and management, and more efficient processes for acting on analytics outputs. Compared with previous efforts in the literature, the findings presented in this paper demonstrate the effectiveness of building analytics tools with the largest known dataset.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Warrick Conductivity Level Controllers Series 3H

This is my internship poster. In the poster I talk about the level controllers that I wired together and installed to support electrolysis testing systems in efforts to make the systems more efficient and run based on the communication between devices to ensure a closed loop system that can run on its own in a safe and controlled manner. I included pictures of some of the wiring as well as the level sensor devices and relays. I also included pictures of the tanks that will be filled at different heights with deionized water based on where the level sensors are.

08 HYDROGEN↗

Flood Estimation under Snowmelt and Rain-on-Snow Processes in Alaska: A Military Installation Perspective

Accurate flood estimation in snow-dominated and high-latitude regions remains challenging due to complex interactions among rainfall, snowmelt, and rain-on-snow (ROS) processes, which are not captured in conventional precipitation-based intensity-duration-frequency (PREC-IDF) curves. This study evaluates the Next-Generation IDF (NG-IDF) framework, an extension of PREC-IDF that incorporates total water available for runoff (precipitation minus changes in snow water equivalent), in two contrasting Alaskan watersheds of Department of Defense (DoD) significance: the Little Chena River Basin (LCRB) in interior Alaska, a tributary of the Chena River that flows through Fort Wainwright and near Eielson Air Force Base, and the Upper Ship Creek Basin (USCB), which drains Joint Base Elmendorf-Richardson near Anchorage. Using long-term SNOTEL observations and event-based rainfall-runoff modeling, NG-IDF and PREC-IDF flood estimates were compared against observation-based flood frequency analyses. Results show that NG-IDF consistently reduces flood-estimation bias by 15–20% relative to PREC-IDF, particularly for snowmelt- and ROS-dominated events. In the interior LCRB, permafrost conditions can substantially amplify flood responses during snowmelt events, an effect not explicitly represented in standard design tools. These findings demonstrate that NG-IDF provides a more physically consistent and transferable framework for flood estimation in cold regions, with potential relevance to mission-critical DoD installation resilience. Projected increases in ROS frequency and permafrost degradation across Alaska further emphasize the need to integrate physics-based hydrologic models that explicitly represent snow and permafrost processes to enhance design resilience and operational readiness for military and other critical infrastructure.

Yan, Hongxiang (ORCID:000000022387403X)↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

A multi-dimensional dataset for two-phase instability in low pressure natural circulation based on direct transient local measurement

Thermal hydraulic instability can challenge the control and the safety of nuclear reactors. This experimental research captures and investigates the instability in a low-pressure (1–10 atmospheres) natural circulation loop with an adiabatic chimney installed above the heated section. Direct transient local measurement of two-phase flow is performed at multiple axial locations along the flow channel with thermocouples and conductivity probes traversed by customized high-precision mechanisms. Based on the periodicity of oscillations, a post-processing method is proposed to align the data captured non-simultaneously to reconstruct the instability behavior in one representative period. The averaging operation over multiple oscillation cycles is performed to reduce the random errors. Cyclic phenomena are clearly demonstrated by the post-processed data, and rapid void fraction change induced by the flashing is observed to be significant in the driving mechanism for low pressure oscillations. Parametric effects of inlet subcooling, heat flux, inlet flow restriction and system pressure are studied within the experiment range, and qualitative results are explained and compared with existing literature. The ratio between the oscillation period and the travelling time of the fluid particle through the test section is compared with the theoretical value for the density wave oscillation. The new dataset contains directly measured transient multi-dimensional two-phase data along the flow channel for natural circulation under density wave oscillations. The generated dataset is valuable for the validation of system analysis codes and CFD codes in the simulation of natural circulation phenomena and dynamic two-phase flow.

42 ENGINEERING↗

Inversion of downhole electrical measurements for proppant mapping using very fast simulated annealing

Proppant mapping is critical for optimizing fracture treatment design and improving wells’ productivity. An electrode-based resistivity tool concept was developed earlier for proppant mapping in cased-hole wells. An array of insulating gaps is installed and cemented in place as a permanent part of the casing string. The electrical measurements are performed by imposing a voltage across each insulating gap, one at a time, before and after hydraulic fracture operations. The voltages across other insulating gaps near the transmitter gap are recorded. The method relies on direct excitation of the casing, which is expected to overcome the severe limitations of induction tools in cased-hole wells. A forward model based on a finite volume method has been developed to simulate the tool’s response to one or multiple fractures. To enable the implementation of such a practical system in multistage fractured horizontal wells, a fast and robust inversion approach is required. To that end, we have developed a divide-and-conquer approach based on a global optimization algorithm very fast simulated annealing (VFSA). Specifically, the original inverse problem is divided into subproblems and each subproblem can be solved separately using VFSA. The results indicate that our approach can invert the data and output widths and radii of multiple fractures without requiring a large number of forward simulations. The robustness of the inverse solver is also tested by adding Gaussian noise to the synthetic data. We tested example cases that demonstrate that when up to 5% noise is introduced, VFSA still provides very accurate inversion results with moderate uncertainties. Inversion results with some more realistic conditions, e.g., tilted fractures, complex fractures, and so on, are also presented.

Geochemistry & Geophysics↗

Developing a Vorticity-Velocity-Based Off-Body Solver to Perform Multifidelity Simulations of Wind Farms

Wind power has become a key player in satisfying the global energy needs. With increased market penetration, unanticipated unsteady loading induced failures, installation related reductions in power generation, and significant maintenance costs have underscored the need to predict the unsteady fluid-structure interactions related to turbine layout and off-design wind conditions. Contemporary turbine design tools are incapable of accounting for such loadings. As a result, researchers have started utilizing high-Performance-Computing (HPC) based Computational Fluid Dynamics (CFD) solvers, such as the U.S. Department of Energy sponsored ExaWind software package, to investigate these phenomena. Unfortunately, such HPC tools are computationally expensive for routine industrial use, often because of the sheer number of cells required to resolve the wake flowfield. This paper describes a preliminary effort to address this issue by developing a vorticity-velocity based CFD off-body solver, VorTran-M2-AMReX, that integrates directly with DOE's ExaWind wind turbine analysis system to perform accurate and reliable simulations of wind turbine/farm at a lower computational cost than ExaWind alone. This article summarizes work undertaken to date concerning the assembly of the proposed analysis tool, and provides preliminary validation and verification of the VorTran-M2-AMReX off-body solver.

adaptive mesh refinement↗